MEXICO ENERGY - MAJOR PROJECTS
27.Aug.10
_______________________________

BUSINESS OPPORTUNITIES
_______________________________

Aramoni Consulting features
Pemex RFQs for a major
JACKUP LEASE TENDER:

• Scope
• Lease terms
• Unit characteristics
• Personnel required
• Tender follow-up
• Milestones
• Register & prequal requirements
• Bid docs
Please go to the Jackup section below
Further assistance: info@aramoni.com

_______________________________

OFFSHORE DRILLING PLATFORMS
Pemex released today
RFPs for three IPC contracts:
• Tsimin-A
• Bolontiku-C
• Tsimin-B
Summary & Follow-up below
_______________________________

DRILLING RIGS (3)
Pemex just released a RFQs
to purchase three onshore units
Detailed info by request:
info@aramoni.com

_______________________________

TANKERS
Pemex Refination released a RFQs
for up to five (2007 and newer)
40000mt tankers either for purchase
or lease with purchase option
Detailed info by request:
info@aramoni.com

_______________________________

STEEL DISTRIBUTORS
Current tender for Pemex drilling platform
PP-MALOOB-D indicates volumes as follows:
• Steel Plate API-2H-50: +3000 mt
FYI, we have got the experience
to put your company in a position
to submit quotes to contractor
contact us: info@aramoni.com

_______________________________

ARAMONI EXPANDS OPERATIONS
TO VILLAHERMOSA AND CARMEN

We just achieved putting together
a set of local essential resources
for foreign companies to rapidly
gain competitive advantages in
upstream Pemex tenders:

LOCAL SUPPORT
• Project staffing outsourcing
• Strategic facilities (offices, stores, yards)
• Industry relations

MARKET CONSULTING
• Pemex inside understanding
• Project intellingence
• Opportunity search and pursue
• Bid proposal assurance

On a specialty basis
We will consider to provide
these benefits
to international oil companies
pursuing work in Mexico

Get further: info@aramoni.com
_______________________________

TULUM NEW AIRPORT CONCESSION
Tender for a 50yr contract just released
Public notice: info@aramoni.com
_______________________________

Follow aramoni on Twitter
and get timely announcements
on Pemex's tenders as well as
decisive news on the industry

_______________________________


AramoniReport
CONTENT: Project & Status of posted tenders

PEMEX EXPLORATION & PRODUCTION (PEP)
MARINE EXPLORATION & PRODUCTION
Complete follow-up for 2010 UPMP tenders:

JACKUPS
2010 lease contracts 10
Assignments 5
Current tenders 1

DRILLING PACKAGES
2010 lease contracts 19
No current tenders

ONSHORE EXPLORATION & PRODUCTION
DRILLING RIGS
Lease contracts 12
Purchases 10
Current purchase tenders 3

MEASUREMENTS
MWD LWD and Production Flow contract opportunities
(budget: $275million) complete info by request

OFFSHORE PLATFORMS
• PP- Maloob-D Drilling Platform [AWARDED: Construcciones Mecanicas Monclova (COMMSA-GIMSA) $30million]
• Kuil-A: Tetrapod (reinforced) [AWARDED: Ray McDermott $21.5million]

LIVING QUARTER HA-LT-01
• Project managment support for HA-LT-01 [AWARDED: DIRAC $1.3million]
Project Tender History
Platform History

MULTIPLE SERVICE CONTRACTS
MSC History

PEMEX REFINING (PR)

INTEGRAL PROJECT FOR CLEAN FUELS
• Sulphur recovery plant SRU-2 Minatitlan [SUBMITTED]
• Expert engineering services (Diesel Phase) [AWARDED: Inelectra North America $25million]
• Salina Cruz & Minatitlan [AWARDED: ICA Fluor Daniel $624million/ contact info by request]
• Cadereyta & Madero [AWARDED: ICA Fluor Daniel $638million/ contact info by request]
• Tula & Salamanca [VOID: A new RFPs to be announced shortly]

FEDERAL COMMISSION OF ELECTRICITY (CFE)

POWER PLANTS
• Cogeneration Salamanca-1 [BIDDING]
• CC-El Sauz-1 [BIDDING]
• Wind Oaxaca II, III, IV [AWARDED: Acciona Energia Mexico II: $0.0658 USD/Kwh, III: $0.0678 USD/Kwh, IV: $0.0637 USD/Kwh]
• CC-Manzanillo [AWARDED: Cobra - ACS - Inelectra (General Electric) $0.07925 USD/Kwh ($981million)]
• CC-Solar Agua Prieta II (2nd-round) [AWARDED]
• CT-TG Baja California II phase 1 [VOID]
• CC Poza Rica [AWARDED: IGSA $11million]
• CC NORTE II [AWARDED: Korea Electric Power Corp - Samsung C&T Corp - Techint 1.1214 Pesos/kWh ($418million)]
Power Plant History

LNG PROJECTS
No major tenders currently
Coming shortly: 400 mcfd / 230 km / $600m+
San Luis Potosi / Guanajuato / Queretaro

_________________________________________________________________

AramoniReport
MAJOR INTERNATIONAL TENDERS: Summary and Follow-up

PEMEX EXPLORATION & PRODUCTION (PEP)
MARINE EXPLORATION & PRODUCTION

JACKUP Current tender

FEATURE OPPORTUNITY

Jackup RFQ [NEW]
Commissioner: Pemex Marine Division
Contract: Lease with no purchase option
Term: 486d (07.Jan.11-06.May.12)
Location: Campeche basin GOM (A/E H)
Well: (TET-Akal-TTJ) Sihil-23
Scope: Lease and integral maintenance

Unit:
Jackup for well drilling/ termination/ reparation
Year delivered: 2000 and newer
Characteristics: Independed-leg/ cantilever drilling (+70ft)/ cranes (2x35mt)/ diesel electrical/ heliport
Water depth: +350ft
Airgap: 92ft
Drilling depth: +25000ft
Drawworks: 3000HP
Beds: 45 for Pemex + Contractor´s needs

Contractor's personnel:
Representative
Maintenance chief
Mechanical supervisor
Electrical supervisor
Crane operators (2) and assistants (2)
Welder specialist
Motor operator
Ship protecction official (ISPS) (Mexican)
Safety & health supervisor
Environmental supervisor
Jackup and equipment operatition staff (4+) (ATP)
Drilling inspectors (tool pusher) (2)
Drilling operators (2), seconds (2) and assistants (2)
Rotary dirilling operators (6)
Drilling general assistants (8)
Contract administrator (based in Ciudad del Carmen)

Bid follow-up:
Ref: 18575088-502-10
Release: 17.Aug.10
Register period: from release until prequalification deadline
1st clarification meeting: 02.Sep.10 (next)
Prequalification deadline to be set in 1st meeting above
Proposal submission & technical opening: 26.Oct.10
Technical ruling & offer opening: 09.Nov.10
Ruling: 19.Nov.10
Finalizing: by 06.Dec.10
Status [PREQUALIFICATION]
Updated 17.Aug.10

Registration:
Expression of Interest (format by request)

Prequalification:
Pemex would prequalify 1)legal capacity and 2)technical experience
1) For legal the following documents have to be presented:
Company incorporation doc validated (appostille or Mexican consulate or Mexican notary public)
Power of attorney for the legal representative validated by a Mexican notary public
Official ID (passport)
For consortia a formal agreement is to be signed by parties (model by request)
2) As to technical experience potential bidder has to prove at least two years operating similar jackup units (format by request)

Tender docs: e-mailed by request

Further assistance: info@aramoni.com


JACKUP Tender History 2010

North Division [AWARDED]
Contract: Lease with no purchase option
Term: 1039d (29.Jun.10-02.May.13)
Location: GOM
Well: Bagre 130 C
Unit: Independed-leg/ cantilever drilling/ diesel electrical
Water depth: +300ft
Airgap: 92ft
Drilling depth: +25 000ft
Drawworks: 3000HP
Bid follow-up
Ref: 18575088-004-10
Release: 12.Mar.10 (Compranet)
1st Clarification meeting: 25.Mar.10
2nd Clarification meeting: 06.Apr.10
3rd Clarification meeting: 14.Apr.10
4th Clarification meeting: 19.Apr.10
5th Clarification meeting: 19.Apr.10
6th Clarification meeting: 22.Apr.10
7th Clarification meeting: 23.Apr.10
Proposal submission & opening: 30.Apr.10
Ruling: 20.May.10
Registered bidders
1.Blake Platform Rigs 2.Perforadora Central 3.Pride Foramer 4.KCA Deutag Offshore As 5.Goimar 6.Mexdrill Offshore 7.Noble Contracting 8.COSL 9.TODCO 10.Ensco Drilling 11.Perforadora Mexico 12.Nabors 13.Iner Servicios 14.Saipem 15.ISOMEX-Fristdrill Ltd 16.Rowandrill 17.Globalsantafe Operations 18.Geomarex 19.Logistica de Perforacion
Submitted proposals
1.ISOMEX-Fristdrill Ltd: Deep Driller 6 $124.12million ($119 460 per day)
2.Geomarex: Naga 2 $126.41million ($121 660 per day)
3.Perforadora Central-Central Panuco: Tuxpan $131.42million ($126 490 per day)
4.COSL-Goimar: Hai Yang Shi You 937 $144.02million ($138 610 per day)
Status [AWARDED]
ISOMEX-Fristdrill Ltd: Deep Driller 6 $124.12million ($119 460 per day)
Updated 20.May.10

Marine Division [AWARDED]
Scope
4 Lease contracts with no purchase option
Contract 1
Term: 465d (10.Jun.10-17.Sep.11)
Location: Campeche basin
Well: TET-Akal-TMA (Cantarell-3039H)
Unit: Independed-leg/ cantilever drilling/ diesel electrical
Water depth: 49 meters
Airgap: 92ft
Drilling depth: +25 000ft
Drawworks: 3000HP
Contract 2
Term: 256d (13.Jun.10-23.Feb.11)
Location: Campeche basin
Well: Bolontiku-501
Unit: Independed-leg/ cantilever drilling/ diesel electrical
Water depth: 30 meters
Airgap: 92ft
Drilling depth: +25 000ft
Drawworks: 3000HP
Contract 3
Term: 254d (28.Jul.10-07.Apr.11)
Location: Campeche basin
Well: Tsimin-1-DL
Unit: Independed-leg/ cantilever drilling/ diesel electrical
Water depth: 30 meters
Airgap: 92ft
Drilling depth: +20 500ft
Drawworks: 2000HP
Contract 4
Term: 292d (29.Sep.10-17.Jul.11)
Location: Campeche basin
Well: TET-Akal-TE (Sihil-12)
Unit: Independed-leg/ cantilever drilling/ diesel electrical
Water depth: 46 meters
Airgap: 92ft
Drilling depth: +25 000ft
Drawworks: 3000HP
Bid follow-up
Ref: 18575088-003-10
Release: 09.Mar.10 (Compranet)
Site visit: n/a
1st Clarification meeting: 25.Mar.10
2nd Clarification meeting: 05.Apr.10
3rd Clarification meeting: 07.Apr.10
4th Clarification meeting: 12.Apr.10
5th Clarification meeting: 16.Apr.10
6th Clarification meeting: 20.Apr.10
7th Clarification meeting: 26.Apr.10
Proposal submission & opening: 26.May.10
Ruling: 05.Jul.10
Registered bidders
1.KCA Deutag Offshore As 2.Noble Contracting 3.COSL 4.Pride Foramer SAS 5.Servicios Integrales GSM (Carso) 6.TODCO 7.Saipem 8.Nabors 9.Mexdrill 10.Perforadora Central 11.Goimar 12.Ensco Drilling 13.Perforadora Mexico 14.ISOMEX 15.Iner Servicios 16.Globalsantafe Operations 17.CICSA (Carso) 18.Rowandrill Inc 19.Logistica de Perforacion 20.Geomarex 21.Seahawk Drilling
Potential participants
Corpores, Scorpion Offshore
Proposals submitted
Contract 1
Perforadora Central: Tuxpan $44.16m ($94 975 per day )
Geomarex-Atlantic Marine Services: Ks Endeavor $51.61m ($110 990 per day)
ISOMEX-Fristdrill Ltd: Deep Driller 8 $56.00m ($120 450 per day)
Contract 2
Perforadora Central: Panuco $28.54m ($111 470 per day)
ISOMEX-Fristdrill Ltd: Deep Driller 8 $33.00m ($128 985 per day)
Geomarex-Atlantic Marine Services: Naga 2 $36.17m ($141 295 per day)
Contract 3
Noble Contracting: Noble Roy Butler $18.63m ($73 350 per day)
Perforadora Mexico: $21.94m ($86 375 per day)
ISOMEX-Fristdrill Ltd: Aban VII $24.88m ($97 970 per day)
Contract 4
Perforadora Central: Tonala $32.35m ($110 795 per day)
ISOMEX-Fristdrill Ltd: Deep Driller 8 $36.98m ($126 645 per day)
Geomarex-Atlantic Marine Services: Naga 2 $40.20m ($137 685 per day)
Status [AWARDED]
Contract 1
Perforadora Central: Tuxpan $44.16m ($94 975 per day )
Contract 2
Perforadora Central: Panuco $28.54m ($111 470 per day)
Contract 3
Noble Contracting: Noble Roy Butler $18.63m ($73 350 per day)
Contract 4
Perforadora Central: Tonala $32.35m ($110 795 per day)
Updated 09.Jul.10


DRILLING PACKAGE Tender History 2010

Marine Division [CANCELED]
Scope
2 Lease contracts with no purchase option
Contract 1
Term: 752d (07.Dec.10-27.Dec.12)
Location: Campeche basin
Platform: 8-legged Yaxche-A
Well: Yaxche-25
Unit: Diesel electrical
Drilling depth: +25000ft
Drawworks: 3000HP
Beds: 90
Contract 2
Term: 273d (24.Sep.10-23.Jun.11)
Location: Campeche basin
Platform: 8-legged Akal-TJ
Well: Sihil-19
Unit: Diesel electrical
Drilling depth: +20000ft
Drawworks: 2000HP
Beds: 90
Bid follow-up
Ref: 18575088-005-10
Release: 06.Jul.10
Registered bidders
Status: CANCELED
A new RFPs to be released shortly
Updated 15.Jul.10

North Division [AWARDED]
Contract: Lease with no purchase option
Term: 1039d (20.Jul.10-23.May.13)
Location: GOM
Platform: Arenque B, C
Well: Arenque 16
Unit: Diesel electrical
Drilling depth: +17 500ft
Drawworks: 1000HP
Bid follow-up
Ref: 18575088-004-10
Release: 12.Mar.10 (Compranet)
Site visit: 22.Mar.10
1st Clarification meeting: 25.Mar.10
2nd Clarification meeting: 06.Apr.10
3rd Clarification meeting: 14.Apr.10
4th Clarification meeting: 19.Apr.10
5th Clarification meeting: 19.Apr.10
6th Clarification meeting: 22.Apr.10
7th Clarification meeting: 23.Apr.10
Proposal submission & opening: 30.Apr.10
Ruling: 20.May.10
Registered bidders
1.Blake Platform Rigs 2.Perforadora Central 3.Pride Foramer 4.KCA Deutag Offshore As 5.Goimar 6.Mexdrill Offshore 7.Noble Contracting 8.COSL 9.TODCO 10.Ensco Drilling 11.Perforadora Mexico 12.Nabors 13.Iner Servicios 14.Saipem 15.ISOMEX-Firstdrill Ltd 16.Rowandrill 17.Globalsantafe Operations 18.Geomarex 19.Logistica de Perforacion
Submitted proposals
1.Nabors: Supersundowner XX $34.65million ($33 350 per day)
2.Blake: Blake 1006E $39.15million ($37 680 per day)
Status [AWARDED]
Nabors: Supersundowner XX $34.65million ($33 350 per day)
Updated 20.May.10

Marine Division [AWARDED]
Scope
3 Lease contracts with no purchase option
Contract 1
Term: 397d (30.Jun.10-31.Jul.11)
Location: Campeche basin
Platform: 8-legged OCT-Akal-S
Well: Cantarell-2297
Unit: Diesel electrical
Drilling depth: +20 000ft
Drawworks: 2000HP
Quarters for 92 personnel
Contract 2
Term: 409d (15.Jul.10-27.Aug.11)
Location: Campeche basin
Platform: 8-legged OCT-Akal-R
Well: Cantarell-2078A
Unit: Diesel electrical
Drilling depth: +20 000ft
Drawworks: 2000HP
Quarters for 92 personnel
Contract 3
Term: 846d (08.Sep.10-31.Dec.12)
Location: Campeche basin
Platform: 8-legged OCT-Sihil-A
Well: Sihil-2
Unit: Diesel electrical
Drilling depth: +20 000ft
Drawworks: 2000HP
Quarters for 92 personnel
Bid follow-up
Ref: 18575088-002-10
Release: 09.Mar.10 (Compranet)
Site visit: 19.Mar.10
1st Clarification meeting: 24.Mar.10
2nd Clarification meeting: 31.Mar.10
3rd Clarification meeting: 08.Apr.10
Proposal submission & opening: 21.Apr.10
Ruling: 11.May.10
Registered bidders
1.Nabors 2.COSL 3.Blake Platform Rigs 4.Perforadora Central 5.Parker Drilling 6.TODCO 7.GOIMAR 8.ISOMEX
Status [AWARDED]
1.Nabors: $24.5million ($61 600 per day)
2.Nabors: $26.0million ($63 550 per day)
3.COSL $40.5million ($48 200 per day)
Updated 20.May.10

6. Marine Division [VOID]
Contract: Lease with no purchase option
Term: 231d (15.May.10-31.Dec.10)
Location: Campeche basin
Platform: 8-L Manik-A
Well: Manik-12
Unit: Diesel electrical
Drilling depth: +20 000ft
Drawworks: 2000HP
Bid follow-up
Ref: 18575088-001-10
Release: 19.Feb.10 (Compranet)
Site visit: 26.Feb.10
1st Clarification meeting: 01.Mar.10
2nd Clarification meeting: 04.Mar.10
3rd Clarification meeting: 05.Mar.10
Closing: 10.Mar.10
Proposal submission & opening: 16.Mar.10
Registered bidders
1.Todco 2.Nabors 3.COSL 4.Perforadora Central 5.Geofisica Marina de Exploracion 6.Blake Platform Rigs 7.GOIMAR
Potential participants
Status [VOID]
Tender declared nul on 26.Mar.10
A new RFP should be released shortly
Updated 29.Mar.10

_______________________________

Follow aramoni on Twitter
and get timely announcements
on Pemex's tenders as well as
decisive news on the industry

_______________________________


PEMEX EXPLORATION & PRODUCTION (PEP)

OFFSHORE PLATFORMS

PP-Tsimin-A [NEW]
Project
Offshore drilling platform (8-legged)
Scope: Engineering/ procurement/ construction/ loading/ fixing
Location: Tsimin field Campeche basin GOM
Term: 390 days
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $10+million
Contract
Type: Unit prices
Down payment: n/a
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-502-10
Release: 26.Aug.10
Site visit: n/a
1st clarification meeting: 01.Sep.10 (next)
Submission & opening: 21.Sep.10
Ruling: 01.Oct.10
Finalizing: 18.Oct.10
Registered bidders
Potential participants
1.Ray McDermott 2.Industria del Hierro (ICA Fluor Daniel) 3.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 4.CICSA (Carso) 5.Dragados 6.Construcciones y Equipos Latinoamericanos (Protexa) 7.Bosnor 8.Ingenieria Industrial y Maritima 9.Tradeco 10.Evya
Saipem America, Heerema, Eaton Technologies, Hydrotesting Service
Status BIDDING
Updated 26.Aug.10

PP-Bolontiku-C [NEW]
Project
Offshore drilling platform (8-legged)
Scope: Engineering/ procurement/ construction/ loading/ fixing
Location: Bolontiku field Campeche basin GOM
Term: 390 days
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $10+million
Contract
Type: Unit prices
Down payment: n/a
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-503-10
Release: 26.Aug.10
Site visit: n/a
1st clarification meeting: 03.Sep.10 (next)
Submission & opening: 23.Sep.10
Ruling: 04.Oct.10
Finalizing: 19.Oct.10
Registered bidders
Potential participants
1.Ray McDermott 2.Industria del Hierro (ICA Fluor Daniel) 3.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 4.CICSA (Carso) 5.Dragados 6.Construcciones y Equipos Latinoamericanos (Protexa) 7.Bosnor 8.Ingenieria Industrial y Maritima 9.Tradeco 10.Evya
Saipem America, Heerema, Eaton Technologies, Hydrotesting Service
Status BIDDING
Updated 26.Aug.10

PP-Tsimin-B [NEW]
Project
Offshore drilling platform (8-legged)
Scope: Engineering/ procurement/ construction/ loading/ fixing
Location: Tsimin field Campeche basin GOM
Term: 390 days
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $10+million
Contract
Type: Unit prices
Down payment: n/a
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-504-10
Release: 26.Aug.10
Site visit: n/a
1st clarification meeting: 02.Sep.10 (next)
Submission & opening: 22.Sep.10
Ruling: 04.Oct.10
Finalizing: 19.Oct.10
Registered bidders
Potential participants
1.Ray McDermott 2.Industria del Hierro (ICA Fluor Daniel) 3.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 4.CICSA (Carso) 5.Dragados 6.Construcciones y Equipos Latinoamericanos (Protexa) 7.Bosnor 8.Ingenieria Industrial y Maritima 9.Tradeco 10.Evya
Saipem America, Heerema, Eaton Technologies, Hydrotesting Service
Status BIDDING
Updated 26.Aug.10

PP- Maloob-D Drilling Platform [AWARDED]
Project
Offshore drilling platform
Scope: Engineering/ procurement/ construction/ loading/ fixing
Location: Maloob field Campeche basin GOM
Term: 450 days starting 15.Aug.10
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity:
Contract
Type: Unit prices
Down payment: n/a
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-012-10
Release: 20.May.10
Site visit: n/a
1st clarification meeting: 27.May.10
2nd clarification meeting: 03.Jun.10
3rd clarification meeting: 14.Jun.10
4th clarification meeting: 18.Jun.10
5th clarification meeting: 23.Jun.10
6th clarification meeting: 30.Jun.10
7th clarification meeting: 07.Jul.10
Legal/administrative preliminary revision: Recommended
Closing: 07.Jul.10
Submission & opening: 14.Jul.10
Registered bidders
1.Ray McDermott 2.Industria del Hierro (ICA Fluor Daniel) 3.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 4.CICSA (Carso) 5.Dragados 6.Construcciones y Equipos Latinoamericanos (Protexa) 7.Bosnor 8.Ingenieria Industrial y Maritima 9.Tradeco 10.Evya
Potential participants
Saipem America, Heerema, Eaton Technologies, Hydrotesting Service
Status AWARDED
Ruling: 03.Aug.10
Construcciones Mecanicas Monclova (COMMSA-GIMSA): $30million
Updated 05.Aug.10

_______________________________

BUSINESS OPPORTUNITY FOR STEEL DISTRIBUTORS
Current tender for Pemex drilling platform
PP-MALOOB-D indicates volumes as follows:

• Steel Plate API-2H-50: +3000 mt

FYI, we have got the experience
to put your company in a position
to submit quotes to contractor
contact us: info@aramoni.com

_______________________________


Kuil-A: Tetrapod (reinforced) [AWARDED]
Project
Offshore terapod platform
Scope: Engineering/ procurement/ construction/ loading/ fixing
Location: Campeche basin GOM
Term: 370 days starting 25.May.10
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity:
Contract
Type: Unit prices
Down payment: n/a
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-002-10
Release: 25.Feb.10
Site visit: n/a
1st clarification meeting: 11.Mar.10
2nd clarification meeting: 25.Mar.10
3rd clarification meeting: 08.Apr.10
4th clarification meeting: 14.Apr.10
5th clarification meeting: 21.Apr.10 (last)
Legal/ administrative preliminary revision: Recommended
Submission & opening: 28.Apr.10
Ruling: 27.May.10
Registered bidders
1.Ray McDermott 2.Global Offshore 3.CIT 4.Bosnor 5.Industrias W 6.Evya 7.CICSA (Carso) 8.Dragados 9.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 10.Construcciones y Equipos Latinoamericanos (Protexa) 11.Tradeco 12.Industria del Hierro (ICA Fluor Daniel)
Potential participants
Saipem, ABB, Heerema
Status AWARDED
Ray McDermott: $21.5million
Updated 27.May.10

_______________________________

Follow aramoni on Twitter
and get timely announcements
on Pemex's tenders as well as
decisive news on the industry

_______________________________


LIVING QUARTER HA-LT-01

Project management support for platform coming tender [AWARDED]
Scope: Idem
Term: 543 days (18 months)
Locations:
Madero Tamaulipas (first 13-month period)
Offshore (last 5-month preriod)
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $750 000+ (10m+ local currency)
Contract
Type: Unit prices
Down payment: n/a
Selection basis: Lowest price bid from compliant proposals
Local content: n/a
Subcontracts allowed: n/a
Bid follow-up
Ref: 18575106-022-09
Release: 03.Sep.09
Site visit: n/a
1st clarification meeting: 08.Sep.09
2nd clarification meeting: 15.Sep.09
3rd clarification meeting: 22.Sep.09
4th clarification meeting: 28.Sep.09
Closing: 30.Sep.09
Submission & opening: 06.Oct.09
Registered bidders
1.COORDINACION TECNICO ADMINISTRATIVA DE OBRAS 2.TECHMAN GROUP 3.GLM COMUNICACIONES 4.NAVARRETE NAVARRO CONSTRUCTORES 5.CONSTRUCTORES Y CONSULTORES DE TAMAULIPAS 6.CONSULTORÍA INTEGRAL EN INGENIERÍA 7.GRUPO OPERADOR DE INGENIERIA Y MONTAJES 8.SUPPLY OUTSOURCING SERVICES 9.BUREAU VERITAS MEXICANA 10.DIRAC 11.GESTION INTEGRAL EMPRESARIAL 12.NARCIA SERVICE 13.SGS DE MEXICO 14.CONSTRUCTORA G T 15.CONSULTORIA, SUPERVISION TECNICA Y OPERACION EN SISTEMAS 16.GRUPO DIARQCO 17.DESARROLLO, TECNOLOGÍA Y PLANEACIÓN 18.BUFETE DE MANTENIMIENTO PREDICTIVO INDUSTRIAL 19.COTER 20.GRUPO SAFFC DE MÉXICO 21.ORGANIZACION DE CALIDAD SIGLO XXI 22.VISION INTEGRAL GENERADORA DE EMPRESAS NACIONALES 23.FELIPE OCHOA Y ASOCIADOS (FOA)
Potential participants
Status AWARDED
Ruling: 12.Nov.09
DIRAC: $1.3million
Updated 14.Nov.09

Project tender history:

40. HA-LT-01: Living quarter module [VOID]
Project
187 living quarter module & interconnection bridge
Scope: Engineering/ procurement/ construction/ loading/ fixing/ transport/ installation
Location: Campeche basin GOM
Term: 660 days starting 04.Sep.08
Mailstones:
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $20m+
Contract
Type: Lump sum & unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-004-08
Release: 20.Mar.08
1st clarification meeting: 07.Apr.08
2nd clarification meeting: 18.Apr.08
3rd clarification meeting: 06.May.08
10th clarification meeting & closing: 10.Jul.08
Submission & opening: 16.Jul.08
Registered bidders
1.Dragados 2.Industria del Hierro (ICA Fluor Daniel) 3.Swecomex 4.J Ray McDermott 5.Heerema Marine Contractors 5.Keppel SLP 6.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 7.Oceanografia
Potential participants
Grupo Constructor Global, JA Energy Fab, Tradeco, Evya, Ingelectric, SIDO E, GI, AILT, Industrias W, Alcatel, Swath, AVC, Sari, Thales, Udee, Rockwell, Dynamic Industries, Cygnus
Status VOID
Tender declared nul (2nd round) on 11.Sep.08
A new RFPs to be announced shortly
Reference
1st-round tender ruled VOID on 19.Jul.07 (full report below)
Updated 12.Sep.08

40. HA-LT-01: Living quarter module [VOID]
Project
187 living quarter module & interconnection bridge
Scope: Engineering/ procurement/ construction/ loading/ fixing/ transport/ installation
Location: Campeche basin GOM
Term: 660 days starting 01.Aug.07
Mailstones:
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $20m+
Contract
Type: Lump sum & unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-013-07
Release: 29.Mar.07
Site visit: 12.Apr.07
1st clarification meeting: 17.Apr.07
8th clarification meeting: 29.May.07
Closing: 29.May.07
Submission & opening: 04.Jun.07
Registered bidders
1.Dragados 2.Industria del Hierro (ICA Fluor Daniel) 3.Swecomex 4.Grupo Constructor Global 5.JA Energy Fab 6.Tradeco 7.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 8.Evya 9.Keppel SLP 10.Ingelectric
Potential participants
SIDO E, GI, AILT, Industrias W, Alcatel, Swath, AVC, Heerema
Status VOID
Tender ruled on 19.Jul.07
A new RFP to be released shortly
Updated 31.Jul.07


OFFSHORE PLATFORM HISTORY

50. Kab-B
18575106-021-09/ 21.Sep.09/ Construcciones Mecanicas de Monclova/ $13million
48. PG-ZAAP-C Power generation
18575106-004-09/ 11.Sep.09/ Dragados Offshore de Mexico/ $202million
49. Kambesah
18575106-019-09/ 28.Jul.09/ Construcciones Mecanicas de Monclova/ $16million
Offshore equipment recondition/ Holkan jack-up platform & PM-4500 drilling rig
18575107-038-08/ Tender declared VOID on 15.Dec.08
40. HA-LT-01: Living quarter module
18575106-004-08/ Tender declared VOID (2nd round) on 11.Sep.08
47. Akal-Te
18575106-005-08/ 09.May.08/ Dragados Offshore de Mexico/ $11.5million
46. Ixtal-B
18575106-035-07/ 11.Feb.08/ Construcciones Mecanicas Monclova (COMMSA-GIMSA)/ $25million
45. Kab-A
18575106-022-07/ 28.Aug.07/ Industria del Hierro (ICA Fluor Daniel)/ $9.5million
44. Atun-D
18575106-010-07/ 20.Jul.07/ Construcciones Mecanicas Monclova (COMMSA-GIMSA)/ $19million
43. Sinan-118
18575106-020-07/ 20.Jul.07/ Construcciones Mecanicas Monclova (COMMSA-GIMSA)/ $11million
42. Sinan-So
18575106-019-07/ 20.Jul.07/ Swecomex/ $12million
41. Yaxche-B
18575106-017-07/ 19.Jul.07/ Industria del Hierro (ICA Fluor Daniel)/ $11.5million
40. HA-LT-01: Living quarter module
18575106-013-07/ 19.Jul.07/ Void
39. Tumut-A: Tetrapod
18575106-009-07/ 12.Jul.07/ Construcciones Mecanicas Monclova (COMMSA-GIMSA)/ $24million
38. HA-RE-01: LIVING QUARTER MODULE (2nd round)
18575106-036-06/ 19.Jul.07/ Void
CHEMUL: Underwater Platform
18575107-091-06/ 08.Feb.07/ Void
PLATFORM COMPLEMENTARY WORKS (2nd-round)
18575108-084-06/ 15.Jan.07/ Oceanografia/ $47million
37. HA-CA-01: LIVING QUARTER MODULE
18575106-011-06/ 25.Oct.06/ Industria del Hierro (ICA Fluor Daniel)/ $90million
LIVING QUARTER MODULE (Re-pumping)
18575108-039-06/ 15.Aug.06/ Canceled
Platform conclusion (Akal)
18575106-008-06/ 08.Jun.06/ Void
Platform linking (KMZ)
18575106-007-06/ 10.May.06/ Demar Instaladora y Constructora/ $40million
36. HA-AJ-01 (Living quarter module)
18575106-027-05/ 25.Jan.06/ Swecomex/ $60million
FPSO (Supervision)
18200002-020-05/ 09.Jan.06/ Cygnus Industrial/ $3.64million
35. Carpa-B (Gathering)
18575008-012-05/ 22.Jul.05/ Shaw Mexican Holdings-Shaw Global Energy Services/ $22million
34. Bagre-C (Gathering)
18575008-082-04/ 11.May.05/ SIPHNOS/ $15.6million
33. PP-AKAL-W (Drill)
18575106-042-04/ 10.Jan.05/ Construcciones Mecanicas de Monclova (COMMSA-GIMSA)/ $39.5million
32. PP-AKAL-Q (Drill)
18575106-041-04/ 17.Dec.04/ Construcciones Mecanicas de Monclova (COMMSA-GIMSA)/ $40million
31. PP-SIHIL-A (Dril)
18575106-040-04/ 14.Dec.04/ Construcciones Mecanicas de Monclova (COMMSA-GIMSA)/ $36.5million
30. PB-KU-H (Production)
18575106-022-04/ 24.Nov.04/ Bosnor/ $162million
28/29. HA-KU-H & ZAAP-C (Living quarters)
18575106-027-04/ 10.Dec.04/ Berry Contracting - Berry GP - Inelectra/ $149million
26/27. HA-KU-S & M (Living quarters)
18575106-025-04/ 29.Oct.04/ Keppel Offshore and Marine USA - SLP Engineering Limited - Anfels - Gulf Island/ $164million
25. CITAM-A (4-legs)
18575106-020-04/ 01.Sep.04/ Construcciones y Equipos Latinoamericanos (PROTEXA)/ $24million
24. CB-ZAAP-C (Compression)
18575106-017-04/ Cancelled
23. PB-ZAAP-C (Link/production)
18575106-016-04/ Cancelled
22. PP-Zaap-A (Drill)
18575106-005-04/ 07.May.04/ ICA Fluor Daniel/ $43million
21. PP-Zaap-B (Drill)
18575106-006-04/ 21.May.04/ Industria del Hierro (ICA Fluor Daniel)/ $39million
20. PP-Zaap-D (Drill)
18575106-007-04/ 21.May.04/ Industria del Hierro (ICA Fluor Daniel)/ $42million
19. PP-KU-S (Drill)
18575106-002-04/ 07.May.04/ Industria del Hierro (ICA Fluor Daniel)/ $45million
18. YAXCHE-A (8L-Drill)
18575106-010-03/ 22.Mar.04/ COMINTER/ $22.5 million
17. PB-KU-M (Production)
18575106-007-03/ 01.Jun.04/ Swecomex-Condumex (parent company)/ $130million
16. PB-KU-S (Production)
18575106-008-03/ 01.Jul.04/ Swecomex/ $225million
15. PB-KU-A2 (Production)
18575106-009-03/ 16.Jul.04/ Dragados Offshore de Mexico/ $185million
13/14. SINAN-A/B (8L-Drill)
18575106-006-03/ 23.Feb.04/ Construccion Ingenieria y Montaje Integral (CIMISA)/ $43million
12. Lobina-1 (Gathering)
18575106-003-03/ 02.Apr.04/ Shaw Mexican Holdings/ $15.5million
10/11. SINAN-C/D (8L-Drill)
18575087-017-03/ 16.Jan.04/ Construcciones Mecanicas de Monclova (COMMSA/GIMSA)/ $44million
9. PP-KU-C (Drill)
18575087-015-03/ 07.Oct.03/ Bosnor/ $37million
7/8. PP-Maloob-A/B (Drill)
18575087-009-03/ 12.Sep.03/ Swecomex/ $ 80.5million
6. Manik-A (Drill)
18575087-008-03/ 02.Sep.03/ Swecomex/ $33.5million
5. KU-A2 (Link)
18575087-002-03/ 08.Aug.03/ Construcciones Mecanicas de Monclova (COMMSA/GIMSA)/ $48million
3/4. MAY-A/B (Drill)
18575087-001-03/ 01.Jul.03/ ICA Fluor Daniel/ $55million
2. Ixtal-A (8L-Gathering)
18575038-019-02/ Bay de Mexico
1. Lankahuasa-1 (Gathering)
18575008-062-02/ ICA Fluor Daniel

FOR REFERENCE DETAILED INFO ON THESE TENDERS IS POSTED IN THE NEXT PAGE

___________________________________

FYI, we have got a comprehensive
understanding of these tenders and
offer expert tailor-made assistance to
international companies pursuing projects in Mexico
A description of our services posted after the report
Contact: info@aramoni.com
____________________________________


MULTIPLE SERVICE CONTRACTS
No major tenders currently

MSC History:
21. BURGOS VIII-C
18575110-003-09/ Tender CANCELED on 02.Dec.09/ A new RFPs to be announced early 2010
20. BURGOS VIII-B
18575110-002-09/ Tender CANCELED on 15.Dec.09/ A new RFPs to be announced early 2010
19. BURGOS VIII-A
18575110-001-09/ 17.Aug.09/ Industrial Perforadora de Campeche (IPC)/ $578million
18. CHICONTEPEC V
18575051-005-09/ Tender declared VOID on 11.May.09/ A new RFPs to be announced
17. CHICONTEPEC IV
18575051-046-08/ 27.Mar.09 /WEATHERFORD DE MEXICO/ $646million
16. CHICONTEPEC III
18575051-044-08/10.Mar.09/ Dowell Schlumberger - OFS Servicios - Drillers Technology/ $687million
15. CHICONTEPEC II
18575051-050-06/ 13.Jun.07/ Dowell Schlumberger de Mexico/ $1395million/ 4yrs
14. BLOCK EURO
18575110-036-06/ Tender declared VOID on 06.Mar.07/ A new RFPs to be announced
13. BLOCK MONCLOVA
18575110-035-06/ 22.Mar.07/ Construcciones Mecanicas de Monclova (COMMSA)/ $440million/ 15yrs
12 BLOCK NEJO
18575110-034-06/ 05.Mar.07/ Grupo Cobra (es)/ $930million/ 15yrs
Updated 09.Mar.07
11. PANDURA-ANAHUAC
18575008-060-04/ 26.Oct.04/ Industrial Perforadora de Campeche (Mx) - Desarrollo y Servicio Petrolero (Mx)/ $900million/ 15yrs
10. RICOS
18575008-061-04/ 08.Feb.05/ VOID
9. MONCLOVA
18575008-064-04/ 15.Feb.05/ Hullera Mexicana (Mx) - Energy Milenium (Mx) - Andrews Technologies de Mexico (Mx)- Yuma Exploration (US) - Aries Operating (US)/ $456million/ 15yrs
8. PIRINEO
18575008-065-04/ 24.Feb.05/ Constructora Industrial Monclova (Mx) - Materiales La Gloria (Mx) - Alianz Petroleum (Mx) - Steel Serv (Mx) - Suelopetrol (Ve) - NCT (Ve) - Petrotesting Colombia (Co)/ $645million/ 15yrs
7. OLMOS
18575008-138-03/ 15.Jan.04/ Lewis Energy Group/ $343.6million/ 15yrs
6. FRONTERIZO
18575008-137-03/ 19.Nov.03/ Petroleo Brasileiro Mexico: Petrobras-Teikoku Oil Co-D&S Petroleum (Diavaz)/ $265million/ 15yrs
5. RICOS
18575008-128-03/ 12.Nov.03/ VOID
4. CORINDON-PANDURA
18575008-131-03/ 05.Nov.03/ VOID
3. MISION
18575008-130-03/ 30.Oct.03/ Elina del Bajio: Elina-Techint-Industrial Perforadora de Campeche (IPC)/ $1,036million/ 20yrs
2. CUERVITO
18575008-136-03/ 23.Oct.03/ Petroleo Brasileiro Mexico: Petrobras-Teikoku Oil Co-D&S Petroleum (Diavaz)/ $260million/ 15yrs
1. REYNOSA-MONTERREY
18575008-129-03/ 16.Oct.03/ Repsol Exploracion-YPS/ $2,437million/ 20yrs

FOR REFERENCE DETAILED INFO ON THESE TENDERS IS POSTED IN THE NEXT PAGE

___________________________________

FYI, we have got a comprehensive
understanding of these tenders and
offer expert tailor-made assistance to
international companies pursuing projects in Mexico
A description of our services posted after the report
Contact: info@aramoni.com
____________________________________


PEMEX REFINING (PR)

INTEGRAL PROGRAM FOR CLEAN FUELS

SULPHUR RECOVERY PLANT SRU-2 [DECISION PENDING]
Projects
Description: 100 TPD in two lines (50+50)
Location: Minatitlan refinery complex
Scope: Engineering (in agreement with Worley Parsons license) Procurement Construction Integration Commissioning
Construction term: 630 days
Selection basis: Lowest price bid amongst compliant proposals
Local content: 10%
Contracts
Commissioner: Pemex PR (Govt)
Type: Combined lump sum & unit prices
Payment/milestone:
Fronting: 15.25% of budget for 2010
Selection basis: Lowest price bid amongst compliant proposals
Bidders profile
Company/consortium from any country
Experience required: Design and construction of similar industrial plants
Combine equity: $25+ (330million local currency)
Bid follow-up
Ref: 18576012-021-10
Release: 06.May.10
Site visit: 11.May.10
1st Clarification meeting: 14.May.10
2nd Clarification meeting: 28.May.10
3rd Clarification meeting: 11.Jun.10
4th Clarification meeting: 25.Jun.10
5th Clarification meeting: 12.Jul.10
Preliminary revision: (highly recomended)
Proposal submission & opening: 20.Jul.10
Registered bidders
1.DOUBLE V HOLDING 2.CONIP CONTRATISTAS 3.ARENDAL 4.ABB 5.GRUPO DE INGENIERIA CAPRICORNIO 6.OHL INDUSTRIAL 7.COIMSUR 8.CHEMISA 9.TRADECO INDUSTRIAL 10.TECNINT 11.AUTOMATION AND CONTROL SOLUTIONS 12.COPESA 13.CONSTRUCTORA ATZCO 14.LIPSA INDUSTRIAL 15.INELECTRA NORTH AMERICA
Potential participants
Status SUBMITTED
Updated 23.Jul.10/rev 27.Aug.10

EXPERT ENGINEERING SERVICES (Diesel Phase) [AWARDED]
Scope:
1.Supervision of FEED for diesel desulphurization plants
2.Bid documentation for tendering the IPC contracts for these projects
3.Basic engineering for plant integration and auxiliary services
4.Coordination with projets for naphta desulphurization (below)
Location: Pemex refineries of Tula, Salamanca, Madero, Minatitlan, Salina Cruz & Cadereyta
Term: 570 days starting 16.Nov.09
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $1.5m+ (20m+ local currency)
Contract
Type: Unit prices
Down payment: 50% annually budget for 2009
Selection basis: Lowest price bid from compliant proposals
Local content: n/a
Subcontracts allowed: n/a
Bid follow-up
Ref: 18572039-006-09
Release: 25.Aug.09
Site visit: n/a
1st clarification meeting: 02.Sep.09
2nd clarification meeting: 09.Sep.09
3rd clarification meeting: 15.Sep.09
4th clarification meeting: 23.Sep.09
5th clarification meeting: 02.Oct.09
6th clarification meeting & questioning deadline: 07.Oct.09
Closing: 13.Oct.09
Submission & opening: 19.Oct.09
Registered bidders
1.Conip 2.Jacobs 3.Inelectra 4.CH2M Hill International 5.Technip 6.Spisa 7.Norcontrol 8.SGS 9.ABS 10.Jantesa
Potential participants
Status AWARDED
Ruling: 17.Nov.09
Inelectra North America: $25million
Updated 27.Nov.09

SALINA CRUZ & MINATITLAN UNITS [AWARDED]
Projects
Description: Naphta desulphurization units (2)
Location: Salina Cruz & Minatitlan refinery complexes
Scope: Engineering Procurement Construction Integration
Capacitiy
1.Salina Cruz:
2.Minatitlan:
Construction term: 1290 days starting 19.Mar.10
Selection basis: Lowest price bid amongst compliant proposals
Local content:
Contracts (2)
Commissioner: Pemex PR (Govt)
Type: Combined lump sum & unit prices
Payment/milestone:
Fronting: 30% annually budget every year
Selection basis: Lowest price bid amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Company/consortium from countries having a free trade agreement with Mexico
Experience required:
1.Successful EPC contracts for hydrocarbon process projects up to $200m+ in the last 5 years
2.It should include at least a catalitic reaction and/or a destilation process currently in operation
Combine equity: $75m+ (1 billion Pesos)
Bid follow-up
Ref: 18572039-005-09
Release: 28.Jul.09
Site visit: 12-13.Aug.09
1st Clarification meeting: 19.Aug.09
2nd Clarification meeting: 28.Aug.09
3rd Clarification meeting: 10.Sep.09
4th clarification meeting: 25.Sep.09
5th clarification meeting: 09.Oct.09
6th clarification meeting: 23.Oct.09
7th clarification meeting: 06.Nov.09
8th clarification meeting: 20.Nov.09
9th clarification meeting: 04.Dec.09
Questioning deadline & 10th clarification meeting: 18.Dec.09
11th clarification meeting: 30.Dec.09
Closing: 09.Jan.10
Proposal submission & opening: 15.Jan.10
Registered bidders
1.ACS 2.ICA Fluor Daniel 3.Spisa 4.Technip 5.Sener 6.Sadeven 7.OHL 8.ABB Italia-ABB Mexico 9.Siemens 10.Isolux 11.Samsung 12.Techint 13.Spisa 14.Mitsui 15.ARB Arendal 16.Tecnimont
Potential participants
Ruhrpumpen, ISA, Automation & Control, Emerson, SK Engineering & Construction, Vica, Thales, Barlett, Integracion de Sistemas de Actuacion, Invensys, Automation & Control Solutions, Pepperl+Fuchs, Ingersoll Rand
Actual proposals
1.Technip Italy/ Technip de México/ Isolux Ingeniería/ Isolux de México
2.Saipem/ Saigut
3.ICA Flour Daniel
4.ACS Servicios, Comunicaciones y Energía México/ Dragados Industrial/ ACS Servicios, Comunicaciones y Energía/ Senermex Ingeniería y Sistemas
5.ABB/ ARB Arendal/ Worley Parsons México Ingeniería
6.Tecnimont/ Grupo Samsung Ingeniería de México
Status AWARDED
Ruling: 25.Feb.10
ICA Fluor Daniel: $624million (contact info by request)
Updated 26.Feb.10

CADEREYTA & MADERO UNITS [AWARDED]
Projects
Description: Naphta desulphurization units (2)
Location: Cadereyta & Madero refinery complexes
Scope: Engineering Procurement Construction Integration
Capacitiy
1.Cadereyta:
2.Madero:
Construction term: 1320 days starting 21.Sep.09
Selection basis: Lowest price bid amongst compliant proposals
Local content:
Contracts (2)
Commissioner: Pemex PR (Govt)
Type: Combined lump sum & unit prices
Payment/milestone:
Fronting: 30% annually budget every year
Selection basis: Lowest price bid amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Company/consortium from countries having a free trade agreement with Mexico
Experience required:
1.Successful EPC contracts for hydrocarbon process projects up to $200m+ in the last 5 years
2.It should include at least a catalitic reaction and/or a destilation process currently in operation
Combine equity: $75m+ (1 billion Pesos)
Bid follow-up
Ref: 18572039-001-09
Release: 12.Feb.09
Site visit: 23-24.Feb.09
1st Clarification meeting: 05.Mar.09
12th Clarification meeting: 07.Jul.09
Questioning deadline: 12.Jul.09
13th Clarification meeting & closing: 14.Jul.09
Proposal submission & opening: 20.Jul.09
Registered bidders
1.Inelectra North America 2.Technip 3.Saimex 4.Spisa 5.Cicsa 6.Sener 7.Sadeven 8.ICA Fluor Daniel 9.Jantesa 10.ABB 11.Tecnicas Reunidas 12.Hegues 13.Techint 14.Siemens 15.GS Engineering and Construction Corp 16.Prolec GE 17.ARB Arendal
Potential participants
Consutec, K Tronix, Samsung, Uhde, Dragados, Siemens, Isolux, SK Engineering & Construction, Termotecnia, Sojitz, OHL Industrial, Solucion, Emerson, Therom, Invensys, Automatizacion y Control, Peper LT Fuchs, Automation & Control, K Tronix, Reciptech, Rockwell, Vica, Analitica, Thales, Yokogawa, Sulzer Chemtech, Thales, Kentech ME&I, Setemi, Sapi, Idom, Galcor, Ruhrpumpen, GEA, Orben, Dupont
Status AWARDED
Ruling: 21.Aug.09
ICA Fluor Daniel: $638million (contact info by request)
Updated 21.Aug.09

TULA & SALAMANCA UNITS [VOID]
Projects
Description: Naphta desulphurization units (2)
Location: Tula & Salamanca refinery complexes
Scope: Engineering Procurement Construction Integration
Capacitiy
1.Tula:
2.Salamanca:
Construction term: 45 months (1350 days) starting 25.May.09
Selection basis: Lowest price bid amongst compliant proposals
Local content:
Contracts (2)
Commissioner: Pemex PR (Govt)
Type: Combined lump sum & unit prices
Payment/milestone:
Fronting: n/a
Selection basis: Lowest price bid amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $90m+ (1 billion Pesos)
Bid follow-up
Ref: 18572039-006-08
Release: 11.Sep.08
Site visit: 18-19.Sep.08
1st Clarification meeting: 25.Sep.08
16th Clarification meeting: 19.Mar.09
Questioning deadline: 22.Mar.09
17th Clarification meeting and closing: 24.Mar.09
Proposal submission & opening: 30.Mar.09
Ruling: 29.Apr.09
Registered bidders
1.Jantesa 2.Sadeven 3.Samsung 4.ABB 5.ICA Fluor Daniel 6.Hegues 7.Saimex 8.Sener 9.Dragados 10.Siemens 11.Isolux 12.SK Engineering & Construction 13.CICSA 14.Termotecnica 15.Techint 16.Sojitz 17.OHL Industrial 18.Inelectra North America 19.Prolec GE 20.SAPI
Potential participants
Solucion, Emerson, Therom, Invensys, Automatizacion y Control, Peper LT Fuchs, Automation & Control, K Tronix, Reciptech, Rockwell, Vica, Analitica, Thales, Yokogawa, Schrader Camargo
Submitted proposals
1.Samsung Engineering Co
2.Saimexicana - Saipem
3.ICA Fluor Daniel
4.Isolux - Jantesa
5.ACS Servicios Comunicaciones y Energía - Dragados Industrial - ASC Servicios Comunicaciones y Energía México - Senermex Ingeniería y Proyectos - Proyectos y Desarrollo de Infraestructura
Status VOID
Tender declared nul on 28.May.09
A new RFPs to be announced shortly
Updated 29.May.09

____________________________________

We provide the expertise
to produce compliant tender proposals
for PEMEX & CFE requests

____________________________________


FEDERAL COMMISSION OF ELECTRICITY (CFE)

POWER PLANTS

Cogeneration SALAMANCA-1 [BIDDING]
Project
Scope: Design/ engineering/ procurement/ construction/ installation/ commissioning/ financing
Capacity: 430.2 Mw +/- 15% (summer conditions)
Location: Next to Pemex Salamanca refinery
Contract
Type: Lump sum
Financing: 100%
Construction term: 985 days
Local content: 16%
Selection basis: Lowest price bid amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $110m+ (1415m+ local currency)
Bid follow-up
Ref: 18164093-007-10
Release: 27.May.10
Site visit: 03.Jun.10
1st Clarification meeting: 17.Jun.10
2nd Clarification meeting: 01.Jul.10
3rd Clarification meeting: 02.Aug.10
4th Clarification meeting: 31.Aug.10 (next)
Proposal submission and opening: 28.Sep.10
Registered bidders
1.Sener 2.Cobra 3.Sademex 4.Itochu 5.Mitsubishi 6.Iberdrola 7.Schrader Camargo 8.Inelectra North America 9.Vertek 10.SK 11.Samsung 12.Aldesem 13.Acciona 14.Duro Felguera 15.Elecnor 16.Isolux 17.Siemens 18.OHL 19.Alston 20.GE 21.Techint 22.Abener
Potential participants
Status BIDDING
Updated 05.Aug.10/rev 20.Aug.10

Previous tender ref: Cogeneration Plant New Pemex
Contract
Location: Gas processor complex: Nuevo Pemex, Tabasco
Commissioner: Pemex Gas & Basic Petrochemical (Govt)
Scope: Service contract for steam & power delivery out of water & gas supplied by Pemex
Pemex water supply: 800 m tons/hour +2.5%
Pemex gas supply: 110 mcfd (42kg/cm2)
Steam flow delivery: 550-800 m tons/hour
Power capacity (summer conditions): 300 Mw +/-15%
Construction term: 3yrs
Service term: 20yrs
Selection basis: Lowest price bid amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $50m+
Local content: 25%
Bid follow-up
Ref: 18577001-036-08
Release: 28.Aug.08
Site visit: 18-19.Sep.08
1st Clarification meeting: 16.Oct.08
2nd Clarification meeting (questioning): 12.Jan.09
2nd Clarification meeting (responses): 12.Feb.09
3rd Clarification meeting (questioning): 01.Apr.09
3rd Clarification meeting (responses): 20.May.09
4th Clarification meeting (questioning): 26.May.09
4th Clarification meeting (responses): 08.Jun.09
5th Clarification meeting (questioning): 16.Jul.09
5th Clarification meeting (responses): 30.Jul.09
6th Clarification meeting (questioning): 03.Aug.09
6th Clarification meeting (responses): 06.Aug.09
Closing: 06.Aug.09
Proposal submission & opening: 12.Aug.09
Registered bidders
1.ABB 2.Abengoa 3.Abener 4.ARB Arendal 5.Areva T&D 6.CEGELEC 7.Cobra 8.Dalkia 9.Dragados 10.Duke Energy 11.Endesa 12.GE 13.Iberdrola 14.ICA Fluor Daniel 15.Kepler Constructora 16.Marubeni 17.Mitsubishi 18.Mitsui 19.SAPI 20.Saveden 21.Siemens 22.Suez 23.Techint 24.Prolec 25.GE 26.Santander Bank 27.ContourGlobal
Potential participants
Fenosa, Sener, Elecnor, AES North America Development, AES Tamuin SLP, Isolux, Acciona, Idom Ingenieria, Socoin, Banamex, Quintana Capital, Honeywell, Emerson Process, Mexico Constructora Industrial, Tradeco, URS, Temura
Submitted proposals
1.Abengoa-Abener
2.Dragados-ACS-Cobra
Status AWARDED
Ruling: 31.Aug.09
Abengoa-Abener: $0.4225Kw/hr
Updated 01.Sep.09

CC EL SAUZ-1 [BIDDING]
Project
Scope: Major equipment replacement (turbines/ heat recuperators) and plant modernization
Capacity: 222 Mw+
Location: Queretaro
Contract
Type: Lump sum
Financing: 100%
Construction term: 827 days
Selection basis: Lowest price bid amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $50m+ (655m+ local currency)
Bid follow-up
Ref: 18164093-006-10
Release: 27.May.10
Site visit: 09.Jun.10
1st Clarification meeting: 28.Jun.10
2nd Clarification meeting: 29.Jul.10
3rd Clarification meeting: 24.Aug.10
4th Clarification meeting: 20.Sep.10 (next)
Proposal submission and opening: 20.Oct.10
Ruling: 18.Nov.10
Registered bidders
1.Isolux 2.Cobra 3.Alstom 4.Siemens 5.Sener 6.Iberdrola 7.GE 8.Tizayuca Cogeneracion (IGSA) 9.OHL 10.Golden Hills
Potential participants
Saye, Duro Felguera, Diamante Manzanillo (Mitsubishi), Worleyparsons International, , ACS, Inelectra, GE, Schrader Camargo, Acciona, Elecnor, ABB
Status BIDDING
Updated 27.Aug.10

WIND OAXACA II, III, IV [AWARDED]
this is a new 3-winner format tender in order to assign
three individual/independent IPP contracts

Project
Capacity: 3x101.4 Mw +/-2%
Location: La Ventosa area in Oaxaca
Construction term: 526 days starting 15.Jul.10 through 23.Dec.11
Contracts
IPP (3)
Term: 20yrs
Selection basis: Lowest price bid amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $42m+
Local content: 25%
Bid follow-up
Ref: 18164093-040-09
Release: 03.Nov.09
Site visit: 11.Nov.09
1st Clarification meeting: 02.Dec.09
2nd Clarification meeting: 25.Jan.10
Closing: 05.Feb.10
Proposal submission & technical part opening: 11.Feb.10
Economic part opening: 26.Feb.10
Registered bidders
1.Iberdrola 2.Energias Ambientales de Oaxaca 3.Suez Energia 4.Enerfin 5.GE 6.Acciona 7.Abengoa 8.Siemens 9.Leokon Korea 10.Fenosa 11.Notus Energy 12.Gimsa 13.ICA Fluor Daniel 14.Gesa 15.Mitsui
Potential participants
Desarrollos Eolicos Mexicanos, ENHOL, Capital Energy, Energia y Recursos Ambientales (EYRA), Enel, Mitsubishi, Gamesa Eolica, Endesa, EDF, Elecnor, Aldesa, Promotora Ambiental, Competitive Power Ventures
Actual proposals
1.Iberdrola $0.0806 USD/Kwh
2.Recursos Eolicos de Mexico II: $0.0737 USD/Kwh, III:$0.1050 USD/Kwh, IV: $0.0840 USD/Kwh
3.Enerfin - Elecnor II: $0.0716 USD/Kwh, IV: $0.0713 USD/Kwh
4.Acciona Energia Mexico II: $0.0658 USD/Kwh, III: $0.0678 USD/Kwh, IV: $0.0637 USD/Kwh
Status AWARDED
Ruling: 08.Mar.10
Acciona Energia Mexico:
Oaxaca II: $0.0658 USD/Kwh
Oaxaca III: $0.0678 USD/Kwh
Oaxaca IV: $0.0637 USD/Kwh
Updated 19.Mar.10

Previous tender ref: WIND OAXACA I
Project
Capacity: 101.4 Mw
Location: La Ventosa Oaxaca
Term: 473 days from 14.Aug.09 to 30.Nov.10
Contract
IPP 20yrs
Selection basis: Lowest price bid amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $50m+
Local content: 25%
Bid follow-up
Ref: 18164093-031-08
Release: 02.Sep.08
Site visit: 09.Sep.08
1st Clarification meeting: 02.Oct.08
2nd Clarification meeting: 21.Nov.08
3rd Clarification meeting: 12.Feb.09
4th Clarification meeting: 11.Mar.09
5th Clarification meeting: 23.Mar.09
6th Clarification meeting: 26.Mar.09 (last)
Closing: 16.Feb.09
Technical & economic proposal submission: 06.Apr.09
Technical proposal opening: 06.Apr.09
Economic proposal opening: 29.Apr.09 (next)
Ruling: 11.May.09
Registered bidders
1.Iberdrola 2.Desarrollos Eolicos Mexicanos 3.ENHOL 4.Abengoa 5.Fenosa 6.Enerfin 7.Capital Energy 8.Prolec GE International 9.Suez Energia 10.Energia y Recursos Ambientales (EYRA) 11.Acciona 12.Leasing Operations
Potential participants
Enel, Mitsubishi, Gamesa Eolica, Endesa, EDF, Mitsui, Elecnor, Aldesa, Promotora Ambiental, Competitive Power Ventures
Submitted proposals
1.Acciona Energia de Mexico
2.Energia y Recursos Ambientales (EYRA)- Energias Ambientales de Guadalajara
3.Enerfin - Elecnor
Status AWARDED
Energia y Recursos Ambientales (EYRA)- Energias Ambientales de Guadalajara: $0.0660 USD/kWh
Updated 15.May.09

CC MANZANILLO [AWARDED]
Ref:
Actual proposals
1.Iberdrola - Diamante Manzanillo (Mitsubishi): $0.08436 USD/Kwh ($1.06billion)
2.Isolux - Worleyparsons International (Siemens Westinhouse): $0.08212 USD/Kwh ($1.06billion)
3.Cobra - ACS - Inelectra (General Electric): $0.07925 USD/Kwh ($981million)
Status AWARDED
Ruling: 11.Feb.10
Cobra - ACS - Inelectra (General Electric): $0.07925 USD/Kwh ($981million)
Updated 19.Mar.10

CC-SOLAR POWER PLANT AGUA PRIETA II (2nd-round) [AWARDED]
Project
Description: Combined cycle plant + solar camp
Capacity: 343.4-464.6 MW (summer conditions)
Scope: Design/ engineering/ procurement (partial) / construction/ installation/ tests/ training/ commissioning
Equipment supplied by Commissioner: Gas turbogenerators/ steam generators/ auxiliary systems/ solar camp & auxiliary systems
Location: Sonora
Contract
Commissioner: CFE (Govt)
Type: Lump sum
Term: 943 days
Financing: 100% by contractor
Selection basis: Best qualified amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $885m+ (1115m+ local currency)
Local content: 10%
Subcontracts allowed:
Bid follow-up
Ref: 18164093-022-09
Release: 11.Jun.09
Site visit: 25.Jun.09
1st clarification meeting: 29.Jul.09
2nd clarification meeting: 04.Sep.09
3rd clarification meeting: 12.Nov.09
4th clarification meeting: 16.Dec.09
5th clarification meeting: 02.Feb.10
6th clarification meeting: 25.Feb.10
7th clarification meeting: 25.Mar.10
8th clarification meeting: 21.Apr.10
9th clarification meeting: 24.May.10
10th clarification meeting: 04.Jun.10
11th clarification meeting: 11.Jun.10 (last)
Closing: 30.Jun.10
Submission & opening: 06.Jul.10
Registered bidders
1.Isolux 2.OHL 3.Sener 4.Iberdrola 5.Cobra 6.Abener 7.Prolec GE 8.Inelectra 9.Techint 10.Siemens 11.Acciona 12.Elecnor
Potential bidders
Itochu, ICA Fluor Daniel, El Paso, Dragados, Mitsubushi, Man Ferrostaal, Socoin, GE, IEE
Status AWARDED
Ruling: 11.Aug.10
Sener - Elecnor - Proyectos Electricos Agua Prieta
Updated 20.Aug.10

Previous tender ref: CC-SOLAR POWER PLANT AGUA PRIETA II [VOID]
Project
Description: Combined cycle plant formed by 2/3 gas turbogenerators with steam generators and auxiliary systems, one steam turbogenerator with auxiliary systems, one air condensator and complementary equipment. Also a solar camp to generate steam for the combined cycle. And the interconnection with a 230 kV substation.
Gas capacity: 535.64 MW +/- 15% (summer conditions)
Solar capacity: 24 MW
Scope: Design/ engineering/ procurement/ construction/ installation/ tests/ training/ commissioning
Location: Sonora
Contract
Commissioner: CFE (Govt)
Type: Lump sum
Term: 859 days starting 26.Sep.07
Financing: 100% gas capacity by contractor
Donation: $49.35million for 100% solar capacity by GEF-World Bank
Payment/milestone: Bid offer/ Provisional acceptance by CFE: 01.Feb.10
Selection basis: Best qualified amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $100m+
Local content: 16%
Subcontracts allowed: Design/ engineering/ construction/ commissioning
Bid follow-up
Ref: 18164093-022-06
Release: 29.Aug.06
Site visit: 06.Sep.06
1st clarification meeting: 04.Oct.06
12th clarification meeting: 05.Jul.07
13th clarification meeting: 19.Jul.07
14th clarification meeting: 31.Jul.07 (last)
Closing: 02.Aug.07
Submission & opening: 08.Aug.07
Registered bidders
1.Iberdrola 2.Abener 3.Isolux 4.Dragados 5.Mitsubushi 6.Sener 7.Man Ferrostaal 8.Siemens 9.Socoin 10.Cobra 11.GE 12.El Paso 13.Techint 14.Itochu 15.ICA Fluor Daniel
Status
Tender declared nul on 08.Aug.06
A new RFPs to be announced shortly
Updated 10.Aug.07

CT-TG Baja California II phase 1 [VOID]
Project
Commissioner: CFE (Govt)
Location: Rosarito, Baja California
Capacity: Summer 76-103 Mw / Average 105.4-142.6 Mw
Scope: EPC
Construction program:
547 days starting 05.Mar.10
Provisional acceptance: 30.Jun.11
Contract: Lump sum & financing
Local content:
Selection basis
Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $28m+ (local currency 359million+)
Bid follow-up
Ref: 18164093-019-09
Release: 02.Jun.09
Site visit: 11.Jun.09
1st clarification meeting: 21.Jul.09
2nd clarification meeting: 31.Jul.09
3rd clarification meeting: 01.Sep.09
4th clarification meeting: 29.Sep.09
5th clarification meeting: 23.Oct.09
6th clarification meeting: 10.Nov.09
7th clarification meeting: 21.Dec.09
8th clarification meeting: 20.Jan.10
9th clarification meeting: 26.Feb.10 (last)
Closing: 27.Feb.10
Proposal submission & opening: 05.Mar.10

Registered bidders
1.Isolux 2.Pratt & Whitney-Dinamo 3.OHL 4.GE 5.ICA Fluor Daniel 6.Abener 7.Cobra 8.Prolec GE 9.Rolls-Royce 10.Elecnor 11.Techint 12.Siemens 13.Lipsa 14.Sener 15.SNC Lavalin Constructors 16.Iberdrola
Potential bidders
ABB, Emerson, Sentry, HPI-Servicontrol Mty
Status VOID
Tender declared nul on 30.Mar.10
A new RFP should be released shortly
Updated 30.Mar.10

CC Poza Rica [AWARDED]
Project
Commissioner: CFE (Govt)
Location: Poza Rica, Veracruz
Capacity: 160 Mw
Scope: EPC
Construction program:
732 days
Contract: Lump sum & financing
Local content:
Selection basis
Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $26m+ (local currency 339million+)
Bid follow-up
Ref: 18164093-016-09
Release: 28.May.09
Site visit: 09.Jun.09
1st Clarification meeting: 16.Jul.09
2nd Clarification meeting: 25.Aug.09
3rd Clarification meeting: 01.Oct.09
4th Clarification meeting: 11.Dec.09
5th Clarification meeting: 19.Jan.10 (last)
Closing: 11.Feb.10
Proposal submission & opening: 17.Feb.10
Registered bidders
1.OHL 2.HPI 3.Inelectra 4.Techint 5.Isolux 6.Siemens 7.Acciona 8.IGSA
Status AWARDED
Ruling: 16.Mar.10
IGSA: $11million
Updated 24.Mar.10

CC POWER PLANT NORTE II [AWARDED]
Project
Commissioner: CFE (Govt)
Location: Chihuahua
Capacity: 376+15% Mw (summer condition design)
Scope: Engineering Construction Operation Financing & Owning
Construction program:
870 days starting 08.Jan.11
Contract: External Power Producer (IPP)
Term: 25 years starting 31.May.13
Local content: 25% Min
Selection basis
Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $78m+ (local currency 1billion+)
Bid follow-up
Ref: 18164093-047-08
Release: 23.Dec.08
Site visit: 13.Jan.09
1st Clarification meeting: 03.Mar.09
2nd Clarification meeting: 28.Apr.09
3rd Clarification meeting: 18.Aug.09
4th Clarification meeting: 29.Sep.09
5th Clarification meeting: 20.Oct.09
6th Clarification meeting: 30.Nov.09
7th Clarification meeting: 26.Jan.10
8th Clarification meeting: 15.Feb.10
9th Clarification meeting: 29.Mar.10
10th Clarification meeting: 20.Apr.10
11th Clarification meeting: 18.May.10
12th Clarification meeting: 27.May.10
Closing: 12.Jun.10
Submission & technical proposal opening: 18.Jun.10
Technical ruling and offer disclosure: 20.Jul.10 (next)
Registered bidders
1.Senermex 2.Iberdrola 3.Mitsubishi 4.Alstom 5.ICA Fluor Daniel 6.Union Fenosa 7.Abener 8.Dragados-Cobra 9.Suez 10.GE 11.Prolec 12.Endesa 13.Siemens 14.Samsung 15.Mitsui 16.Techint 17.Energia Azteca (Intergen) 18.Abengoa
Potential bidders
Duro Felguera, Itochu, Gas de France, Electricidad Sol de Tuxpan, Brycsa, Emerson, Tribasa, Sadeven, Isolux
Actual proposals
1.Korea Electric Power Corp - Samsung C&T Corp - Techint
2.Mitsubishi Corp - Kyushu Electric Power Co
3.Mitsui & Co
4.Iberdrola Energia
5.Abener Energia - Abengoa Mexico - Abeinsa
Status AWARDED
Ruling: 02.Aug.10
Korea Electric Power Corp - Samsung C&T Corp - Techint:
1.1214 Pesos/kWh ($418million)
Updated 20.Aug.10

Previous tender ref: CC POWER PLANT NORTE [AWARDED]
Project
Commissioner: CFE (Govt)
Location: Durango
Capacity: 333-450 Mw
Scope: Engineering Construction Operation Financing & Owning
Construction program: 739 days starting 24.May.07
Contract: External Power Producer
Term: 25 years
Local content: 25% Min
Selection basis
Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity:
US$92m+ (local currency 1b+)
Bid follow-up
Ref: 18164093-015-05
Release: 15.Nov.05
Register deadline: 17.Oct.06
Submission: 23.Oct.06
Offers opening: 19.Jan.07
Decision: 05.Mar.07
Registered bidders
1.Hitachi 2.GE 3.Techint 4.Chubu 5.Siemens 6.Transalta 7.Electricite de France 8.Constructora Andrade Gutierrez 9.Itochu 10.Petrobras 11.Mitsubishi 12.Fenosa 13.Valladolid International Investments 14.Energia Azteca (Intergen) 15.Iberdrola 16.Mitsui 17.Prolec GE 18.ICA Fluor Daniel 19.Energia Termodurango 20.ABB
Status AWARDED
Union Fenosa Internacional: 0.6294 Pesos/kWh (DOF 15.May.07)
(Updated 09.Mar.07)


POWER PLANT HISTORY

Geothermo Los Humeros II phase B
18164093-031-09/ 04.Dec.09/ Alstom Mexicana/ $3.7million
Geothermo Cerro Prieto V
18164093-009-09/ 19.Jan.10/ VOID a new RFPs to be announced shortly
WIND Oaxaca I
18164093-031-08/ 11.May.09/ Energia y Recursos Ambientales (EYRA)- Energias Ambientales de Guadalajara/ $0.0660 USD/kWh
WIND La Venta III
18164093-002-07/ Tender declared VOID on 24.Oct.07
Wind La Venta II/ 83.3 Mw (98 units)/ 31.Aug.05/ Iberdrola - Gamesa Eolica/ $111.4million
HYDROELECTRIC LA YESCA
18164093-001-07/ 06.Sep.07/ ICA-Adisa-La Peninsular/ $768million
CC-SOLAR POWER PLANT AGUA PRIETA II
18164093-022-06/Tender declared VOID on 08.Aug.06/ A new RFPs to be announced shortly
NUCLEAR POWER PLANT LAGUNA VERDE (1st Fase)
18164093-013-06/ 12.Feb.07/ Iberdrola Ingenieria y Consultoria Mexico - Iberdrola Ingenieria y Construccion - Alstom Mexicana/ $605million
CC POWER PLANT NORTE
18164093-015-05/ 05.Mar.07/ Union Fenosa Internacional/ 0.6294 Pesos/kWh
CC POWER PLANT BAJA CALIFORNIA
18164093-017-06/ 27.Sep.06/ Isolux-Techint/ $174million
COAL POWER PLANT PACIFICO
18164093-003-03/ 06.Dec.05/ Mitsubishi Corporation-Carboelectrica Diamante/ $611million
2. CC Power plant Mexicali II
Ref: 18164093-002-02/ Canceled
3. CC Power plant Tamazunchale
18164093-001-03/ 30.Jun.04/ Iberdrola Mexico/ IPP/ 25yrs/ 839-1135 MW
5. CC Power plant Tuxpan V
18164093-013-02/ 17.Dec.03/ Mitsubishi Corporation-Kyushu Electric Power Co/ IPP/ 25yrs/ 431-527 MW
7. CC Power plant Valladolid III
18164093-032-02/ 14.Oct.03/ Mitsui & Co Ltd/ IPP/ 25yrs/ 430-525 MW
8. CC Power plant Altamira V
18164093-001-02/ 22.Oct.03/ Iberdrola Mexico/ IPP/ 25yrs/ 975 MW
9. Hydroelectric El Cajon
18164093-011-02/ 14.Mar.03/ Constructora Internacional de Infraestructura: ICA-Promotora e Inversora Adisa-La Peninsular Compania Constructora-EnergomachExport Power Machine/ $749.5million/ $0.0685/Kw-h/ 2x375 MW

FOR REFERENCE DETAILED INFO ON THESE TENDERS IS POSTED IN THE NEXT PAGE


FEDERAL COMMISSION OF ELECTRICITY (CFE)

LNG PROJECTS
No major tenders currently
Coming shortly: 400 mcfd / 230 km / $600m+
San Luis Potosi / Guanajuato / Queretaro

FOR REFERENCE DETAILED INFO ON PREVIOUS TENDERS IS POSTED IN THE NEXT PAGE

__________________________________________________________________


ARAMONI Expert Services

1. REPORTING
Up-to-date tender information
• AramoniReport on line: www.aramoni.com
• Customized reporting based on clients’ information needs

2. OPPORTUNITY ALERT SUBSCRIPTION
We timely identify project opportunities for our clients
• Customized service based on client’s requirements
• Market leads
• RFP (timely)
• Basic project information
• Tender documents (in Spanish)

3. TENDER INTRODUCTION
We position our clients to apply for bid project opportunities
• Tender register procedure
• Collection & sending of bid documents
• Guide & support to complete the company's administrative, financial & legal bidding packages (optional)

4. TENDER COMPLIANCE
We secure our clients' bid proposals
• Tender documents review
• Bid proposal complete evaluation
• Omissions report, modifications statement & improvements advice
• Final review and revision

5. BID ASSISTANCE
Expert service to produce competitive compliant proposals
• Tender documentation review
• Administrative, financial & legal compliance
• Commissioner contract understanding
• Project insight
• Competitors assessment
• Strategy issues
• Technical/economic proposals
• Price bid offer

6. BUSINESS DEVELOPMENT
Consulting & assistance to accomplish corporate goals
• Market advice & research
• Opportunitie search & pursuit
• Networking
• Functional local support
• Representative services

Contact: info@aramoni.com
__________________________________________________________________


Next

 

OIL & GAS 
UTILITIES 
TRANSPORT 
Petroleum
Electricity
Airports
Natural Gas
Gas
Aviation
LPG
Water
Subway
Chemical
Wastewater
Light Rail
To be a factor in our clients' success in Mexico by providing comprehensive capabilities to achieve intelligence, insight, compliance and strategy to pursue potential projects.
International companies pursuing project opportunities in Mexico
• Resourceful project market research
• Extensive experience identifying/developing project opportunities
• Proficiency in structuring coordinating developing and
. submitting compliant project bid proposals
• Effective interaction between clients' interests
. projects' requirements and proposals' scopes
• Background in searching suitable local partnership
 
1. Corporate intelligence
2. Industry follow-up & opportunity alert
3. Bid proposal guidance & assistance
4. Representativeness
5. Functional local support
6. Business/project specific services: research advice & pursuit