AramoniReport   
MEXICO ENERGY TENDERS
(Updated January 26, 2015)
_______________________________

TO ENERGY-ORIENTED INVESTORS AND FUNDS
Aramoni in association with prime French firm EOSYS
provides independent GEOLOGICAL ASSESSMENT
for Round-1 opportunities in Mexico
Inquiries: info@aramoni.com
_______________________________

ROUND-1 CONTRACTS (shared-production)
Block 1: light oil, 194 km2, shallow waters off South Veracruz
Block 2: light oil, 195 km2, shallow waters off South Veracruz
Block 3: light oil, 233 km2, shallow waters off South Veracruz
Block 4: light oil, 233 km2, shallow waters off South Veracruz
Block 5: light oil, 466 km2, shallow waters off West Tabasco
Block 6: light oil, 466 km2, shallow waters off West Tabasco
Block 7: light oil, 465 km2, shallow waters off center of Tabasco
Block 8: extra-heavy oil, 116 km2, shallow waters off center of Tabasco
Block 9: extra-heavy oil, 116 km2, shallow waters off center of Tabasco
Block 10: light oil, 232 km2, shallow waters off center of Tabasco
Block 11: extra-heavy oil, 309 km2, shallow waters off East Tabasco
Block 12: heavy oil, 387 km2, shallow waters off East Tabasco
Block 13: heavy oil, 501 km2, shallow waters off East Tabasco
Block 14: wet gas, 310 km2, shallow waters off West Campeche
Further detail: info@aramoni.com
_______________________________

ROUND-1 SCHEDULE
Public notice: 11-Dec-2014
Interested pre-register: 11-Dec-2014 to 16-Mar-2015
Access to data room: 15-Jan to 14-Jul-2015
Clarifications on data room: 11-Dec-2014 to 25-Feb-2015
Prequal window: 11-Dec-2014 to 27-Apr-2015
Clarifications on prequal requirements: 11-Dec-2014 to 11-Mar-2015
Prequal ruling: 27-Apr-2015
Clarifications on tender process and contact: 28-Apr to 15-Jun-2015
Offers submission (on a block basis): 15-Jul-2015
Rulings (on a block basis): 17-Jul-2015
Termination (on a block basis): 21-Aug-2015
Further detail: info@aramoni.com
_______________________________

COMING PEMEX FARM-OUTS
1. Production for shallow-water mature fields (3): Bolontiku, Sinan, Ek
2. Production for shallow-water extra-heavy oil fields (3): Ayatsil, Tekel, Utsil
3. Production for Chicontepec and non-conventional fields:
4. Production for land mature fields (3): Rodador, Ogarrio, Cardenas-Mora
5. Field development of giant deep-water gas fields (2): Kunah-Piklis
6. Field development of Perdido area (2): Trion, Exploratus

Further: info@aramoni.com
_______________________________


CURRENT KEY PROJECTS

AYATSIL-TEKEL
A Pemex RFPs just came out for
a 4.4-yr contract of well integrated services:
drilling termination and reparation
over these extra-heavy oil fields
Prequal applications:
1.Dowell Schlumberger-OFS Servicios-MI drilling fluids
2.Halliburton
3.Baker Hughes
4.Weatherford-Global Driling Fluids-PD Oil field- OilPatch-WFO-WPA-Perforadora Mexico
GSM n/a
Perforadora Central n/a
Next: Prequal ruling 27-Jan-2015

CFE NORTE III CC 906-MW POWER PLANT awarded to ABENGOA

CFE CHICOASEN 240-MW POWER HYDRO DAM awarded to OMEGA-SINOHIYDRO- DCU- CAABSA

LAKACH - ONE SUBSEA
Pemex awarded to Schlumberger-Cameron
a $270m contract to supply, install and
commission a 7-well production
system for the Lakash deepwater
giant gas field

LAKACH - SAIPEM
An EPCI contract for gas field development
at 850 to 1200-meter water depth
was awarded by Pemex to Saipem
Scope includes:
Two 73-km long 18-in diameter flowlines
Main umbilical 50-km long
SURF works

_______________________________


SPECIALIZED REPORTS

1. OFFSHORE FIXED PLATAFORMS: No Current Tenders

2. PEMEX MARINE PIPELINES

ZAAP-E to KU-A1, KMZ field, 24in x 2.8km + KU-M to ZAAP-E, KMZ field, 12in x 3.2km,
Proposal submission: 9-Feb-2015
Ruling: 26-Feb-2015
Bidders: Micoperi, Swiber, Permaducto (Protexa), Subsea7, HOC (CalDive), Dragados, Arendal, Global (Techint), Emas-AMC, Grup Servicii Petroliere, TL Offshore

KAMBESAH to IXTOC-TA, 12in x 6.5km + IXTOC-TA to IXTOC-A, 12in x 5.2km,
Proposal submission: 9-Feb-2015
Ruling: 26-Feb-2015
Bidders: Micoperi, Swiber, Permaducto (Protexa), Subsea7, HOC (CalDive), Dragados, Arendal, Global (Techint), Emas-AMC, Grup Servicii Petroliere, TL Offshore


3. LAND FLOWLINES

CFE Major Tenders

San Isidro-Samalayuca
Proposal submission 25-Mar-2015
Technical ruling 9-Apr-2015
Economical ruling 16-Apr-2015

Villa de Reyes (branch), NG 276 MMCFPD
Los Ramones Line to Villa de Reyes Power Plant
Bidders: Atco, Igasamex, Transportadora Zacatecas, Cava Energy, Fermaca
Next meeting 26-Jan-2015

Waha-San Elizario TX (Norte III): Gas 42in x 360km
Proposal submission 13-Jan-2015
Bid proposals: Sempra, TC Continental, Kinder Morgan Texas, Energy Transfer Partners - Mastec - Carso Energy, Operadora Mexicana de Gasoductos
Ruling 28-Jan-2015

Waha-Presidio TX (Ojinaga), NG 2831 MMCFPD, 42in x 230km
Proposal submission 9-Dec-2014
Ruling 8-Jan-2015
Winner: Energy Transfer Partners - Mastec - Carso Energy

El Encino-La Laguna, NG 1500 MMCFPD, 42in x 400km
Bid proposals (investment/ tariff / PV-1 / PV-2):
Fermaca: $630.1m / $0.1222 per Gj / $602.2m / $530.1m
Enagas-Elecnor: $997.3m / $0.1610 per Gj / $756.5m / $665.9m
Transcanada: $899.6m / $0.1546 per Gj / $781.2m / $687.7m
Carso: $914.3m / $0.2073 per Gj / $965.0 / $849.5m
Sempra-IENova: $883.3m / $0.1951 per Gj / $1003.6m / $883.5m
Abengoa-China Petroleum Pipeline Berau (disqualified at technical stage)
Ruling 16-Dec-2014
Winner: Fermaca Pipeline el Encino

Ojinaga-El Encino, NG 1356 MMCFPD, 42in x 250km:
Bid proposals (investment / tariff / PV-1 / PV-2):
1. Gasoducto de Aguaprieta (Sempra-IENova): $298.9m / $0.0560 per Gj / $192.2m / $242.3m
2. Transportadora de Gas Natural del Noroeste (Transcanada): $344.6m / $0.0657 per Gj / $221.8m / $279.4m
3. Carso Energy: $323.4m / $0.0721 per Gj / $239.1m / $301.2m
4. Enagas-Elecnor: $419.8m / $0.0725 per Gj / $248.4m / $313.0m
5. Fermaca: $311.9m / $0.0749 per Gj / $250.5m / 315.6m
Omega (disqualified at technical stage)
Ruling 24-Nov-2014
Winner: Gasoducto de Aguaprieta (Sempra-IENova)

Tula (branch), NG 485 MMCFPD, 30in
Proposal submission 17-Sep-2014
Bid proposals Arendal $59.5m, ATCO $48.8m
Ruling 9-Oct-2014: ATCO

Further: info@aramoni.com
_______________________________

Next