MEXICO ENERGY - MAJOR PROJECTS 05.Mar.10 _______________________________ ARAMONI EXPANDS OPERATIONS VILLAHERMOSA - CIUDAD DEL CARMEN
FYI we just achieved putting together a set of local essential resources for foreign companies to bid competitively on upstream Pemex tenders: MARKET CONSULTING • Pemex inside understanding • Project intellingence • Opportunity search & pursue EXPERT ASSISTANCE • High profile rep • Legal competence • Expert bid proposals coordination LOCAL SUPPORT • Strategic facilities (offices, stores, yards) • Logistics • Project staffing outsourcing • Industry knowlegde and connections On a specialty basis We will consider to provide these services to international oil companies pursuing work in Mexico Further: info@aramoni.com _______________________________ A special coverage for 2010 upstream opportunities follows: ONSHORE EXPLORATION & PRODUCTION Complete follow-up for 2010 tenders on DRILLING RIGS (12 lease contracts and 10 purchases) MARINE EXPLORATION & PRODUCTION Complete follow-up for 2010 UPMP tenders on DRILLING PACKAGES (19 lease contracts) JACKUPS (10 lease contracts) OFFSHORE PLATFORMS Kuil-A: Tetrapod (reinforced) MEASUREMENTS MWD LWD and Production Flow contract opportunities (budget: $275million) will soon be posted Our regular report afterwards _______________________________ ONSHORE EXPLORATION & PRODUCTION
DRILLING RIG Tenders for 2010 RFPs expected from March 1-3.South Division Contract: 3 leases with no purchase option Term: 730d 3 units 1000HP drawworks Status [BUDGET APPROVED] 4-6.South Division Contract: 3 leases with no purchase option Term: 730d 3 units 1500HP drawworks Status [BUDGET APPROVED] 7-9.South Division Contract: 3 leases with no purchase option Term: 730d 3 units 2000HP drawworks Status [BUDGET APPROVED] 10-12.South Division Contract: 3 leases with no purchase option Term: 730d 3 units 3000HP drawworks Status [BUDGET APPROVED] _______________________________ 13-17.North Division Commissioner: UPMP Contracts: Purchase 2 units/ 1000HP drawworks 1 unit / 1500HP drawworks 2 units/ 2000HP drawworks Status [BUDGET APPROVED] 18-22.South Division Commissioner: UPMP Contracts: Purchase 2 units/ 2000HP drawworks 3 units/ 3000HP drawworks Status [BUDGET APPROVED] _______________________________ Follow aramoni on Twitter and get timely announcements on Pemex's tenders as well as decisive news on the industry _______________________________ MARINE EXPLORATION & PRODUCTION
DRILLING PACKAGES Tenders for 2010 PEMEX UPMP: RFPs expected from March 1.North Division Contract: Lease with no purchase option Term: 1034d Location: GOM 1000HP drawworks Status [BUDGET APPROVED] 2.Marine Division Contract: Lease with no purchase option Term: 593d Location: AIKMZ-UOKMZ ("D") 1000HP drawworks Status [BUDGET APPROVED] 3.Marine Division Contract: Lease with no purchase option Term: 422d Location: AIKMZ-UOKMZ ("B") 1000HP drawworks Status [BUDGET APPROVED] 4.Marine Division Contract: Lease with no purchase option Term: 296d Location: AIAPC-UOAPC ("1")-REMI 1000HP drawworks Status [BUDGET APPROVED] 5.Marine Division Contract: Lease with no purchase option Term: 280d Location: AIC-UOC ("A") 1000HP drawworks Status [BUDGET APPROVED] _______________________________ 6.Marine Division [BIDDING] Contract: Lease with no purchase option Term: 231d (15.May.10-31.Dec.10) Location: Campeche basin Platform: 8-L Manik-A Well: Manik-12 Unit: Diesel electrical Depth: +20 000f 2000HP drawworks Bid follow-up Ref: 18575088-001-10 Release: 19.Feb.10 (Compranet) Site visit: 26.Feb.10 1st Clarification meeting: 01.Mar.10 2nd Clarification meeting: 04.Mar.10 3rd Clarification meeting: 05.Mar.10 (last) Closing: 10.Mar.10 (next) Proposal submission & opening: 16.Mar.10 Registered bidders 1.Todco 2.Nabors 3.COSL 4.Perforadora Central 5.Geofisica Marina de Exploracion 6.Blake Platform Rigs 7.GOIMAR Potential participants Status [BIDDING] Updated 05.Mar.10 7.Marine Division Contract: Lease with no purchase option Term: 396d Location: AIC-UOC ("IV") 2000HP drawworks Status [BUDGET APPROVED] 8.Marine Division Contract: Lease with no purchase option Term: 408d Location: AIC-UOC ("I") 2000HP drawworks Status [BUDGET APPROVED] 9.Marine Division Contract: Lease with no purchase option Term: 904d Location: AIC-UOKMZ ("IX") 2000HP drawworks Status [BUDGET APPROVED] 10.Marine Division Contract: Lease with no purchase option Term: 549d Location: AIC-UOC ("E") 2000HP drawworks Status [BUDGET APPROVED] 11.Marine Division Contract: Lease with no purchase option Term: 769d Location: AIC-UOC ("N") 2000HP drawworks Status [BUDGET APPROVED] 12.Marine Division Contract: Lease with no purchase option Term: 549d Location: AIC-UOC ("E") 2000HP drawworks Status [BUDGET APPROVED] 13.Marine Division Contract: Lease with no purchase option Term: 367d Location: AIC-UOC ("F") 2000HP drawworks Status [BUDGET APPROVED] 14.Marine Division Contract: Lease with no purchase option Term: 757d Location: AIC-UOC ("H") 2000HP drawworks Status [BUDGET APPROVED] 15.Marine Division Contract: Lease with no purchase option Term: 1478d Location: AIC-UOC ("CI") 2000HP drawworks Status [BUDGET APPROVED] _______________________________ 16.Marine Division Contract: Lease with no purchase option Location: AILT-UOLT ("W")-REMI-MIX 3000HP drawworks Term: 760d Status [BUDGET APPROVED] 17.Marine Division Contract: Lease with no purchase option Location: AIAPC-UOAPC ("XIII")-REMI 3000HP drawworks Term: 1306d Status [BUDGET APPROVED] 18.Marine Division Contract: Lease with no purchase option Location: AILT-UOLT ("X")-REMI 3000HP drawworks Term: 1456d Status [BUDGET APPROVED] 19.Marine Division Contract: Lease with no purchase option Location: AILT-UOLT ("V")-REMI 3000HP drawworks Term: 1048d Status [BUDGET APPROVED] ____________________________________ JACKUPS Tenders for 2010 PEMEX UPMP: RFPs expected from March 1.Marine Division Contract: Lease with no purchase option Term: 625d Location: AILT-UOLT A/E: V-REMI Depth: 250f Status [BUDGET APPROVED] _______________________________ 2.North Division Contract: Lease with no purchase option Term: 1034d Location: GOM Depth: 300f Status [BUDGET APPROVED] 3.Marine Division Contract: Lease with no purchase option Term: 412d Location: AILT-UOLT A/E: XLVIII-REMI Depth: 300f Status [BUDGET APPROVED] 4.Marine Division Contract: Lease with no purchase option Term: 698d Location: AIC-AIC-UOC A/E: S Depth: 300f Status [BUDGET APPROVED] _______________________________ 5.Marine Division Contract: Lease with no purchase option Term: 715d Location: AIKMZ-UOKMZ A/E: XL Depth: 350f Status [BUDGET APPROVED] 6.Marine Division Contract: Lease with no purchase option Term: 531d Location: AIC-UOKMZ A/E: I Depth: 350f Status [BUDGET APPROVED] 7.Marine Division Contract: Lease with no purchase option Term: 630d Location: AIC-AIKMZ-UOKMZ A/E: F Depth: 350f Status [BUDGET APPROVED] 8.Marine Division Contract: Lease with no purchase option Term: 485d Location: AIC-AIC-UOKMZ A/E: S Depth: 350f Status [BUDGET APPROVED] _______________________________ 9.Marine Division Contract: Lease with purchase option Term: 3621d Location: GOM A/E: P Depth: 350f Drawworks: 3000HP Status [BUDGET APPROVED] 10.Marine Division Contract: Lease with purchase option Term: 3621d Location: GOM A/E: P Depth: 350f Drawworks: 3000HP Status [BUDGET APPROVED] _______________________________ Follow aramoni on Twitter and get timely announcements on Pemex's tenders as well as decisive news on the industry _______________________________ OFFSHORE PLATFORMS
Kuil-A: Tetrapod (reinforced) [NEW] Project Offshore terapod platform Scope: Engineering/ procurement/ construction/ loading/ fixing Location: Campeche basin GOM Term: 370 days starting 25.May.10 Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $m+ Contract Type: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-002-10 Release: 25.Feb.10 Site visit: n/a 1st clarification meeting: 11.Mar.10 (next) Closing: 08.Apr.10 Legal/ administrative preliminary revision: Recomended Submission & opening: 14.Apr.10 Ruling: 07.May.10 Registered bidders Potential participants 1.Swecomex 2.Industria del Hierro (ICA Fluor Daniel) 3.Dragados 4.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 5.Construcciones y Equipos Latinoamericanos (Protexa) 6.Bosnor 7.Shaw 8.J Ray Mcdermott 9.CIT 10.Grupo Constructor Global 11.Tradeco Status BIDDING Updated 26.Feb.10 _______________________________ Our regular report as follows:
AramoniReport CONTENT: PROJECT & STATUS OF POSTED TENDERS PEMEX EXPLORATION & PRODUCTION (PEP) OFFSHORE PLATFORMS LIVING QUARTER HA-LT-01 • Project managment support for HA-LT-01 [AWARDED: DIRAC $1.3million] Project Tender History Platform History MULTIPLE SERVICE CONTRACTS MSC History PEMEX REFINING (PR) INTEGRAL PROJECT FOR CLEAN FUELS • Expert engineering services (Diesel Phase) [AWARDED: Inelectra North America $25million] • Salina Cruz & Minatitlan [AWARDED: ICA Fluor Daniel $624million/ contact info by request] • Cadereyta & Madero [AWARDED: ICA Fluor Daniel $638million/ contact info by request] • Tula & Salamanca [VOID: A new RFPs to be announced shortly] • Sulphur recovery plant SRU-2 (3rd round) [SUBMITTED] FEDERAL COMMISSION OF ELECTRICITY (CFE) POWER PLANTS • Wind Oaxaca II, III, IV [SUBMITTED] • CC-Solar Agua Prieta II (2nd-round) [2nd DELAY] • CT-TG Baja California II phase 1 [SUBMITTED] • CC Poza Rica [SUBMITTED] • CC NORTE II [4th DELAY] Power Plant History LNG PROJECTS No major tenders currently Coming shortly: 400 mcfd / 230 km / $600m+ San Luis Potosi / Guanajuato / Queretaro _________________________________________________________________ AramoniReport SUMMARY & FOLLOW-UP FOR POSTED TENDERS (coming current & recent) PEMEX EXPLORATION & PRODUCTION (PEP) OFFSHORE PLATFORMS LIVING QUARTER HA-LT-01 Project management support for platform coming tender [AWARDED] Scope: Idem Term: 543 days (18 months) Locations: Madero Tamaulipas (first 13-month period) Offshore (last 5-month preriod) Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $750 000+ (10m+ local currency) Contract Type: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Local content: n/a Subcontracts allowed: n/a Bid follow-up Ref: 18575106-022-09 Release: 03.Sep.09 Site visit: n/a 1st clarification meeting: 08.Sep.09 2nd clarification meeting: 15.Sep.09 3rd clarification meeting: 22.Sep.09 4th clarification meeting: 28.Sep.09 Closing: 30.Sep.09 Submission & opening: 06.Oct.09 Registered bidders 1.COORDINACION TECNICO ADMINISTRATIVA DE OBRAS 2.TECHMAN GROUP 3.GLM COMUNICACIONES 4.NAVARRETE NAVARRO CONSTRUCTORES 5.CONSTRUCTORES Y CONSULTORES DE TAMAULIPAS 6.CONSULTORÍA INTEGRAL EN INGENIERÍA 7.GRUPO OPERADOR DE INGENIERIA Y MONTAJES 8.SUPPLY OUTSOURCING SERVICES 9.BUREAU VERITAS MEXICANA 10.DIRAC 11.GESTION INTEGRAL EMPRESARIAL 12.NARCIA SERVICE 13.SGS DE MEXICO 14.CONSTRUCTORA G T 15.CONSULTORIA, SUPERVISION TECNICA Y OPERACION EN SISTEMAS 16.GRUPO DIARQCO 17.DESARROLLO, TECNOLOGÍA Y PLANEACIÓN 18.BUFETE DE MANTENIMIENTO PREDICTIVO INDUSTRIAL 19.COTER 20.GRUPO SAFFC DE MÉXICO 21.ORGANIZACION DE CALIDAD SIGLO XXI 22.VISION INTEGRAL GENERADORA DE EMPRESAS NACIONALES 23.FELIPE OCHOA Y ASOCIADOS (FOA) Potential participants Status AWARDED Ruling: 12.Nov.09 DIRAC: $1.3million Updated 14.Nov.09 Project tender history: 40. HA-LT-01: Living quarter module [VOID] Project 187 living quarter module & interconnection bridge Scope: Engineering/ procurement/ construction/ loading/ fixing/ transport/ installation Location: Campeche basin GOM Term: 660 days starting 04.Sep.08 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $20m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-004-08 Release: 20.Mar.08 1st clarification meeting: 07.Apr.08 2nd clarification meeting: 18.Apr.08 3rd clarification meeting: 06.May.08 10th clarification meeting & closing: 10.Jul.08 Submission & opening: 16.Jul.08 Registered bidders 1.Dragados 2.Industria del Hierro (ICA Fluor Daniel) 3.Swecomex 4.J Ray McDermott 5.Heerema Marine Contractors 5.Keppel SLP 6.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 7.Oceanografia Potential participants Grupo Constructor Global, JA Energy Fab, Tradeco, Evya, Ingelectric, SIDO E, GI, AILT, Industrias W, Alcatel, Swath, AVC, Sari, Thales, Udee, Rockwell, Dynamic Industries, Cygnus Status VOID Tender declared VOID (2nd round) on 11.Sep.08 A new RFPs to be announced shortly Reference 1st-round tender ruled VOID on 19.Jul.07 (full report below) Updated 12.Sep.08 40. HA-LT-01: Living quarter module [VOID] Project 187 living quarter module & interconnection bridge Scope: Engineering/ procurement/ construction/ loading/ fixing/ transport/ installation Location: Campeche basin GOM Term: 660 days starting 01.Aug.07 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $20m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-013-07 Release: 29.Mar.07 Site visit: 12.Apr.07 1st clarification meeting: 17.Apr.07 8th clarification meeting: 29.May.07 Closing: 29.May.07 Submission & opening: 04.Jun.07 Registered bidders 1.Dragados 2.Industria del Hierro (ICA Fluor Daniel) 3.Swecomex 4.Grupo Constructor Global 5.JA Energy Fab 6.Tradeco 7.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 8.Evya 9.Keppel SLP 10.Ingelectric Potential participants SIDO E, GI, AILT, Industrias W, Alcatel, Swath, AVC, Heerema Status VOID Tender ruled on 19.Jul.07 A new RFP to be released shortly Updated 31.Jul.07 OFFSHORE PLATFORM HISTORY
50. Kab-B 18575106-021-09/ 21.Sep.09/ Construcciones Mecanicas de Monclova/ $13million 48. PG-ZAAP-C Power generation 18575106-004-09/ 11.Sep.09/ Dragados Offshore de Mexico/ $202million 49. Kambesah 18575106-019-09/ 28.Jul.09/ Construcciones Mecanicas de Monclova/ $16million Offshore equipment recondition/ Holkan jack-up platform & PM-4500 drilling rig 18575107-038-08/ Tender declared VOID on 15.Dec.08 40. HA-LT-01: Living quarter module 18575106-004-08/ Tender declared VOID (2nd round) on 11.Sep.08 47. Akal-Te 18575106-005-08/ 09.May.08/ Dragados Offshore de Mexico/ $11.5million 46. Ixtal-B 18575106-035-07/ 11.Feb.08/ Construcciones Mecanicas Monclova (COMMSA-GIMSA)/ $25million 45. Kab-A 18575106-022-07/ 28.Aug.07/ Industria del Hierro (ICA Fluor Daniel)/ $9.5million 44. Atun-D 18575106-010-07/ 20.Jul.07/ Construcciones Mecanicas Monclova (COMMSA-GIMSA)/ $19million 43. Sinan-118 18575106-020-07/ 20.Jul.07/ Construcciones Mecanicas Monclova (COMMSA-GIMSA)/ $11million 42. Sinan-So 18575106-019-07/ 20.Jul.07/ Swecomex/ $12million 41. Yaxche-B 18575106-017-07/ 19.Jul.07/ Industria del Hierro (ICA Fluor Daniel)/ $11.5million 40. HA-LT-01: Living quarter module 18575106-013-07/ 19.Jul.07/ Void 39. Tumut-A: Tetrapod 18575106-009-07/ 12.Jul.07/ Construcciones Mecanicas Monclova (COMMSA-GIMSA)/ $24million 38. HA-RE-01: LIVING QUARTER MODULE (2nd round) 18575106-036-06/ 19.Jul.07/ Void CHEMUL: Underwater Platform 18575107-091-06/ 08.Feb.07/ Void PLATFORM COMPLEMENTARY WORKS (2nd-round) 18575108-084-06/ 15.Jan.07/ Oceanografia/ $47million 37. HA-CA-01: LIVING QUARTER MODULE 18575106-011-06/ 25.Oct.06/ Industria del Hierro (ICA Fluor Daniel)/ $90million LIVING QUARTER MODULE (Re-pumping) 18575108-039-06/ 15.Aug.06/ Canceled Platform conclusion (Akal) 18575106-008-06/ 08.Jun.06/ Void Platform linking (KMZ) 18575106-007-06/ 10.May.06/ Demar Instaladora y Constructora/ $40million 36. HA-AJ-01 (Living quarter module) 18575106-027-05/ 25.Jan.06/ Swecomex/ $60million FPSO (Supervision) 18200002-020-05/ 09.Jan.06/ Cygnus Industrial/ $3.64million 35. Carpa-B (Gathering) 18575008-012-05/ 22.Jul.05/ Shaw Mexican Holdings-Shaw Global Energy Services/ $22million 34. Bagre-C (Gathering) 18575008-082-04/ 11.May.05/ SIPHNOS/ $15.6million 33. PP-AKAL-W (Drill) 18575106-042-04/ 10.Jan.05/ Construcciones Mecanicas de Monclova (COMMSA-GIMSA)/ $39.5million 32. PP-AKAL-Q (Drill) 18575106-041-04/ 17.Dec.04/ Construcciones Mecanicas de Monclova (COMMSA-GIMSA)/ $40million 31. PP-SIHIL-A (Dril) 18575106-040-04/ 14.Dec.04/ Construcciones Mecanicas de Monclova (COMMSA-GIMSA)/ $36.5million 30. PB-KU-H (Production) 18575106-022-04/ 24.Nov.04/ Bosnor/ $162million 28/29. HA-KU-H & ZAAP-C (Living quarters) 18575106-027-04/ 10.Dec.04/ Berry Contracting - Berry GP - Inelectra/ $149million 26/27. HA-KU-S & M (Living quarters) 18575106-025-04/ 29.Oct.04/ Keppel Offshore and Marine USA - SLP Engineering Limited - Anfels - Gulf Island/ $164million 25. CITAM-A (4-legs) 18575106-020-04/ 01.Sep.04/ Construcciones y Equipos Latinoamericanos (PROTEXA)/ $24million 24. CB-ZAAP-C (Compression) 18575106-017-04/ Cancelled 23. PB-ZAAP-C (Link/production) 18575106-016-04/ Cancelled 22. PP-Zaap-A (Drill) 18575106-005-04/ 07.May.04/ ICA Fluor Daniel/ $43million 21. PP-Zaap-B (Drill) 18575106-006-04/ 21.May.04/ Industria del Hierro (ICA Fluor Daniel)/ $39million 20. PP-Zaap-D (Drill) 18575106-007-04/ 21.May.04/ Industria del Hierro (ICA Fluor Daniel)/ $42million 19. PP-KU-S (Drill) 18575106-002-04/ 07.May.04/ Industria del Hierro (ICA Fluor Daniel)/ $45million 18. YAXCHE-A (8L-Drill) 18575106-010-03/ 22.Mar.04/ COMINTER/ $22.5 million 17. PB-KU-M (Production) 18575106-007-03/ 01.Jun.04/ Swecomex-Condumex (parent company)/ $130million 16. PB-KU-S (Production) 18575106-008-03/ 01.Jul.04/ Swecomex/ $225million 15. PB-KU-A2 (Production) 18575106-009-03/ 16.Jul.04/ Dragados Offshore de Mexico/ $185million 13/14. SINAN-A/B (8L-Drill) 18575106-006-03/ 23.Feb.04/ Construccion Ingenieria y Montaje Integral (CIMISA)/ $43million 12. Lobina-1 (Gathering) 18575106-003-03/ 02.Apr.04/ Shaw Mexican Holdings/ $15.5million 10/11. SINAN-C/D (8L-Drill) 18575087-017-03/ 16.Jan.04/ Construcciones Mecanicas de Monclova (COMMSA/GIMSA)/ $44million 9. PP-KU-C (Drill) 18575087-015-03/ 07.Oct.03/ Bosnor/ $37million 7/8. PP-Maloob-A/B (Drill) 18575087-009-03/ 12.Sep.03/ Swecomex/ $ 80.5million 6. Manik-A (Drill) 18575087-008-03/ 02.Sep.03/ Swecomex/ $33.5million 5. KU-A2 (Link) 18575087-002-03/ 08.Aug.03/ Construcciones Mecanicas de Monclova (COMMSA/GIMSA)/ $48million 3/4. MAY-A/B (Drill) 18575087-001-03/ 01.Jul.03/ ICA Fluor Daniel/ $55million 2. Ixtal-A (8L-Gathering) 18575038-019-02/ Bay de Mexico 1. Lankahuasa-1 (Gathering) 18575008-062-02/ ICA Fluor Daniel FOR REFERENCE DETAILED INFO ON THESE TENDERS IS POSTED IN THE NEXT PAGE ___________________________________ FYI, we have got a comprehensive understanding of these tenders and offer expert tailor-made assistance to international companies pursuing projects in Mexico A description of our services after the report Contact: info@aramoni.com ____________________________________ MULTIPLE SERVICE CONTRACTS No major tenders currently
MSC History: 21. BURGOS VIII-C 18575110-003-09/ Tender CANCELED on 02.Dec.09/ A new RFPs to be announced early 2010 20. BURGOS VIII-B 18575110-002-09/ Tender CANCELED on 15.Dec.09/ A new RFPs to be announced early 2010 19. BURGOS VIII-A 18575110-001-09/ 17.Aug.09/ Industrial Perforadora de Campeche (IPC)/ $578million 18. CHICONTEPEC V 18575051-005-09/ Tender declared VOID on 11.May.09/ A new RFPs to be announced 17. CHICONTEPEC IV 18575051-046-08/ 27.Mar.09 /WEATHERFORD DE MEXICO/ $646million 16. CHICONTEPEC III 18575051-044-08/10.Mar.09/ Dowell Schlumberger - OFS Servicios - Drillers Technology/ $687million 15. CHICONTEPEC II 18575051-050-06/ 13.Jun.07/ Dowell Schlumberger de Mexico/ $1395million/ 4yrs 14. BLOCK EURO 18575110-036-06/ Tender declared VOID on 06.Mar.07/ A new RFPs to be announced 13. BLOCK MONCLOVA 18575110-035-06/ 22.Mar.07/ Construcciones Mecanicas de Monclova (COMMSA)/ $440million/ 15yrs 12 BLOCK NEJO 18575110-034-06/ 05.Mar.07/ Grupo Cobra (es)/ $930million/ 15yrs Updated 09.Mar.07 11. PANDURA-ANAHUAC 18575008-060-04/ 26.Oct.04/ Industrial Perforadora de Campeche (Mx) - Desarrollo y Servicio Petrolero (Mx)/ $900million/ 15yrs 10. RICOS 18575008-061-04/ 08.Feb.05/ VOID 9. MONCLOVA 18575008-064-04/ 15.Feb.05/ Hullera Mexicana (Mx) - Energy Milenium (Mx) - Andrews Technologies de Mexico (Mx)- Yuma Exploration (US) - Aries Operating (US)/ $456million/ 15yrs 8. PIRINEO 18575008-065-04/ 24.Feb.05/ Constructora Industrial Monclova (Mx) - Materiales La Gloria (Mx) - Alianz Petroleum (Mx) - Steel Serv (Mx) - Suelopetrol (Ve) - NCT (Ve) - Petrotesting Colombia (Co)/ $645million/ 15yrs 7. OLMOS 18575008-138-03/ 15.Jan.04/ Lewis Energy Group/ $343.6million/ 15yrs 6. FRONTERIZO 18575008-137-03/ 19.Nov.03/ Petroleo Brasileiro Mexico: Petrobras-Teikoku Oil Co-D&S Petroleum (Diavaz)/ $265million/ 15yrs 5. RICOS 18575008-128-03/ 12.Nov.03/ VOID 4. CORINDON-PANDURA 18575008-131-03/ 05.Nov.03/ VOID 3. MISION 18575008-130-03/ 30.Oct.03/ Elina del Bajio: Elina-Techint-Industrial Perforadora de Campeche (IPC)/ $1,036million/ 20yrs 2. CUERVITO 18575008-136-03/ 23.Oct.03/ Petroleo Brasileiro Mexico: Petrobras-Teikoku Oil Co-D&S Petroleum (Diavaz)/ $260million/ 15yrs 1. REYNOSA-MONTERREY 18575008-129-03/ 16.Oct.03/ Repsol Exploracion-YPS/ $2,437million/ 20yrs FOR REFERENCE DETAILED INFO ON THESE TENDERS IS POSTED IN THE NEXT PAGE ___________________________________ FYI, we have got a comprehensive understanding of these tenders and offer expert tailor-made assistance to international companies pursuing projects in Mexico A description of our services after the report Contact: info@aramoni.com ____________________________________ PEMEX REFINING (PR) INTEGRAL PROGRAM FOR CLEAN FUELS EXPERT ENGINEERING SERVICES (Diesel Phase) [AWARDED] Scope: 1.Supervision of FEED for diesel desulphurization plants 2.Bid documentation for tendering the IPC contracts for these projects 3.Basic engineering for plant integration and auxiliary services 4.Coordination with projets for naphta desulphurization (below) Location: Pemex refineries of Tula, Salamanca, Madero, Minatitlan, Salina Cruz & Cadereyta Term: 570 days starting 16.Nov.09 Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $1.5m+ (20m+ local currency) Contract Type: Unit prices Down payment: 50% annually budget for 2009 Selection basis: Lowest price bid from compliant proposals Local content: n/a Subcontracts allowed: n/a Bid follow-up Ref: 18572039-006-09 Release: 25.Aug.09 Site visit: n/a 1st clarification meeting: 02.Sep.09 2nd clarification meeting: 09.Sep.09 3rd clarification meeting: 15.Sep.09 4th clarification meeting: 23.Sep.09 5th clarification meeting: 02.Oct.09 6th clarification meeting & questioning deadline: 07.Oct.09 Closing: 13.Oct.09 Submission & opening: 19.Oct.09 Registered bidders 1.Conip 2.Jacobs 3.Inelectra 4.CH2M Hill International 5.Technip 6.Spisa 7.Norcontrol 8.SGS 9.ABS 10.Jantesa Potential participants Status AWARDED Ruling: 17.Nov.09 Inelectra North America: $25million Updated 27.Nov.09 SALINA CRUZ & MINATITLAN UNITS [AWARDED] Projects Description: Naphta desulphurization units (2) Location: Salina Cruz & Minatitlan refinery complexes Scope: Engineering Procurement Construction Integration Capacitiy 1.Salina Cruz: 2.Minatitlan: Construction term: 1290 days starting 19.Mar.10 Selection basis: Lowest price bid amongst compliant proposals Local content: Contracts (2) Commissioner: Pemex PR (Govt) Type: Combined lump sum & unit prices Payment/milestone: Fronting: 30% annually budget every year Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Company/consortium from countries having a free trade agreement with Mexico Experience required: 1.Successful EPC contracts for hydrocarbon process projects up to $200m+ in the last 5 years 2.It should include at least a catalitic reaction and/or a destilation process currently in operation Combine equity: $75m+ (1 billion Pesos) Bid follow-up Ref: 18572039-005-09 Release: 28.Jul.09 Site visit: 12-13.Aug.09 1st Clarification meeting: 19.Aug.09 2nd Clarification meeting: 28.Aug.09 3rd Clarification meeting: 10.Sep.09 4th clarification meeting: 25.Sep.09 5th clarification meeting: 09.Oct.09 6th clarification meeting: 23.Oct.09 7th clarification meeting: 06.Nov.09 8th clarification meeting: 20.Nov.09 9th clarification meeting: 04.Dec.09 Questioning deadline & 10th clarification meeting: 18.Dec.09 11th clarification meeting: 30.Dec.09 Closing: 09.Jan.10 Proposal submission & opening: 15.Jan.10 Registered bidders 1.ACS 2.ICA Fluor Daniel 3.Spisa 4.Technip 5.Sener 6.Sadeven 7.OHL 8.ABB Italia-ABB Mexico 9.Siemens 10.Isolux 11.Samsung 12.Techint 13.Spisa 14.Mitsui 15.ARB Arendal 16.Tecnimont Potential participants Ruhrpumpen, ISA, Automation & Control, Emerson, SK Engineering & Construction, Vica, Thales, Barlett, Integracion de Sistemas de Actuacion, Invensys, Automation & Control Solutions, Pepperl+Fuchs, Ingersoll Rand Actual proposals 1.Technip Italy/ Technip de México/ Isolux Ingeniería/ Isolux de México 2.Saipem/ Saigut 3.ICA Flour Daniel 4.ACS Servicios, Comunicaciones y Energía México/ Dragados Industrial/ ACS Servicios, Comunicaciones y Energía/ Senermex Ingeniería y Sistemas 5.ABB/ ARB Arendal/ Worley Parsons México Ingeniería 6.Tecnimont/ Grupo Samsung Ingeniería de México Status SUBMITTED Ruling: 25.Feb.10 ICA Fluor Daniel: $624million (contact info by request) Updated 26.Feb.10 CADEREYTA & MADERO UNITS [AWARDED] Projects Description: Naphta desulphurization units (2) Location: Cadereyta & Madero refinery complexes Scope: Engineering Procurement Construction Integration Capacitiy 1.Cadereyta: 2.Madero: Construction term: 1320 days starting 21.Sep.09 Selection basis: Lowest price bid amongst compliant proposals Local content: Contracts (2) Commissioner: Pemex PR (Govt) Type: Combined lump sum & unit prices Payment/milestone: Fronting: 30% annually budget every year Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Company/consortium from countries having a free trade agreement with Mexico Experience required: 1.Successful EPC contracts for hydrocarbon process projects up to $200m+ in the last 5 years 2.It should include at least a catalitic reaction and/or a destilation process currently in operation Combine equity: $75m+ (1 billion Pesos) Bid follow-up Ref: 18572039-001-09 Release: 12.Feb.09 Site visit: 23-24.Feb.09 1st Clarification meeting: 05.Mar.09 12th Clarification meeting: 07.Jul.09 Questioning deadline: 12.Jul.09 13th Clarification meeting & closing: 14.Jul.09 Proposal submission & opening: 20.Jul.09 Registered bidders 1.Inelectra North America 2.Technip 3.Saimex 4.Spisa 5.Cicsa 6.Sener 7.Sadeven 8.ICA Fluor Daniel 9.Jantesa 10.ABB 11.Tecnicas Reunidas 12.Hegues 13.Techint 14.Siemens 15.GS Engineering and Construction Corp 16.Prolec GE 17.ARB Arendal Potential participants Consutec, K Tronix, Samsung, Uhde, Dragados, Siemens, Isolux, SK Engineering & Construction, Termotecnia, Sojitz, OHL Industrial, Solucion, Emerson, Therom, Invensys, Automatizacion y Control, Peper LT Fuchs, Automation & Control, K Tronix, Reciptech, Rockwell, Vica, Analitica, Thales, Yokogawa, Sulzer Chemtech, Thales, Kentech ME&I, Setemi, Sapi, Idom, Galcor, Ruhrpumpen, GEA, Orben, Dupont Status AWARDED Ruling: 21.Aug.09 ICA Fluor Daniel: $638million (contact info by request) Updated 21.Aug.09 TULA & SALAMANCA UNITS [VOID] Projects Description: Naphta desulphurization units (2) Location: Tula & Salamanca refinery complexes Scope: Engineering Procurement Construction Integration Capacitiy 1.Tula: 2.Salamanca: Construction term: 45 months (1350 days) starting 25.May.09 Selection basis: Lowest price bid amongst compliant proposals Local content: Contracts (2) Commissioner: Pemex PR (Govt) Type: Combined lump sum & unit prices Payment/milestone: Fronting: n/a Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $90m+ (1 billion Pesos) Bid follow-up Ref: 18572039-006-08 Release: 11.Sep.08 Site visit: 18-19.Sep.08 1st Clarification meeting: 25.Sep.08 16th Clarification meeting: 19.Mar.09 Questioning deadline: 22.Mar.09 17th Clarification meeting and closing: 24.Mar.09 Proposal submission & opening: 30.Mar.09 Ruling: 29.Apr.09 Registered bidders 1.Jantesa 2.Sadeven 3.Samsung 4.ABB 5.ICA Fluor Daniel 6.Hegues 7.Saimex 8.Sener 9.Dragados 10.Siemens 11.Isolux 12.SK Engineering & Construction 13.CICSA 14.Termotecnica 15.Techint 16.Sojitz 17.OHL Industrial 18.Inelectra North America 19.Prolec GE 20.SAPI Potential participants Solucion, Emerson, Therom, Invensys, Automatizacion y Control, Peper LT Fuchs, Automation & Control, K Tronix, Reciptech, Rockwell, Vica, Analitica, Thales, Yokogawa, Schrader Camargo Submitted proposals 1.Samsung Engineering Co 2.Saimexicana - Saipem 3.ICA Fluor Daniel 4.Isolux - Jantesa 5.ACS Servicios Comunicaciones y Energía - Dragados Industrial - ASC Servicios Comunicaciones y Energía México - Senermex Ingeniería y Proyectos - Proyectos y Desarrollo de Infraestructura Status VOID Tender declared VOID on 28.May.09 A new RFPs to be announced shortly Updated 29.May.09 SULPHUR RECOVERY PLANT SRU-2 (3rd round) [DECISION PENDING] Project Description: 80 TPD for first line A & preparations for line B Location: Salamanca refinery complex Scope: Engineering Procurement Construction Integration Construction term: 540 days starting 16.Mar.10 Selection basis: Lowest price bid amongst compliant proposals Local content: 10% Contracts (2) Commissioner: Pemex PR (Govt) Type: Combined lump sum & unit prices Payment/milestone: Fronting: 15.25% annually budget for 2010 Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from any country Experience required: Design and construction of similar industrial plants Combine equity: $25+ (330million local currency) Bid follow-up Ref: 18576173-044-09 Release: 10.Dec.09 Site visit: 17.Dec.09 1st Clarification meeting: 18.Dec.09 2nd Clarification meeting: 30.Dec.09 3rd Clarification meeting: 13.Jan.10 4th Clarification meeting & questioning deadline: 27.Jan.10 Closing: 29.Jan.10 Proposal submission & opening: 04.Feb.10 Registered bidders 1.Lipsa 2.SAPI 3.Conip 4.Linde 5.Synergy Baruk 6.Inelectra 7.Spisa 8.Jantesa 9.Techint 10.Abengoa 11.Coimsur Potential participants See reference ternders below Status SUBMITTED Updated 07.Feb.10/rev 05.Mar.10 Previuos ref 2: SULPHUR RECOVERY PLANT SRU-2 (2nd round) [VOID] Projects Description: 160 TPD in two lines Location: Salamanca refinery complex Scope: Engineering Procurement Construction Integration Construction term: 540 days starting 26.Aug.09 Selection basis: Lowest price bid amongst compliant proposals Local content: 10% Contracts (2) Commissioner: Pemex PR (Govt) Type: Combined lump sum & unit prices Payment/milestone: Fronting: 15.25% annually budget every year Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from any country Experience required: Design and construction of similar industrial plants Combine equity: $25+ (330million local currency) Bid follow-up Ref: 18576173-020-09 Release: 23.Apr.09 Site visit: 04.May.09 1st Clarification meeting: 07.May.09 2nd Clarification meeting: 12.May.09 2nd Site visit: 15.May.09 8th Clarification meeting: 03.Jul.09 Questioning deadline: 05.Jul.09 Closing: 07.Jul.09 Proposal submission & opening: 13.Jul.09 Registered bidders 1.Conip 2.ICA Fluor Daniel 3.Schrader Camargo 4.Coimsur 5.Inelectra North America 6.Samsung Engineering 7.ARB Arendal 8.Jantesa 9.Linde 10.Abengoa 11.Coopsa 12.Lipsa 13.Techint 14.OHL Industrial 15.Technip 16.Saimex 17.Spisa Potential participants Emerson, Man Ferrostaal, K Tronix, Siemens, Shands & Jurds, Areche, Tradeco, SK Engineering and Construction, Atzco, Automation and Control, Tyler, Peperl + Fuchs, Ingersoll Rand, Galcor, Vica, CDI Status VOID Tender declared void on 28.Aug.09 A new RFPs should be announced shortly Updated 04.Sep.09 Previous Ref 1: SULPHUR RECOVERY PLANT SRU-2 [CANCELED] Projects Description: 160 TPD in two lines Location: Salamanca refinery complex Scope: Engineering Procurement Construction Integration Construction term: 589 days starting 06.Jul.09 Selection basis: Lowest price bid amongst compliant proposals Local content: 10% Contracts (2) Commissioner: Pemex PR (Govt) Type: Combined lump sum & unit prices Payment/milestone: Fronting: 15.25% annually budget every year Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from any country Experience required: Design and construction of similar industrial plants Combine equity: $23+ (330million local currency) Bid follow-up Ref: 18576173-013-09 Release: 12.Mar.09 Site visit: 17.Mar.09 1st Clarification meeting: 19.Mar.09 Potential participants (for the record) 1.ICA Fluor Daniel 2.Samsung 3.ARB Arendal 4.Tradeco 5.Abengoa 6.Conip 7.OHL 8.Inelectra Noth America 9.SK Engineering and Construction 10.Techint 11.Inelectra 12.Linde 13.Jantesa Status CANCELED Tender declared CANCELED on 17.Mar.09 Normally a new RFPs should be announced later Updated 20.Mar.09 ____________________________________ We provide the expertise to produce compliant tender proposals for PEMEX & CFE requests ____________________________________ FEDERAL COMMISSION OF ELECTRICITY (CFE)
POWER PLANTS WIND OAXACA II, III, IV [DECISION PENDING] this is a new 3-winner format tender in order to assign three individual/independent IPP contracts Project Capacity: 3x101.4 Mw +/-2% Location: La Ventosa area in Oaxaca Construction term: 526 days starting 15.Jul.10 through 23.Dec.11 Contracts IPP (3) Term: 20yrs Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $42m+ Local content: 25% Bid follow-up Ref: 18164093-040-09 Release: 03.Nov.09 Site visit: 11.Nov.09 1st Clarification meeting: 02.Dec.09 2nd Clarification meeting: 25.Jan.10 Closing: 05.Feb.10 Proposal submission & technical part opening: 11.Feb.10 Economic part opening: 26.Feb.10 Registered bidders 1.Iberdrola 2.Energias Ambientales de Oaxaca 3.Suez Energia 4.Enerfin 5.GE 6.Acciona 7.Abengoa 8.Siemens 9.Leokon Korea 10.Fenosa 11.Notus Energy 12.Gimsa 13.ICA Fluor Daniel 14.Gesa 15.Mitsui Potential participants Desarrollos Eolicos Mexicanos, ENHOL, Capital Energy, Energia y Recursos Ambientales (EYRA), Enel, Mitsubishi, Gamesa Eolica, Endesa, EDF, Elecnor, Aldesa, Promotora Ambiental, Competitive Power Ventures Status SUBMITTED Updated 26.Feb.10/rev 05.Mar.10 Previous tender ref: WIND OAXACA I Project Capacity: 101.4 Mw Location: La Ventosa Oaxaca Term: 473 days from 14.Aug.09 to 30.Nov.10 Contract IPP 20yrs Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $50m+ Local content: 25% Bid follow-up Ref: 18164093-031-08 Release: 02.Sep.08 Site visit: 09.Sep.08 1st Clarification meeting: 02.Oct.08 2nd Clarification meeting: 21.Nov.08 3rd Clarification meeting: 12.Feb.09 4th Clarification meeting: 11.Mar.09 5th Clarification meeting: 23.Mar.09 6th Clarification meeting: 26.Mar.09 (last) Closing: 16.Feb.09 Technical & economic proposal submission: 06.Apr.09 Technical proposal opening: 06.Apr.09 Economic proposal opening: 29.Apr.09 (next) Ruling: 11.May.09 Registered bidders 1.Iberdrola 2.Desarrollos Eolicos Mexicanos 3.ENHOL 4.Abengoa 5.Fenosa 6.Enerfin 7.Capital Energy 8.Prolec GE International 9.Suez Energia 10.Energia y Recursos Ambientales (EYRA) 11.Acciona 12.Leasing Operations Potential participants Enel, Mitsubishi, Gamesa Eolica, Endesa, EDF, Mitsui, Elecnor, Aldesa, Promotora Ambiental, Competitive Power Ventures Submitted proposals 1.Acciona Energia de Mexico 2.Energia y Recursos Ambientales (EYRA)- Energias Ambientales de Guadalajara 3.Enerfin - Elecnor Status AWARDED Energia y Recursos Ambientales (EYRA)- Energias Ambientales de Guadalajara: $0.0660 USD/kWh Updated 15.May.09 CC-SOLAR POWER PLANT AGUA PRIETA II (2nd-round) [2nd DELAY] Project Description: Combined cycle plant + solar camp Capacity: 343.4-464.6 MW (summer conditions) Scope: Design/ engineering/ procurement (partial) / construction/ installation/ tests/ training/ commissioning Equipment supplied by Commissioner: Gas turbogenerators/ steam generators/ auxiliary systems/ solar camp & auxiliary systems Location: Sonora Contract Commissioner: CFE (Govt) Type: Lump sum Term: 943 days Financing: 100% by contractor Selection basis: Best qualified amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $885m+ (1115m+ local currency) Local content: 10% Subcontracts allowed: Bid follow-up Ref: 18164093-022-09 Release: 11.Jun.09 Site visit: 25.Jun.09 1st clarification meeting: 29.Jul.09 2nd clarification meeting: 04.Sep.09 3rd clarification meeting: 12.Nov.09 4th clarification meeting: 16.Dec.09 5th clarification meeting: 02.Feb.10 6th clarification meeting: 25.Feb.10 7th clarification meeting: 25.Mar.10 (next) Closing: 25.May.10 Submission & opening: 31.May.10 Registered bidders 1.Isolux 2.OHL 3.Sener 4.Iberdrola 5.Cobra 6.Abener 7.Prolec GE 8.Inelectra 9.Techint 10.Siemens 11.Acciona Potential bidders Itochu, ICA Fluor Daniel, El Paso, Dragados, Mitsubushi, Man Ferrostaal, Socoin, GE, IEE Status BIDDING Updated 26.Feb.10 Previous tender ref: CC-SOLAR POWER PLANT AGUA PRIETA II [VOID] Project Description: Combined cycle plant formed by 2/3 gas turbogenerators with steam generators and auxiliary systems, one steam turbogenerator with auxiliary systems, one air condensator and complementary equipment. Also a solar camp to generate steam for the combined cycle. And the interconnection with a 230 kV substation. Gas capacity: 535.64 MW +/- 15% (summer conditions) Solar capacity: 24 MW Scope: Design/ engineering/ procurement/ construction/ installation/ tests/ training/ commissioning Location: Sonora Contract Commissioner: CFE (Govt) Type: Lump sum Term: 859 days starting 26.Sep.07 Financing: 100% gas capacity by contractor Donation: $49.35million for 100% solar capacity by GEF-World Bank Payment/milestone: Bid offer/ Provisional acceptance by CFE: 01.Feb.10 Selection basis: Best qualified amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $100m+ Local content: 16% Subcontracts allowed: Design/ engineering/ construction/ commissioning Bid follow-up Ref: 18164093-022-06 Release: 29.Aug.06 Site visit: 06.Sep.06 1st clarification meeting: 04.Oct.06 12th clarification meeting: 05.Jul.07 13th clarification meeting: 19.Jul.07 14th clarification meeting: 31.Jul.07 (last) Closing: 02.Aug.07 Submission & opening: 08.Aug.07 Registered bidders 1.Iberdrola 2.Abener 3.Isolux 4.Dragados 5.Mitsubushi 6.Sener 7.Man Ferrostaal 8.Siemens 9.Socoin 10.Cobra 11.GE 12.El Paso 13.Techint 14.Itochu 15.ICA Fluor Daniel Status Tender declared VOID on 08.Aug.06 A new RFPs to be announced shortly Updated 10.Aug.07 CT-TG Baja California II phase 1 [SUBMITTED] Project Commissioner: CFE (Govt) Location: Rosarito, Baja California Capacity: Summer 76-103 Mw / Average 105.4-142.6 Mw Scope: EPC Construction program: 547 days starting 05.Mar.10 Provisional acceptance: 30.Jun.11 Contract: Lump sum & financing Local content: Selection basis Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $28m+ (local currency 359million+) Bid follow-up Ref: 18164093-019-09 Release: 02.Jun.09 Site visit: 11.Jun.09 1st clarification meeting: 21.Jul.09 2nd clarification meeting: 31.Jul.09 3rd clarification meeting: 01.Sep.09 4th clarification meeting: 29.Sep.09 5th clarification meeting: 23.Oct.09 6th clarification meeting: 10.Nov.09 7th clarification meeting: 21.Dec.09 8th clarification meeting: 20.Jan.10 9th clarification meeting: 26.Feb.10 (last) Closing: 27.Feb.10 Proposal submission & opening: 05.Mar.10 Registered bidders 1.Isolux 2.Pratt & Whitney-Dinamo 3.OHL 4.GE 5.ICA Fluor Daniel 6.Abener 7.Cobra 8.Prolec GE 9.Rolls-Royce 10.Elecnor 11.Techint 12.Siemens 13.Lipsa 14.Sener 15.SNC Lavalin Constructors 16.Iberdrola Potential bidders ABB, Emerson, Sentry, HPI-Servicontrol Mty Status SUBMITTED Updated 05.Mar.10 CC Poza Rica [SUBMITTED] Project Commissioner: CFE (Govt) Location: Poza Rica, Veracruz Capacity: 160 Mw Scope: EPC Construction program: 732 days starting 18.Dec.09 Contract: Lump sum & financing Local content: Selection basis Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $26m+ (local currency 339million+) Bid follow-up Ref: 18164093-016-09 Release: 28.May.09 Site visit: 09.Jun.09 1st Clarification meeting: 16.Jul.09 2nd Clarification meeting: 25.Aug.09 3rd Clarification meeting: 01.Oct.09 4th Clarification meeting: 11.Dec.09 5th Clarification meeting: 19.Jan.10 (last) Closing: 11.Feb.10 Proposal submission & opening: 17.Feb.10 Registered bidders 1.OHL 2.HPI 3.Inelectra 4.Techint 5.Isolux 6.Siemens 7.Acciona Potential bidders Emerson Status SUBMITTED Updated 19.Feb.10/rev 05.Mar.10 CC POWER PLANT NORTE II [4th DELAY] Project Commissioner: CFE (Govt) Location: Chihuahua Capacity: 376+15% Mw (summer condition design) Scope: Engineering Construction Operation Financing & Owning Construction program: 932 days starting 12.Sep.10 Contract: External Power Producer (IPP) Term: 25 years Local content: 25% Min Selection basis Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $78m+ (local currency 1billion+) Bid follow-up Ref: 18164093-047-08 Release: 23.Dec.08 Site visit: 13.Jan.09 1st Clarification meeting: 03.Mar.09 2nd Clarification meeting: 28.Apr.09 3rd Clarification meeting: 18.Aug.09 4th Clarification meeting: 29.Sep.09 5th Clarification meeting: 20.Oct.09 6th Clarification meeting: 30.Nov.09 7th Clarification meeting: 26.Jan.10 8th Clarification meeting: 15.Feb.10 9th Clarification meeting: 29.Mar.10 (next) Closing: 12.Jun.10 Submission & technical proposal opening: 18.Jun.10 Registered bidders 1.Senermex 2.Iberdrola 3.Mitsubishi 4.Alstom 5.ICA Fluor Daniel 6.Union Fenosa 7.Abener 8.Dragados-Cobra 9.Suez 10.GE 11.Prolec 12.Endesa 13.Siemens 14.Samsung 15.Mitsui, Potential bidders Techint, Duro Felguera, Itochu, Gas de France, Electricidad Sol de Tuxpan, Brycsa, Emerson, Tribasa, Sadeven, Isolux Status BIDDING Updated 19.Feb.10 Previous tender ref: CC POWER PLANT NORTE [AWARDED] Project Commissioner: CFE (Govt) Location: Durango Capacity: 333-450 Mw Scope: Engineering Construction Operation Financing & Owning Construction program: 739 days starting 24.May.07 Contract: External Power Producer Term: 25 years Local content: 25% Min Selection basis Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: US$92m+ (local currency 1b+) Bid follow-up Ref: 18164093-015-05 Release: 15.Nov.05 Register deadline: 17.Oct.06 Submission: 23.Oct.06 Offers opening: 19.Jan.07 Decision: 05.Mar.07 Registered bidders 1.Hitachi 2.GE 3.Techint 4.Chubu 5.Siemens 6.Transalta 7.Electricite de France 8.Constructora Andrade Gutierrez 9.Itochu 10.Petrobras 11.Mitsubishi 12.Fenosa 13.Valladolid International Investments 14.Energia Azteca (Intergen) 15.Iberdrola 16.Mitsui 17.Prolec GE 18.ICA Fluor Daniel 19.Energia Termodurango 20.ABB Status AWARDED Union Fenosa Internacional: 0.6294 Pesos/kWh (DOF 15.May.07) (Updated 09.Mar.07) POWER PLANT HISTORY
Geothermo Los Humeros II phase B 18164093-031-09/ 04.Dec.09/ Alstom Mexicana/ $3.7million Geothermo Cerro Prieto V 18164093-009-09/ 19.Jan.10/ VOID a new RFPs to be announced shortly WIND Oaxaca I 18164093-031-08/ 11.May.09/ Energia y Recursos Ambientales (EYRA)- Energias Ambientales de Guadalajara/ $0.0660 USD/kWh WIND La Venta III 18164093-002-07/ Tender declared VOID on 24.Oct.07 Wind La Venta II/ 83.3 Mw (98 units)/ 31.Aug.05/ Iberdrola - Gamesa Eolica/ $111.4million HYDROELECTRIC LA YESCA 18164093-001-07/ 06.Sep.07/ ICA-Adisa-La Peninsular/ $768million CC-SOLAR POWER PLANT AGUA PRIETA II 18164093-022-06/Tender declared VOID on 08.Aug.06/ A new RFPs to be announced shortly NUCLEAR POWER PLANT LAGUNA VERDE (1st Fase) 18164093-013-06/ 12.Feb.07/ Iberdrola Ingenieria y Consultoria Mexico - Iberdrola Ingenieria y Construccion - Alstom Mexicana/ $605million CC POWER PLANT NORTE 18164093-015-05/ 05.Mar.07/ Union Fenosa Internacional/ 0.6294 Pesos/kWh CC POWER PLANT BAJA CALIFORNIA 18164093-017-06/ 27.Sep.06/ Isolux-Techint/ $174million COAL POWER PLANT PACIFICO 18164093-003-03/ 06.Dec.05/ Mitsubishi Corporation-Carboelectrica Diamante/ $611million 2. CC Power plant Mexicali II Ref: 18164093-002-02/ Canceled 3. CC Power plant Tamazunchale 18164093-001-03/ 30.Jun.04/ Iberdrola Mexico/ IPP/ 25yrs/ 839-1135 MW 5. CC Power plant Tuxpan V 18164093-013-02/ 17.Dec.03/ Mitsubishi Corporation-Kyushu Electric Power Co/ IPP/ 25yrs/ 431-527 MW 7. CC Power plant Valladolid III 18164093-032-02/ 14.Oct.03/ Mitsui & Co Ltd/ IPP/ 25yrs/ 430-525 MW 8. CC Power plant Altamira V 18164093-001-02/ 22.Oct.03/ Iberdrola Mexico/ IPP/ 25yrs/ 975 MW 9. Hydroelectric El Cajon 18164093-011-02/ 14.Mar.03/ Constructora Internacional de Infraestructura: ICA-Promotora e Inversora Adisa-La Peninsular Compania Constructora-EnergomachExport Power Machine/ $749.5million/ $0.0685/Kw-h/ 2x375 MW FOR REFERENCE DETAILED INFO ON THESE TENDERS IS POSTED IN THE NEXT PAGE FEDERAL COMMISSION OF ELECTRICITY (CFE)
LNG PROJECTS No major tenders currently Coming shortly: 400 mcfd / 230 km / $600m+ San Luis Potosi / Guanajuato / Queretaro FOR REFERENCE DETAILED INFO ON PREVIOUS TENDERS IS POSTED IN THE NEXT PAGE __________________________________________________________________ ARAMONI Expert Services
1. REPORTING Up-to-date tender information • AramoniReport on line: www.aramoni.com • Customized reporting based on clients’ information needs 2. OPPORTUNITY ALERT SUBSCRIPTION We timely identify project opportunities for our clients • Customized service based on client’s requirements • Market leads • RFP (timely) • Basic project information • Tender documents (in Spanish) 3. TENDER INTRODUCTION We position our clients to apply for bid project opportunities • Tender register procedure • Collection & sending of bid documents • Guide & support to complete the company's administrative, financial & legal bidding packages (optional) 4. TENDER COMPLIANCE We secure our clients' bid proposals • Tender documents review • Bid proposal complete evaluation • Omissions report, modifications statement & improvements advice • Final review and revision 5. BID ASSISTANCE Expert service to produce competitive compliant proposals • Tender documentation review • Administrative, financial & legal compliance • Commissioner contract understanding • Project insight • Competitors assessment • Strategy issues • Technical/economic proposals • Price bid offer 6. BUSINESS DEVELOPMENT Consulting & assistance to accomplish corporate goals • Market advice & research • Opportunitie search & pursuit • Networking • Functional local support • Representative services Contact: info@aramoni.com __________________________________________________________________