| PROJECT
TRACKER (2
of 2)
ARCHIVE PEMEX EXPLORATION & PRODUCTION (PEP)
MARINE EXPLORATION & PRODUCTION JACKUP Tender History 2011
512. SEMISUBMERSIBLE / DRILLSHIP LEASE (part of lot 6) [AWARDED] Tender type: Open to any country
Contract: Term: 930 days starting 14.Nov.11 Location: Campeche basin GOM (SS C) Well: Ku-301 (Manik-301) (water depth 115m) Scope: Lease and integral maintenance Unit: Semisubmersible or drillingship for well drilling and termination Year delivered: 1990 and newer (or prior but modernized IACS certified) Class Certificate by ABS (or IACS): Maltese Cross A1M, Column-Stabilized Drilling Unit / A1 AMS, Drillship, MODU (SOLAS/74), Register, as well as PEP's permitt requirements Characteristics: cranes (2x35mt)/ diesel electrical/ heliport Water depth: +1000ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 70 for Pemex+Medical room+Contractor's Bid follow-up: Ref: 18575088-512-11 Release: 14.Apr.11 Register period: from release until prequalification deadline 1st clarification meeting: 25.Apr.11 2nd clarification meeting: 02.May.11 Register and prequalification deadline: 16.May.11 Precalification ruling: 27.May.11 Site visit: n/a 3rd clarification meeting: 30.May.11 4th clarification meeting: 03.Jun.11 5th clarification meeting: 08.Jun.11 6th clarification meeting: 13.Jun.11 7th clarification meeting: 15.Jun.11 Proposal submission & opening: 27.Jun.11 -Mexdrill Offshore: Ocean Yorktown $174,429,970 -Goimar: Zagreb 1 $218,909,969 (technically non compliant) -Bravo Land Drilling: Petrolia $143,749,000 (technically non compliant) Ruling: 11.Jul.11 Mexdrill Offshore: Ocean Yorktown $174,429,970 Status [AWARDED] Updated 22.Jul.11 515. JACKUP [RULED] Tender type: Restricted to countries with a trade agreement Scope: 4 Lease contracts with no purchase option
Contract-1: Term: 195 days (20.Jun.11-31.Dec.11) Location: Campeche basin GOM (A/E TG) Well: [ADO Maloob-B] 492B Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 1990 and newer (or prior but modernized and IACS certified) Class Certificate by ABS (or IACS): Maltese Cross A1, Self-Elevating Drilling Unit, MODU (SOLAS/74), Register, as well as PEP's permitt requirements Characteristics: Independed-leg/ cantilever drilling (+50ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +350ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 66 for Pemex+Medical room+Contractor´s needs Contract-2: Term: 179 days (06.Jul.11-31.Dec.11) Location: Campeche basin GOM (A/E BM) Well: [TET-Balam-TD] Balam-33 Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 1990 and newer (or prior but modernized and IACS certified) Class Certificate by ABS (or IACS): Maltese Cross A1, Self-Elevating Drilling Unit, MODU (SOLAS/74), Register, as well as PEP's permitt requirements Characteristics: Independed-leg/ cantilever drilling (+40ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 2000HP Beds: 45 for Pemex+Medical room+Contractor´s needs Contract-3: Term: 177 days (08.Jul.11-31.Dec.11) Location: Campeche basin GOM (A/E BT) Well: [TET-Balam-TA] Balam-23 Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 1990 and newer (or prior but modernized and IACS certified) Class Certificate by ABS (or IACS): Maltese Cross A1, Self-Elevating Drilling Unit, MODU (SOLAS/74), Register, as well as PEP's permitt requirements Characteristics: Independed-leg/ cantilever drilling (+40ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 2000HP Beds: 45 for Pemex+Medical room+Contractor´s needs Contract-4: Term: 175 days (10.Jul.11-31.Dec.11) Location: Campeche basin GOM (A/E EK) Well: [TET-Ek-TA] Ek-23 Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 1990 and newer (or prior but modernized and IACS certified) Class Certificate by ABS (or IACS): Maltese Cross A1, Self-Elevating Drilling Unit, MODU (SOLAS/74), Register, as well as PEP's permitt requirements Characteristics: Independed-leg/ cantilever drilling (+40ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 2000HP Beds: 66 for Pemex+Medical room+Contractor´s needs Bid follow-up: Ref: 18575088-515-11 Release: 19.Apr.11 Register period: from release until last clarification meeting Site visit: n/a 1st clarification meeting: 28.Apr.11 2nd clarification meeting: 04.May.11 3rd clarification meeting: 12.May.11 Register and prequalification deadline: n/a Precalification ruling: n/a Proposal submission & opening: 30.May.11 1.Noble Contracting: Noble Eddie Paul $22,259,764 2.Mexdrill Offshore: Ocean King $23,170,799 3.Mexdrill Offshore: Ocean Titan $19,124,801 4.Noble Contracting: Noble Sam Noble $18,274,783 Ruling: 09.Jun.11 1.Noble Contracting: Noble Eddie Paul $22,259,764 / $114,150 per day (including mo/demobilization and re-locations) 2.Non compliant proposal 3.Non compliant proposal 4.Noble Contracting: Noble Sam Noble $18,274,783 / $104,400 per day (including mo/demobilization and re-locations) Status [RULED] Updated 10.Jun.11 514. JACKUP (Lot 10) [RULED] Tender type: Open to any country Scope: 3 Lease contracts with no purchase option
Contract-1: Term: 778 days (15.Nov.11-31.Dec.13) Location: Campeche basin GOM (A/E AB) Well: [ADO-Zaap-A] Zaap-44 Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 1990 and newer (or prior but modernized and IACS certified) Class Certificate by ABS (or IACS): Maltese Cross A1, Self-Elevating Drilling Unit, MODU (SOLAS/74), Register, as well as PEP's permitt requirements Characteristics: Independed-leg/ cantilever drilling (+60ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +350ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 45 for Pemex+Medical room+Contractor´s needs Contract-2: Term: 1210 days (09.Sep.11-31.Dec.14) Location: Campeche basin GOM (A/E XIII) Well: [ELM-Yaxche-B] Yaxche-23 Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 1990 and newer (or prior but modernized and IACS certified) Class Certificate by ABS (or IACS): Maltese Cross A1, Self-Elevating Drilling Unit, MODU (SOLAS/74), Register, as well as PEP's permitt requirements Characteristics: Independed-leg/ cantilever drilling (+50ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 66 for Pemex+Medical room+Contractor´s needs Contract-3: Term: 389 days (01.Jan.12-23.Jan.13) Location: Campeche basin GOM (A/E XL) Well: [TET-Akal-TD] Sihil-15 Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 1990 and newer (or prior but modernized and IACS certified) Class Certificate by ABS (or IACS): Maltese Cross A1, Self-Elevating Drilling Unit, MODU (SOLAS/74), Register, as well as PEP's permitt requirements Characteristics: Independed-leg/ cantilever drilling (+60ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +350ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 66 for Pemex+Medical room+Contractor´s needs Bid follow-up: Ref: 18575088-514-11 Release: 14.Apr.11 Register period: from release until prequalification deadline 1st clarification meeting: 25.Apr.11 2nd clarification meeting: 02.May.11 Register and prequalification deadline: 16.May.11 Precalification ruling: 27.May.11 1.Cosl-Goimar 2.Industrial Perforadora de Campeche (IPC) 3.Perforadora Mexico-Subtec 4.Bravo Land Drilling 5.Firstdrill-ISO 6.Perforadora Central 7.Mexdrill 8.Atlantic-Geofisica 9.Ensco 10.Nobel 11.EPNP 12.Todco 13.KCA Deutag Caspian Ltd 14.Greatship Site visit: n/a 3rd clarification meeting: 30.May.11 4th clarification meeting: 03.Jun.11 5th clarification meeting: 08.Jun.11 6th clarification meeting: 14.Jun.11 (last) Proposal submission & opening: 05.Jul.11 1.Ensco Drilling Mexico: ENSCO 81 $85,383,038 1.Mexdrill Offshore: Ocean Titan $84,008,939 Ruling: 19.Jul.11 1.Mexdrill Offshore: Ocean Titan $84,008,939 2.Void (no proposals submitted) 3.Void (no proposals submitted) Status [RULED] Updated 22.Jul.11 513. JACKUP (Lot 7) [RULED] Tender type: Open to any country Scope: 4 Lease contracts with no purchase option
Contract-1: Term: 1078 days (19.Jan.12-31.Dec.14) Location: Campeche basin GOM (A/E LXXXVII) Well: [OCT Xux-B] Xux-12 Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 1990 and newer (or prior but modernized and IACS certified) Class Certificate by ABS (or IACS): Maltese Cross A1, Self-Elevating Drilling Unit, MODU (SOLAS/74), Register, as well as PEP's permitt requirements Characteristics: Independed-leg/ cantilever drilling (+70ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +350ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 66 for Pemex+Medical room+Contractor´s needs Contract-2: Term: 1149 days (10.Aug.11-01.Oct.14) Location: Campeche basin GOM (A/E I) Well: Xux-1DL Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 1990 and newer (or prior but modernized and IACS certified) Class Certificate by ABS (or IACS): Maltese Cross A1, Self-Elevating Drilling Unit, MODU (SOLAS/74), Register, as well as PEP's permitt requirements Characteristics: Independed-leg/ cantilever drilling (+50ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 66 for Pemex+Medical room+Contractor´s needs Contract-3: Term: 863 days (22.Aug.11-31.Dec.13) Location: Campeche basin GOM (A/E TMA) Well: [TET-Akal-TMA] Cantarell-3037H Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 1990 and newer (or prior but modernized and IACS certified) Class Certificate by ABS (or IACS): Maltese Cross A1, Self-Elevating Drilling Unit, MODU (SOLAS/74), Register, as well as PEP's permitt requirements Characteristics: Independed-leg/ cantilever drilling (+50ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 45 for Pemex+Medical room+Contractor´s needs Contract-4: Term: 1248 days (02.Aug.11-31.Dec.14) Location: Campeche basin GOM (A/E HT) Well: [TET-Akal-TH] Cantarell-2100 Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 1990 and newer (or prior but modernized and IACS certified) Class Certificate by ABS (or IACS): Maltese Cross A1, Self-Elevating Drilling Unit, MODU (SOLAS/74), Register, as well as PEP's permitt requirements Characteristics: Independed-leg/ cantilever drilling (+50ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 45 for Pemex+Medical room+Contractor´s needs Bid follow-up: Ref: 18575088-513-11 Release: 14.Apr.11 Register period: from release until prequalification deadline 1st clarification meeting: 25.Apr.11 2nd clarification meeting: 02.May.11 Register and prequalification deadline: 16.May.11 Precalification ruling: 27.May.11 1.Cosl-Goimar 2.Industrial Perforadora de Campeche (IPC) 3.Perforadora Mexico-Subtec 4.Bravo Land Drilling 5.Firstdrill-ISO 6.Perforadora Central 7.Mexdrill 8.Ensco 9.Nobel 10.EPNP 11.Todco 12.KCA Deutag Caspian Ltd 13.Greatship Site visit: n/a 3rd clarification meeting: 30.May.11 4th clarification meeting: 06.Jun.11 5th clarification meeting: 10.Jun.11 6th clarification meeting: 16.Jun.11 Proposal submission & opening: 01.Jul.11 1.Perforadora Central: Panuco $108,367,060 2.Void: No proposals submitted 3.Mexdrill Offshore: Ocean King $78,389,159 4.Mexdrill Offshore: Ocean King $106,240,797 Ruling: 15.Jul.11 1.Perforadora Central: Panuco $108,367,060 2.Void: No proposals submitted 3.Void: technically non compliant proposal 4.Void: technically non compliant proposal Status [RULED] Updated 22.Jul.11 512. JACKUP (part of lot 6) [RULED] Tender type: Open to any country Scope: 2 Lease contracts with no purchase option
Contract-1: Term: 1434 days (28.Jan.12-31.Dec.15) Location: Campeche basin GOM (A/E XXVII) Well: [SH III - May C] May-37 Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 2000 and newer Class Certificate by ABS (or IACS): Maltese Cross A1, Self-Elevating Drilling Unit, MODU (SOLAS/74), Register, as well as PEP's permitt requirements Characteristics: Independed-leg/ cantilever drilling (+50ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 66 for Pemex+Medical room+Contractor´s needs Contract-2: Term: 1242 days (05.Aug.11-28.Dec.14) Location: Campeche basin GOM (A/E XVIII) Well: [OCT-Tsimin-A AD] Tsimin-12 Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 2000 and newer Class Certificate by ABS (or IACS): Maltese Cross A1, Self-Elevating Drilling Unit, MODU (SOLAS/74), Register, as well as PEP's permitt requirements Characteristics: Independed-leg/ cantilever drilling (+50ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 66 for Pemex+Medical room+Contractor´s needs Bid follow-up: Ref: 18575088-512-11 Release: 14.Apr.11 Register period: from release until prequalification deadline 1st clarification meeting: 25.Apr.11 2nd clarification meeting: 02.May.11 Register and prequalification deadline: 16.May.11 Precalification ruling: 27.May.11 Site visit: n/a 3rd clarification meeting: 30.May.11 4th clarification meeting: 03.Jun.11 5th clarification meeting: 08.Jun.11 6th clarification meeting: 13.Jun.11 7th clarification meeting: 15.Jun.11 Proposal submission & opening: 27.Jun.11 1.Cosl Mexico-Goimar: Hai Yang Shi You 936 $186,464,878 (economically non compliant) 1.Perforadora Mexico-Subtec: Hull 108 $190,673,878 (technically non compliant) 1.Bravo Land Drilling: Super M2 Hull 209 $150,710,475 (technically non compliant) 2.Void: No proposals submitted Ruling: 11.Jul.11 1.Void: Non compliant proposals 2.Void: No proposals submitted Status [VOID] Updated 22.Jul.11 509. JACKUP [AWARDED] Tender type: Restricted to countries with a trade agreement Scope: 2 Lease contracts with no purchase option
Contract-1: Term: 759 days (01.Oct.11-28.Oct.13) Location: Campeche basin GOM (A/E XIV) Well: [TPD-Chuc-1] Chuc-1B Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 1990 and newer (or prior but modernized and IACS certified) Class Certificate by ABS (or IACS): Maltese Cross A1, Self-Elevating Drilling Unit, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+50ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 66 for Pemex+Medical room+Contractor´s needs Contract-2: Term: 985 days (23.Feb.12-03.Nov.14) Location: Campeche basin GOM (A/E XCI) Well: Kax-201 Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 1990 and newer (or prior but modernized and IACS certified) Class Certificate by ABS (or IACS): Maltese Cross A1, Self-Elevating Drilling Unit, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+50ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 45 for Pemex+Medical room+Contractor´s needs Bid follow-up: Ref: 18575088-509-11 Release: 29.Mar.11 Register period: from release until prequalification deadline 1st clarification meeting: 07.Apr.11 2nd clarification meeting: 14.Apr.11 Register and prequalification deadline: 29.Apr.11 1.Todco 2.Cosl-Goimar 3.KCA Deutag 4.Perforadora Mexico-Subtec 5.Geofisica Marina de Exploracion-Atlantic Marine Services 6.Ensco 7.Noble 8.ISO-Firsdrill 9.Mexdrill 10.KCA Deutag Caspian 11.EPNP 12.Perforadora Central Precalification ruling 12.May.11: All compliant Site visit: n/a 3rd clarification meeting: 20.May.11 4th clarification meeting: 26.May.11 5th clarification meeting: 31.May.11 6th clarification meeting: 01.Jun.11 Proposal submission & opening: 14.Jun.11 1.KCA Deutag Caspian: Ben Loyal $66,593,139.00 2.Mexdrill Offshore: Ocean Summit $86,528,936.00 Ruling: 28.Jun.11 1.KCA Deutag Caspian: Ben Loyal $66,593,139.00 2.Mexdrill Offshore: Ocean Summit $86,528,936.00 Status [AWARDED] Updated 22.Jul.11 506. JACKUP [RULED] Tender type: Restricted to countries with a trade agreement Scope: 2 Lease contracts with no purchase option
Contract-1: Term: 486 days starting 30.Aug.12 Location: Campeche basin GOM (A/E H) Well: [TET-Akal-TTJ] Sihil-23 Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 2000 and newer Certifications: IACS, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+70ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +350ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 45 for Pemex+Medical room+Contractor´s needs Contract-2: Term: 574 days (07.Jun.11-31.Dec.12) Location: Campeche basin GOM (A/E S) Well: [TET-Akal-TQA] Cantarell-1090 Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 2000 and newer Certifications: IACS, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+50ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 45 for Pemex+Medical room+Contractor´s needs Bid follow-up: Ref: 18575088-506-11 Release: 17.Feb.11 Register period: from release until prequalification deadline 1st clarification meeting: 25.Feb.11 2nd clarification meeting: 03.Mar.11 Register and prequalification deadline: 22.Mar.11 1.Aurora-Alpha 2.Grup Servicii Petroliere 3.Firstdrill-ISO 4.Cosl-Goimar 5.Perforadora Central 6.Vantage 7.Mexdrill 8.Atlantic-Geofisica 9.Bravo Land Drilling 10.Perforadora Mexico-Subtec 11.EPNP 12.AP Moller-Maersk Precalification ruling 01.Apr.11: All compliant Site visit: n/a 3rd clarification meeting 07.Apr.11 4th clarification meeting 14.Apr.11 5th clarification meeting 19.Apr.11 (last) Proposal submission & opening: 04.May.11 1.Cosl-Goimar: COSL Confidence $72,601,492 2.Firstdrill-ISO: HULL-108 $82,215,650 Ruling: 12.May.11 1.Cosl-Goimar: COSL Confidence $72,601,492 / $149,400 per day (including mobilization and re-locations) 2.VOID (non compliant proposal) Status [RULED] Updated 14.May.11 JACKUP [RULED] Scope: 3 Lease contracts with no purchase option
Contract-1: Term: 590 days (22.May.11-31.Dec.12) Location: Campeche basin GOM Well: Kutz-1247 (TET-Kutz-TA) Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 2000 and newer Certifications: IACS, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+50ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: 49meter Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 66 for Pemex+Medical room+Contractor´s needs Contract-2: Term: 430 days (08.Ago.11-10.Oct.12) Location: Campeche basin GOM Well: Cantarell-3093 (TET-Akal-TTM) Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 2000 and newer Certifications: IACS, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+50ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: 49meter Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 66 for Pemex+Medical room+Contractor´s needs Contract-3: Term: 253 days (23.Apr.11-31.Dec.11) Location: Campeche basin GOM (A/E T) Well: Kax-1 (SP-Kax-1) Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 2000 and newer Certifications: IACS, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+50ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: 49meter Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 66 for Pemex+Medical room+Contractor´s needs Contractor's personnel for each contract: Representative Maintenance chief Mechanical supervisor Electrical supervisor Crane operators (2) and assistants (2) Welder specialist Motorman Ship protecction official (ISPS) (Mexican) Safety & health supervisor Environmental supervisor Jackup and equipment operation staff (4+ ATP) Drilling inspectors (tool pusher) (2) Drilling operators (2), seconds (2) and assistants (2) Contract administrator (based in Ciudad del Carmen) Bid follow-up: Ref: 18575088-509-10 Release: 30.Dec.10 Register period: from release until prequalification deadline 1st clarification meeting: 20.Jan.11 2nd clarification meeting: 28.Jan.11 Register and prequalification deadline: 10.Feb.11 Todco, Bravo Land Drilling, Noble, Ensco Drilling, Atlantic Marine Services-Geomarex, Mexdrill Offshore, ISO-Firstdrill Ltd, Perforadora Central, Pride Foramer, Goimar, AP Moller-Maerks Precalification ruling: 03.Mar.11 All compliant except Bravo Land Drilling 3rd clarification meeting: 07.Mar.11 4th clarification meeting: 10.Mar.11 5th clarification meeting: 15.Mar.11 (last) Site visit: n/a Proposal submission & opening: 30.Mar.11 1.Noble, Noble Johnnie Hoffman, $53,098,590 2.Mexdrill, Ocean Nugget, $38,669,550 3.No proposal submitted Ruling: 08.Apr.11 1.Noble, Noble Johnnie Hoffman, $51,207,388 / $86,800 per day (including mobilization and re-locations) 2.Mexdrill, Ocean Nugget, $38,669,550 / $89,900 per day (including mobilization and re-locations) 3.Void, no proposal submitted Status [RULED] Updated 08.Apr.11 JACKUP [RULED] Scope: 4 Lease contracts with no purchase option
Contract-1: Term: 289 days (18.Mar.11-31.Dec.11) Location: Campeche basin GOM (A/E XVII) Well: Kimbe-1 Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: n/a Certifications: IACS, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+45ft)/ cranes (2x30mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 2000HP Beds: 35 for Pemex+Medical room+Contractor´s needs Contract-2: Term: 248 days (28.Apr.11-31.Dec.11) Location: Campeche basin GOM (A/E XXVI) Well: May-5 (ELM May-DL1) Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: n/a Certifications: IACS, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+45ft)/ cranes (2x30mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 2000HP Beds: 60 for Pemex+Medical room+Contractor´s needs Contract-3: Term: 121 days (01.Apr.11-30.Jul.11) Location: Campeche basin (A/E XLI) Well: Yaxché-4 (OCT Yaxché-A AD) Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: n/a Certifications: IACS, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+45ft)/ cranes (2x30mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 2000HP Beds: 60 for Pemex+Medical room+Contractor´s needs Contract-4: Term: 139 days (14.Apr.11-30.Aug.11) Location: Campeche basin Well: Sinan-101A (SP-Sinan-101) Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: n/a Certifications: IACS, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+40ft)/ cranes (2x30mt)/ diesel electrical/ heliport Water depth: +250ft Airgap: 92ft Drilling depth: +20000ft Drawworks: 2000HP Beds: 60 for Pemex+Medical room+Contractor´s needs Bid follow-up: Ref: 18575088-504-11 Release: 01.Feb.11 Register period: from release until last clarification meeting 1.KCA Deutag Offshore 2.Ensco Drilling 3.Rowandrill 4.Mexdrill Offshore 5.Noble 6.Perforadora Central 7.Goimar Prequalification: n/a 1st clarification meeting: 08.Feb.11 2nd clarification meeting: 14.Feb.11 3rd clarification meeting: 16.Feb.11 (last) Site visit: n/a Proposal submission & opening: 01.Mar.11 1.Mexdrill Offshore, Ocean Summit, $26,845,690 2.Noble, Gene Rosser, $23,767,750 3.VOID (no proposal submitted) 4.Noble, Earl Frederickson, $11,661,859 Ruling: 09.Mar.11 1.Mexdrill Offshore, Ocean Summit, $26,845,690 / $92,900 per day (including mobilization and re-locations) 2.Noble, Gene Rosser, $23,767,750 / $95,850 per day (including mobilization and re-locations) 3.VOID (no proposal submitted) 4.Noble, Earl Frederickson, $11,661,859 / $83,900 per day (including mobilization and re-locations) Status [RULED] Updated 18.Mar.11 JACKUP [AWARDED] Scope: 3 Lease contracts with no purchase option
Contract-1: Term: 272 days (19.Mar.11-15.Dec.11) Location: Campeche basin GOM (A/E LXXXVII) Well: Sinan-16 (OCT Sinan-A) Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: n/a Certifications: IACS, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+65ft)/ cranes (2x30mt)/ diesel electrical/ heliport Water depth: +350ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 60 for Pemex+Medical room+Contractor´s needs Contract-2: Term: 286 days (21.Mar.11-31.Dec.11) Location: Campeche basin GOM (A/E XX) Well: Uech-62 (TTPD Uech-TB) Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: n/a Certifications: IACS, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+65ft)/ cranes (2x30mt)/ diesel electrical/ heliport Water depth: +350ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 60 for Pemex+Medical room+Contractor´s needs Contract-3: Term: 286 days (20.Mar.11-30.Dec.11) Location: Campeche basin (A/E XXVII) Well: May-53 (SHIII May-C) Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: n/a Certifications: IACS, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+47ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +250ft Airgap: 92ft Drilling depth: +20000ft Drawworks: 2000HP Beds: 66 for Pemex+Medical room+Contractor´s needs Bid follow-up: Ref: 18575088-503-11 Release: 01.Feb.11 Register period: from release until last clarification meeting 1.Cosl 2.Ensco Drilling 3.Perforadora Mexico 4.Blake 5.Goimar 6.Noble 7.Perforadora Central Prequalification: n/a 1st clarification meeting: 08.Feb.11 2nd clarification meeting: 14.Feb.11 3rd clarification meeting: 16.Feb.11 4th clarification meeting: 17.Feb.11 (last) Site visit: n/a Proposal submission & opening: 01.Mar.11 1.Noble, Noble Leonard Jones, $29,806,727 2.Noble, Noble Bill Jennings, $32,813,712 3.Perforadora Mexico, Sonora, $18,836,570 Ruling: 09.Mar.11 1.Noble, Noble Leonard Jones, $29,806,727 / $109,600 per day (including mobilization and re-locations) 2.Noble, Noble Bill Jennings, $32,813,712 / $114,750 per day (including mobilization and re-locations) 3.Perforadora Mexico, Sonora, $18,836,570 / $65,850 per day (including mobilization and re-locations) Status [AWARDED] Updated 18.Mar.11 JACKUP [AWARDED] Scope: 4 Lease contracts with no purchase option
Contract-1: Term: 624 days (18.Apr.11-31.Dec.12) Location: Campeche basin GOM (A/E XI) Well: Kab-101 (ELM-Kab-B) Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 1990 and newer Certifications: IACS, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+45ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 66 for Pemex+Medical room+Contractor´s needs Contract-2: Term: 566 days (15.Jun.11-31.Dec.12) Location: Campeche basin GOM (A/E TGP) Well: Cantarell-491H (TET-Akal-TGP) Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 1990 and newer Certifications: IACS, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+45ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 66 for Pemex+Medical room+Contractor´s needs Contract-3: Term: 588 days (27.Apr.11-04.Dec.12) Location: Campeche basin GOM (A/E T) Well: Cantarell-3094H (TET-Akal-TKL) Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 1990 and newer Certifications: IACS, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+50ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 66 for Pemex+Medical room+Contractor´s needs Contract-4: Term: 611 days (01.May.11-31.Dec.12) Location: Campeche basin GOM (A/E DT) Well: Cantarell-118 (TET-Akal-TI) Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 1990 and newer Certifications: IACS, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+45ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 66 for Pemex+Medical room+Contractor´s needs Contractor's personnel for each contract: Representative Maintenance chief Mechanical supervisor Electrical supervisor Crane operators (2) and assistants (2) Welder specialist Motorman Ship protecction official (ISPS) (Mexican) Safety & health supervisor Environmental supervisor Jackup and equipment operation staff (4+ ATP) Drilling inspectors (tool pusher) (2) Drilling operators (2), seconds (2) and assistants (2) Contract administrator (based in Ciudad del Carmen) Bid follow-up: Ref: 18575088-507-10 Release: 30.Nov.10 Register period: from release until prequalification deadline 1st clarification meeting: 10.Dec.10 2nd clarification meeting: 16.Dec.10 Register and prequalification deadline: 29.Dec.10 1.Perforadora Central 2.KCA Deutag Offshore 3.Mexdrill Offshore 4.Todco 5.ISO-Firstdrill 6.Ensco 7.Perforadora Mexico-Subtec 8.Goimar 9.Noble 10.Pride Foramer 11.Perforaciones y Servicios Central 12.Grup Servicii Petroliere (GSP) Prequalification ruling: 10.Jan.11 All compliant but 11.Perforaciones y Servicios Central 3rd clarification meeting: 12.Jan.11 4th clarification meeting: 17.Jan.11 5th clarification meeting: 21.Jan.11 6th clarification meeting: 26.Jan.11 7th clarification meeting: 27.Jan.11 (last) Proposal submission & opening: 21.Feb.11 1.Noble, Noble John Sandifer, $54,861,152 2.Mexdrill, Ocean King, $61,246,723 (non compliant) 2.Grup Servicii Petroliere (GSP), CSP Atlas, $59,457,315 3.Noble, Noble Lewis Dugger, $53,098,590 4.Mexdrill, Ocean Titan, $61,747,478 (non compliant) 4.Grup Servicii Petroliere (GSP), CSP Orizont, $62,654,597 Ruling: 10.Mar.11 1.Noble, Noble John Sandifer, $54,610,955 / $87,500 per day (including mobilization and re-locations) 2.Grup Servicii Petroliere (GSP), CSP Atlas, $57,858,674 / $102,200 per day (including mobilization and re-locations) 3.Noble, Noble Lewis Dugger, $53,098,590 / $90,300 per day (including mobilization and re-locations) 4.Grup Servicii Petroliere (GSP), CSP Orizont, $61,644,929 / $100,900 per day (including mobilization and re-locations) Status [AWARDED] Updated 11.Mar.11 JACKUP [AWARDED] Scope 3 Lease contracts with no purchase option
Contract-1: Term: 730 days (30.May.11-28.May.13) Location: Campeche basin GOM (A/E N) Well: Ku-87 (TET-Ku-TI) Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 2000 and newer Certifications: IACS, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+50ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +350ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 66 for Pemex+Medical room+Contractor´s needs Contract-2: Term: 794 days (15.Ago.11-16.Oct.13) Location: Campeche basin GOM (A/E XLI) Well: Yaxche-4 (OCT-Yaxche-AAD) Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 2000 and newer Certifications: IACS, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+50ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 66 for Pemex+Medical room+Contractor´s needs Contract-3: Term: 705 days (14.Mar.11-15.Feb.13) Location: Campeche basin GOM (A/E TR) Well: Cantarell-2062H (TET-Akal-TR) Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 2000 and newer Certifications: IACS, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+50ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 66 for Pemex+Medical room+Contractor´s needs Contractor's personnel for contracts 1, 2 & 3: Representative Maintenance chief Mechanical supervisor Electrical supervisor Crane operators (2) and assistants (2) Welder specialist Motorman Ship protecction official (ISPS) (Mexican) Safety & health supervisor Environmental supervisor Jackup and equipment operation staff (4+ ATP) Drilling inspectors (tool pusher) (2) Drilling operators (2), seconds (2) and assistants (2) Contract administrator (based in Ciudad del Carmen) Bid follow-up: Ref: 18575088-506-10 Release: 26.Oct.10 Register period: from release until prequalification deadline 1st clarification meeting: 10.Nov.10 2nd clarification meeting: 17.Nov.10 Register and prequalification deadline: 30.Nov.10 Prequalification ruling: 09.Dec.10 1.Todco 2.Atlantic Marine Services 3.Goimar 4.Noble 5.Seadrill Offshore 6.Perforadora Central 7.ISO-Firstdrill 8.Mexdrill Offshore 9.Ensco Drilling 10.AP Moller-Maerks Site visit: 10.Dec.10 3rd clarification meeting: 13.Dec.10 4th clarification meeting: 17.Dec.10 5th clarification meeting: 21.Dec.10 6th clarification meeting: 28.Dec.10 7th clarification meeting: 04.Jan.11 (last) Proposal submission & opening: 18.Jan.11 Ruling: 14.Feb.11 Status [AWARDED] Industrial de Servicios & Outsourcing (ISO)-Firstdrill Ltd 1.Hull V351: $98,997,830 / $136,600 per day (including mobilization and re-locations) 2.Hull 106: $90,466,190 / $113,940 per day (including mobilization and re-locations) 3.Hull 110: $81,397,980 / $115,460 per day (including mobilization and re-locations) Updated 18.Feb.11 JACKUP Tender History 2010
JACKUP [VOID] Scope Contract-1: Lease with no purchase option Term: 662 days (20 Jan 2011 to 11 Nov 2012) Location: Campeche basin GOM (A/E H) Well: Cantarell-1090 (TET-Akal-TQA) Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 2000 and newer Certifications: IACS, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+50ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +300ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 45 for Pemex+Medical room+Contractor´s needs Contractor's personnel: Representative Maintenance chief Mechanical supervisor Electrical supervisor Crane operators (2) and assistants (2) Welder specialist Motorman Ship protecction official (ISPS) (Mexican) Safety & health supervisor Environmental supervisor Jackup and equipment operation staff (4+) (ATP) Drilling inspectors (tool pusher) (2) Drilling operators (2), seconds (2) and assistants (2) Rotary dirilling operators (6) Drilling general assistants (8) Contract administrator (based in Ciudad del Carmen) Bid follow-up: Ref: 18575088-503-10 Release: 28.Sep.10 Register period: from release until prequalification deadline 1st clarification meeting: 11.Oct.10 2nd clarification meeting: 18.Oct.10 Register and prequalification deadline: 27.Oct.10 Prequalification ruling: 12.Nov.10 1.TODCO 2.ISO-Firstdrilling Ltd 3.Noble 4.Perforadora Central 5.ENSCO 6.Perforadora Mexico 3rd clarification meeting: 18.Nov.10 4th clarification meeting: 19.Nov.10 5th clarification meeting: 22.Nov.10 6th clarification meeting: 23.Nov.10 7th clarification meeting: 24.Nov.10 (last) Proposal submission & opening: 06.Dec.10 One proposal submitted: 1.Industrial de Servicios & Outsourcing (ISO) - Firstdrill Ltd Proposed unit: Hull 110 Lease contract: $85,119,300 Rent: $128,579/day Ruling: 14.Dec.10 Proposal submitted ruled non-compliant Tender item declared nul Status [VOID] Updated 17.Dec.10 JACKUP [VOID] Scope Contract-1: Lease with no purchase option Term: 486d (07.Jan.11-06.May.12) Location: Campeche basin GOM (A/E H) Well: (TET-Akal-TTJ) Sihil-23 Scope: Lease and integral maintenance Unit: Jackup for well drilling/ termination/ reparation Year delivered: 2000 and newer Certifications: IACS, MODU, Register Characteristics: Independed-leg/ cantilever drilling (+70ft)/ cranes (2x35mt)/ diesel electrical/ heliport Water depth: +350ft Airgap: 92ft Drilling depth: +25000ft Drawworks: 3000HP Beds: 45 for Pemex + Contractor´s needs Contractor's personnel: Representative Maintenance chief Mechanical supervisor Electrical supervisor Crane operators (2) and assistants (2) Welder specialist Motor operator Ship protecction official (ISPS) (Mexican) Safety & health supervisor Environmental supervisor Jackup and equipment operatition staff (4+) (ATP) Drilling inspectors (tool pusher) (2) Drilling operators (2), seconds (2) and assistants (2) Rotary dirilling operators (6) Drilling general assistants (8) Contract administrator (based in Ciudad del Carmen) Bid follow-up: Ref: 18575088-502-10 Release: 17.Aug.10 Register period: from release until prequalification deadline PREQUALIFICATION 1st clarification meeting: 02.Sep.10 2nd clarification meeting: 07.Sep.10 Register and prequalification deadline: 29.Sep.10 Applications: 1.Perforadora Central 2.Goimar 3.Ensco Drilling 4.Pride Foramer SAS 5.Aurora Offshore Services GMBH 6.Todco 7.Noble Contracting 8.Atlantic Marine Services 9.Perforadora Mexico-Subtec 10.Mexdrill Offshore Prequalification ruling: 08.Oct.10 All applicants complied but Aurora Offshore Services GMBH TENDERING 3rd clarification meeting: 13.Oct.10 4th clarification meeting: 19.Oct.10 (last) Proposal submission & technical opening: 16.Nov.10 Ruling: 16.Nov.10 NO proposals submitted Tender declared nul A new RFP should be released shortly Status [VOID] Updated 19.Nov.10 North Division [AWARDED] Contract: Lease with no purchase option Term: 1039d (29.Jun.10-02.May.13) Location: GOM Well: Bagre 130 C Unit: Independed-leg/ cantilever drilling/ diesel electrical Water depth: +300ft Airgap: 92ft Drilling depth: +25 000ft Drawworks: 3000HP Bid follow-up Ref: 18575088-004-10 Release: 12.Mar.10 (Compranet) 1st Clarification meeting: 25.Mar.10 2nd Clarification meeting: 06.Apr.10 3rd Clarification meeting: 14.Apr.10 4th Clarification meeting: 19.Apr.10 5th Clarification meeting: 19.Apr.10 6th Clarification meeting: 22.Apr.10 7th Clarification meeting: 23.Apr.10 Proposal submission & opening: 30.Apr.10 Ruling: 20.May.10 Registered bidders 1.Blake Platform Rigs 2.Perforadora Central 3.Pride Foramer 4.KCA Deutag Offshore As 5.Goimar 6.Mexdrill Offshore 7.Noble Contracting 8.COSL 9.TODCO 10.Ensco Drilling 11.Perforadora Mexico 12.Nabors 13.Iner Servicios 14.Saipem 15.ISOMEX-Fristdrill Ltd 16.Rowandrill 17.Globalsantafe Operations 18.Geomarex 19.Logistica de Perforacion Submitted proposals 1.ISOMEX-Fristdrill Ltd: Deep Driller 6 $124.12million ($119 460 per day) 2.Geomarex: Naga 2 $126.41million ($121 660 per day) 3.Perforadora Central-Central Panuco: Tuxpan $131.42million ($126 490 per day) 4.COSL-Goimar: Hai Yang Shi You 937 $144.02million ($138 610 per day) Status [AWARDED] ISOMEX-Fristdrill Ltd: Deep Driller 6 $124.12million ($119 460 per day) Updated 20.May.10 Marine Division [AWARDED] Scope 4 Lease contracts with no purchase option Contract 1 Term: 465d (10.Jun.10-17.Sep.11) Location: Campeche basin Well: TET-Akal-TMA (Cantarell-3039H) Unit: Independed-leg/ cantilever drilling/ diesel electrical Water depth: 49 meters Airgap: 92ft Drilling depth: +25 000ft Drawworks: 3000HP Contract 2 Term: 256d (13.Jun.10-23.Feb.11) Location: Campeche basin Well: Bolontiku-501 Unit: Independed-leg/ cantilever drilling/ diesel electrical Water depth: 30 meters Airgap: 92ft Drilling depth: +25 000ft Drawworks: 3000HP Contract 3 Term: 254d (28.Jul.10-07.Apr.11) Location: Campeche basin Well: Tsimin-1-DL Unit: Independed-leg/ cantilever drilling/ diesel electrical Water depth: 30 meters Airgap: 92ft Drilling depth: +20 500ft Drawworks: 2000HP Contract 4 Term: 292d (29.Sep.10-17.Jul.11) Location: Campeche basin Well: TET-Akal-TE (Sihil-12) Unit: Independed-leg/ cantilever drilling/ diesel electrical Water depth: 46 meters Airgap: 92ft Drilling depth: +25 000ft Drawworks: 3000HP Bid follow-up Ref: 18575088-003-10 Release: 09.Mar.10 (Compranet) Site visit: n/a 1st Clarification meeting: 25.Mar.10 2nd Clarification meeting: 05.Apr.10 3rd Clarification meeting: 07.Apr.10 4th Clarification meeting: 12.Apr.10 5th Clarification meeting: 16.Apr.10 6th Clarification meeting: 20.Apr.10 7th Clarification meeting: 26.Apr.10 Proposal submission & opening: 26.May.10 Ruling: 05.Jul.10 Registered bidders 1.KCA Deutag Offshore As 2.Noble Contracting 3.COSL 4.Pride Foramer SAS 5.Servicios Integrales GSM (Carso) 6.TODCO 7.Saipem 8.Nabors 9.Mexdrill 10.Perforadora Central 11.Goimar 12.Ensco Drilling 13.Perforadora Mexico 14.ISOMEX 15.Iner Servicios 16.Globalsantafe Operations 17.CICSA (Carso) 18.Rowandrill Inc 19.Logistica de Perforacion 20.Geomarex 21.Seahawk Drilling Potential participants Corpores, Scorpion Offshore Proposals submitted Contract 1 Perforadora Central: Tuxpan $44.16m ($94 975 per day ) Geomarex-Atlantic Marine Services: Ks Endeavor $51.61m ($110 990 per day) ISOMEX-Fristdrill Ltd: Deep Driller 8 $56.00m ($120 450 per day) Contract 2 Perforadora Central: Panuco $28.54m ($111 470 per day) ISOMEX-Fristdrill Ltd: Deep Driller 8 $33.00m ($128 985 per day) Geomarex-Atlantic Marine Services: Naga 2 $36.17m ($141 295 per day) Contract 3 Noble Contracting: Noble Roy Butler $18.63m ($73 350 per day) Perforadora Mexico: $21.94m ($86 375 per day) ISOMEX-Fristdrill Ltd: Aban VII $24.88m ($97 970 per day) Contract 4 Perforadora Central: Tonala $32.35m ($110 795 per day) ISOMEX-Fristdrill Ltd: Deep Driller 8 $36.98m ($126 645 per day) Geomarex-Atlantic Marine Services: Naga 2 $40.20m ($137 685 per day) Status [AWARDED] Contract 1 Perforadora Central: Tuxpan $44.16m ($94 975 per day ) Contract 2 Perforadora Central: Panuco $28.54m ($111 470 per day) Contract 3 Noble Contracting: Noble Roy Butler $18.63m ($73 350 per day) Contract 4 Perforadora Central: Tonala $32.35m ($110 795 per day) Updated 09.Jul.10 _______________________________
DRILLING PACKAGE Tender History 2011
DRILLING PACKAGES Current tenders
517. DRILLING PACKAGES (Lot 18) [RULED] Tender type: Restricted to countries with a trade agreement Scope: 3 Lease (including integral maintenance) contracts with no purchase option Contract-1: Term: 1030 days (11.Jan.13-06.Nov.15) Location: Campeche basin GOM (XIV) Platform: 8-legged Tsimin-A Well: Tsimin-31 Scope: Lease and integral maintenance Unit: Diesel electrical Water depth: Airgap: Drilling depth: +25000ft Drawworks: 3000HP Minimal storage capacities: -bulk barite 3000 cubic ft -bulk cement 3000 cubic ft -fuel 660 bbls -potable water 630 bbls -drilling water 630 bbls -mud (all) 1500 bbls -sacks (50kg/90lb) 2000 Beds: 100 (70 for PEP+30 for Contractor+Medical room) Contract-2: Term: 965 days (01.Sep.12-23.Apr.15) Location: Campeche basin GOM (XV) Platform: 8-legged Tsimin-B Well: Tsimin-22 Scope: Lease and integral maintenance Unit: Diesel electrical Water depth: Airgap: Drilling depth: +25000ft Drawworks: 3000HP Minimal storage capacities: -bulk barite 3000 cubic ft -bulk cement 3000 cubic ft -fuel 660 bbls -potable water 630 bbls -drilling water 630 bbls -mud (all) 1500 bbls -sacks (50kg/90lb) 2000 Beds: 100 (70 for PEP+30 for Contractor+Medical room) Contract-3: Term: 1021 days (16.Mar.12-31.Dec.14) Location: Campeche basin GOM (D) Platform: 8-legged Akal-B Well: Cantarell-3085 Scope: Lease and integral maintenance Unit: Diesel electrical Water depth: Airgap: Drilling depth: +20000ft Drawworks: 2000HP Minimal storage capacities: -bulk barite 3000 cubic ft -bulk cement 3000 cubic ft -fuel 660 bbls -potable water 630 bbls -drilling water 630 bbls -mud (all) 1500 bbls -sacks (50kg/90lb) 2000 Beds: 100 (70 for PEP+30 for Contractor+Medical room) Bid follow-up: Ref: 18575088-517-11 Release: 26.May.11 Register period: from release until prequalification deadline 1st clarification meeting: 07.Jun.11 2nd clarification meeting: 09.Jun.11 Register and prequalification deadline: 15.Jun.11 Precalification ruling: 24.Jun.11 Site visit: 28.Jun.11 3rd clarification meeting: 30.Jun.11 7th clarification meeting: 20.Jul.11 8th clarification meeting: 28.Jul.11 (last) Proposal submission & opening: 12.Aug.11 3.Nabors: $56,536,976 Ruling: 29.Aug.11 1.Void no proposal submitted 2.Void no proposal submitted 3.Nabors: Mase 803 $56,536,976 / $55,400 per day including mo/demobilization) Status [RULED] Updated 29.Aug.11 515. DRILLING PACKAGE [AWARDED] Tender type: Open to any country Scope: 1 Lease contract with no purchase option
Contract-1: Term: 391 days (03.Oct.11-27.Oct.12) Location: Campeche basin GOM (XVI) Platform: 8-legged Chuc-A Well: Chuc-4 Scope: Lease and integral maintenance Unit: Diesel electrical Water depth: Airgap: Drilling depth: +20000ft Drawworks: 2000HP Beds: 100 (72 for PEP+28 for Contractor+Medical room) Bid follow-up: Ref: 18575088-515-11 Release: 19.Apr.11 Register period: from release until last clarification meeting Site visit: 27.Apr.11 1st clarification meeting: 28.Apr.11 2nd clarification meeting: 04.May.11 3rd clarification meeting: 12.May.11 Register and prequalification deadline: n/a Precalification ruling: n/a Proposal submission & opening: 30.May.11 1.Blake International USA Rigs: RIG-5 $24,693,607 Ruling: 09.Jun.11 1.Blake International USA Rigs: RIG-5 $24,693,607 / $63,200 per day including mo/demobilization) Status [AWARDED] Updated 10.Jun.11 509. DRILLING PACKAGE [AWARDED] Tender type: Restricted to countries with a trade agreement Scope: 1 Lease contract with no purchase option
Contract-1: Term: 1465 days (28.Dec.11-31.Dec.15) Location: Campeche basin GOM (VI) Platform: 4-legged Kuil-A Well: Kuil-2 Scope: Lease and integral maintenance Unit: Diesel electrical Water depth: Airgap: Drilling depth: +20000ft Drawworks: 2000HP Beds: 100 (72 for PEP+28 for Contractor+Medical room) Bid follow-up: Ref: 18575088-509-11 Release: 29.Mar.11 Register period: from release until prequalification deadline 1st clarification meeting: 07.Apr.11 2nd clarification meeting: 14.Apr.11 Register and prequalification deadline: 29.Apr.11 1.Todco 2.Cosl-Goimar 3.Blake 4.ISO-Firstdrill 5.Nabors 6.Perforadora Central Precalification ruling 12.May.11: All compliant Site visit: n/a 3rd clarification meeting: 20.May.11 4th clarification meeting: 26.May.11 5th clarification meeting: 31.May.11 6th clarification meeting: 01.Jun.11 Proposal submission & opening: 14.Jun.11 1.Todco: Rig 3 $80,149,532 1.ISO-Firstdrill: Rig 2 ISO $79,964,751 (non compliant) Ruling: 28.Jun.11 Todco: Rig 3 $80,149,532 Status [AWARDED] Updated 22.Jul.11 506. DRILLING PACKAGES [AWARDED] Tender type: Restricted to countries with a trade agreement Scope: 3 Lease contracts with no purchase option
Contract-1: Term: 206 days (07.Jun.11-29.Dec.11) Location: Campeche basin GOM (XI) Platform: 8-legged Batab-A Well: Batab-63 Scope: Lease and integral maintenance Unit: Diesel electrical Water depth: +400ft Airgap: 92ft Drilling depth: +20000ft Drawworks: 2000HP Beds: 92 (66 for PEP+26 for Contractor+Medical room) Contract-2: Term: 453 days (06.Nov.11-31.Jan.13) Location: Campeche basin GOM (I) Platform: 8-legged Akal-R Well: Cantarell-2074 Scope: Lease and integral maintenance Unit: Diesel electrical Water depth: +400ft Airgap: 92ft Drilling depth: +20000ft Drawworks: 2000HP Beds: 92 (66 for PEP+26 for Contractor+Medical room) Contract-3: Term: 274 days (10.Oct.11-09.Jul.12) Location: Campeche basin GOM (IV) Platform: 8-legged Akal-S Well: Cantarell-2299D Scope: Lease and integral maintenance Unit: Diesel electrical Water depth: +400ft Airgap: 92ft Drilling depth: +20000ft Drawworks: 2000HP Beds: 92 (66 for PEP+26 for Contractor+Medical room) Bid follow-up: Ref: 18575088-506-11 Release: 17.Feb.11 Register period: from release until prequalification deadline 1st clarification meeting: 25.Feb.11 2nd clarification meeting: 03.Mar.11 Register and prequalification deadline: 22.Mar.11 1.Blake 2.Firstdrill-ISO 3.Cosl-Goimar 4.Nabors. Perforadora Central Precalification ruling 01.Apr.11: All compliant Site visit 05.Apr.11 3rd clarification meeting 07.Apr.11 4th clarification meeting 14.Apr.11 5th clarification meeting 19.Apr.11 (last) Proposal submission & opening: 04.May.11 1.Nabors: MASE-801 $15,537,791 2.Nabors: MASE-802 $26,643,546 3.Nabors: P-18 $17,693,725 Ruling: 12.May.11 1.Nabors: MASE-801 $15,537,791 / $75,425 per day (including mobilization) 2.Nabors: MASE-802 $26,643,546 / $58,815 per day (including mobilization) 3.Nabors: P-18 $17,693,725 / $64,575 per day (including mobilization) Status [AWARDED] Updated 14.May.11 DRILLING PACKAGES [AWARDED] Scope: 2 Lease contracts with no purchase option Contract-1: Term: 227 days (19.May.11-31.Dec.11) Location: Campeche basin GOM Platform: 8-legged Yaxche-A Well: Yaxche-35 Scope: Lease and integral maintenance Unit: Diesel electrical Water depth: +400ft Airgap: 92ft Drilling depth: +20000ft Drawworks: 2000HP Beds: 90 (45 for PEP+45 for Contractor+Medical room) Contract-2: Term: 716 days (19.May.11-03.May.13) Location: Campeche basin GOM Platform: 8-legged Zaap-B Well: Zaap-15 Scope: Lease and integral maintenance Unit: Diesel electrical Water depth: +400ft Airgap: 92ft Drilling depth: +20000ft Drawworks: 2000HP Beds: 90 (45 for PEP+45 for Contractor+Medical room) Bid follow-up: Ref: 18575088-503-11 Release: 01.Feb.11 Register period: from release until last clarification meeting 1.Cosl 2.Ensco Drilling 3.Perforadora Mexico 4.Blake 5.Goimar 6.Noble 7.Perforadora Central Prequalification: n/a 1st clarification meeting: 08.Feb.11 2nd clarification meeting: 14.Feb.11 3rd clarification meeting: 16.Feb.11 4th clarification meeting: 17.Feb.11 (last) Site visit: n/a Proposal submission & opening: 01.Mar.11 1.Cosl-Goimar, Cosl 2, $14,893,773 2.Cosl-Goimar, Cosl 1, $38,936,283 Ruling: 09.Apr.11 1.Cosl-Goimar, Cosl 2, $14,893,773 / $65,600 per day (including mobilization) 2.Cosl-Goimar, Cosl 1, $38,936,283 / $54,400 per day (including mobilization) Status [AWARDED] Updated 18.Mar.11 DRILLING PACKAGES [RULED] Scope: 3 Lease contracts with no purchase option
Contract-1: Term: 247 days (29.Apr.11-31.Dec.11) Location: Campeche basin GOM (XVI) Platform: 8-legged Chuc-A Well: Chuc-3 Scope: Lease and integral maintenance Unit: Diesel electrical Water depth: +400ft Airgap: 92ft Drilling depth: +20000ft Drawworks: 2000HP Beds: 100 (72 for PEP+28 for Contractor+Medical room) Contract-2: Term: 678 days (02.Aug.11-09.Jun.13) Location: Campeche basin GOM (F) Platform: 8-legged Ku-F Well: Ku-1293 Scope: Lease and integral maintenance Unit: Diesel electrical Water depth: +400ft Airgap: 92ft Drilling depth: +20000ft Drawworks: 2000HP Beds: 100 (72 for PEP+28 for Contractor+Medical room) Contract-3: Term: 934 days (05.May.11-23.Nov.13) Location: Campeche basin GOM (TM) Platform: 8-legged Akal-TM Well: Cantarell-3017-D Scope: Lease and integral maintenance Unit: Diesel electrical Water depth: +400ft Airgap: 92ft Drilling depth: +20000ft Drawworks: 2000HP Beds: 100 (72 for PEP+28 for Contractor+Medical room) Bid follow-up: Ref: 18575088-508-10 Release: 30.Nov.10 Register period: from release until prequalification deadline 1st clarification meeting: 09.Dec.10 2ndt clarification meeting: 15.Dec.10 Register and prequalification deadline: 29.Dec.10 1.Perforadora Central 2.Blake 3.Cosl 4.Nabors 5.Todco 6.ISO-Firstdrill 7.Perforaciones y Servicios Central Prequalification ruling: 07.Jan.11 All compliant but 7.Perforaciones y Servicios Central Site visit: 10.Jan.11 3rd clarification meeting: 13.Jan.11 4th clarification meeting: 19.Jan.11 5th clarification meeting: 24.Jan.11 Proposal submission & opening: 09.Feb.11 -Blake International USA Rigs: 1.Blake Rig 2002 $20.9m, 2.Blake Rig 2001 $33.0m, 3.Blake Rig 2003 $40.3m, 2+3 $71.5m, 1+2+3 $92.4m -Nabors Perforaciones de Mexico: 1.Mase 805 $29.6m, 2.Nabors M175 $49.1m, 3.Mase 801 $48.3m -ISO - Firstdrill Ltd: 1.Rig 1 ISO $21.3m, 2Rig 1 ISO $41.2m, 3.Rig 5 $49.5m Ruling: 01.Mar.11 1.VOID (no compliant proposal submitted) 2.Blake International USA Rigs, Blake Rig 2001, $30,677,610, $45,250 per day 3.Blake International USA Rigs, Blake Rig 2003, $40,788,330, $43,670 per day Status [RULED] Updated 02.Mar.11 DRILLING PACKAGE (TENDER TYPE) [VOID] Scope: 1 Lease contract with no purchase option Term: 685 days starting 30.Sep.11 Location: Campeche basin GOM (D) Platform: 8-legged Ku-A Well: Ku-64 Scope: Lease and integral maintenance Unit: Tender type assisted by barge/semisubmersible for well drilling/ termination/ reparation/ re-entries/ deepening Age restriction: delivered in 1995 or newer/ updated and modernized in 1995 or before Certifications: IACS, MODU (MOU), Registered Water depth: +400ft Airgap: 92ft Drilling depth: +20000ft Drawworks: 2000HP Beds: 45 for Pemex+Medical room+Contractor´s needs
Bid follow-up: Ref: 18575088-507-11 Release: 08.Mar.11 Register period: from release until last clarification meeting Prequalification: n/a Site visit: 14.Mar.11 1st clarification meeting: 15.Mar.11 2nd clarification meeting: 16.Mar.11 3rd clarification meeting: 17.Mar.11 Registered bidders: 1.Goimar 2.Grupo Empresarios del Sureste 3.Aurora Offshore Services 4.Alpha Offshore Mexico Company 5.Perforadora Central 6.YCNEX Mexico 7.Geomarex 8.Atlantic Marine Services 9.Global Tender Barges Mexico 10.Geofisica Marina de Exploracion Proposal submission & opening: 28.Mar.11 Global Tender Barges Mexico, Global Jade, $98,597,600 Ruling: 06.Apr.11 Technical proposal of Global Tender Barges was ruled non compliant Status [VOID] Updated 08.Apr.11 DRILLING PACKAGE (TENDER TYPE) [VOID] Scope: 1 Lease contract with no purchase option Term: 808 days from 15.Ago.11 Location: Campeche basin GOM (D) Platform: 8-legged Ku-A Well: Ku-64 (TET-Akal-TQA) Scope: Lease and integral maintenance Unit: Tender assisted by barge/semisubmersible for well drilling/ termination/ reparation Year delivered: 1995 and newer Certifications: IACS, MODU, Register diesel electrical/ heliport Water depth: +400ft Airgap: 92ft Drilling depth: +20000ft Drawworks: 2000HP
Bid follow-up: Ref: 18575088-506-10 Release: 26.Oct.10 Register period: from release until prequalification deadline 1st clarification meeting: 10.Nov.10 2nd clarification meeting: 17.Nov.10 Register and prequalification deadline: 30.Nov.10 Prequalification ruling: 09.Dec.10 1.Goimar 2.Seadrill Offshore 3.ISO-Firstdrill Site visit: 10.Dec.10 3rd clarification meeting: 13.Dec.10 4th clarification meeting: 17.Dec.10 5th clarification meeting: 21.Dec.10 6th clarification meeting: 28.Dec.10 7th clarification meeting: 04.Jan.11 Proposal submission & opening: 18.Jan.11 Ruling: 14.Feb.11 Status [VOID] Tender declared nul A new RFP should be released shortly Updated 18.Feb.11 DRILLING PACKAGE Tender History 2010
Marine Division [RULED] Scope 2 Lease contracts with no purchase option Contract-1 Term: 718d (14.Jan.11-31.Dec.12) Location: Campeche basin Platform: 8-legged Yaxche-A Well: Yaxche-25 Unit: Diesel electrical Drilling depth: +25000ft Drawworks: 3000HP Beds: 90 Contract-2 Term: 311d (25.Dec.10-31.Oct.11) Location: Campeche basin Platform: 8-legged Akal-TJ Well: Sihil-19 Unit: Diesel electrical Drilling depth: +20000ft Drawworks: 2000HP Beds: 90 Bid follow-up Ref: 18575088-503-10 Release: 28.Sep.10 Register period: from release until prequalification deadline 1st clarification meeting: 11.Oct.10 2nd clarification meeting: 18.Oct.10 Register and prequalification deadline: 27.Oct.10 Prequalification ruling: 12.Nov.10 1.COSL-GOIMAR 2.Nabors 3.TODCO 4.Perforadora Central Site visit: 16.Nov.10 3rd clarification meeting: 18.Nov.10 4th clarification meeting: 19.Nov.10 5th clarification meeting: 22.Nov.10 6th clarification meeting: 23.Nov.10 7th clarification meeting: 24.Nov.10 (last) Proposal submission & opening: 06.Dec.10 Contract-1: No proposal submitted (VOID) Contract-2: One proposal submitted 1.COSL Mexico - GOIMAR Proposed unit: COSL 3 Lease contract: $17,009,704 Rent: $54,694/day Ruling: 14.Dec.10 Contract-1: No proposal submitted (VOID) Contract-2: COSL Mexico - GOIMAR, COSL 3, $17,009,704 ($54,694/day) Status [RULED] Updated 17.Dec.10 Marine Division [CANCELED] Scope 2 Lease contracts with no purchase option Contract 1 Term: 752d (07.Dec.10-27.Dec.12) Location: Campeche basin Platform: 8-legged Yaxche-A Well: Yaxche-25 Unit: Diesel electrical Drilling depth: +25000ft Drawworks: 3000HP Beds: 90 Contract 2 Term: 273d (24.Sep.10-23.Jun.11) Location: Campeche basin Platform: 8-legged Akal-TJ Well: Sihil-19 Unit: Diesel electrical Drilling depth: +20000ft Drawworks: 2000HP Beds: 90 Bid follow-up Ref: 18575088-005-10 Release: 06.Jul.10 Registered bidders Status: CANCELED A new RFPs to be released shortly Updated 15.Jul.10
North Division [AWARDED] Contract: Lease with no purchase option Term: 1039d (20.Jul.10-23.May.13) Location: GOM Platform: Arenque B, C Well: Arenque 16 Unit: Diesel electrical Drilling depth: +17 500ft Drawworks: 1000HP Bid follow-up Ref: 18575088-004-10 Release: 12.Mar.10 (Compranet) Site visit: 22.Mar.10 1st Clarification meeting: 25.Mar.10 2nd Clarification meeting: 06.Apr.10 3rd Clarification meeting: 14.Apr.10 4th Clarification meeting: 19.Apr.10 5th Clarification meeting: 19.Apr.10 6th Clarification meeting: 22.Apr.10 7th Clarification meeting: 23.Apr.10 Proposal submission & opening: 30.Apr.10 Ruling: 20.May.10 Registered bidders 1.Blake Platform Rigs 2.Perforadora Central 3.Pride Foramer 4.KCA Deutag Offshore As 5.Goimar 6.Mexdrill Offshore 7.Noble Contracting 8.COSL 9.TODCO 10.Ensco Drilling 11.Perforadora Mexico 12.Nabors 13.Iner Servicios 14.Saipem 15.ISOMEX-Firstdrill Ltd 16.Rowandrill 17.Globalsantafe Operations 18.Geomarex 19.Logistica de Perforacion Submitted proposals 1.Nabors: Supersundowner XX $34.65million ($33 350 per day) 2.Blake: Blake 1006E $39.15million ($37 680 per day) Status [AWARDED] Nabors: Supersundowner XX $34.65million ($33 350 per day) Updated 20.May.10 Marine Division [AWARDED] Scope 3 Lease contracts with no purchase option Contract 1 Term: 397d (30.Jun.10-31.Jul.11) Location: Campeche basin Platform: 8-legged OCT-Akal-S Well: Cantarell-2297 Unit: Diesel electrical Drilling depth: +20 000ft Drawworks: 2000HP Quarters for 92 personnel Contract 2 Term: 409d (15.Jul.10-27.Aug.11) Location: Campeche basin Platform: 8-legged OCT-Akal-R Well: Cantarell-2078A Unit: Diesel electrical Drilling depth: +20 000ft Drawworks: 2000HP Quarters for 92 personnel Contract 3 Term: 846d (08.Sep.10-31.Dec.12) Location: Campeche basin Platform: 8-legged OCT-Sihil-A Well: Sihil-2 Unit: Diesel electrical Drilling depth: +20 000ft Drawworks: 2000HP Quarters for 92 personnel Bid follow-up Ref: 18575088-002-10 Release: 09.Mar.10 (Compranet) Site visit: 19.Mar.10 1st Clarification meeting: 24.Mar.10 2nd Clarification meeting: 31.Mar.10 3rd Clarification meeting: 08.Apr.10 Proposal submission & opening: 21.Apr.10 Ruling: 11.May.10 Registered bidders 1.Nabors 2.COSL 3.Blake Platform Rigs 4.Perforadora Central 5.Parker Drilling 6.TODCO 7.GOIMAR 8.ISOMEX Status [AWARDED] 1.Nabors: $24.5million ($61 600 per day) 2.Nabors: $26.0million ($63 550 per day) 3.COSL $40.5million ($48 200 per day) Updated 20.May.10 6. Marine Division [VOID] Contract: Lease with no purchase option Term: 231d (15.May.10-31.Dec.10) Location: Campeche basin Platform: 8-L Manik-A Well: Manik-12 Unit: Diesel electrical Drilling depth: +20 000ft Drawworks: 2000HP Bid follow-up Ref: 18575088-001-10 Release: 19.Feb.10 (Compranet) Site visit: 26.Feb.10 1st Clarification meeting: 01.Mar.10 2nd Clarification meeting: 04.Mar.10 3rd Clarification meeting: 05.Mar.10 Closing: 10.Mar.10 Proposal submission & opening: 16.Mar.10 Registered bidders 1.Todco 2.Nabors 3.COSL 4.Perforadora Central 5.Geofisica Marina de Exploracion 6.Blake Platform Rigs 7.GOIMAR Potential participants Status [VOID] Tender declared nul on 26.Mar.10 A new RFP should be released shortly Updated 29.Mar.10 _______________________________
PEMEX EXPLORATION & PRODUCTION (PEP)
DEEPWATER CONSULTING Current assignments: 1. Production systems: Scandpower Petroleum Technology 2. Foundation design: Norweigan Geotechnical Institute 3. Well drilling termination & maintenance: Canadian Triton International Coming opportunities will be posted as soon as released DEEPWATER PROSPECTING Three projects defined in GOM deep basin: 1. GOM B 2. GOM South 3. Perdido Area Based on seismic studies there would be nine blocks with 29.5billion barrel reserves So far prospecting wells in GOM B: Nab-1 (oil) Noxal-1 (gas) Lakach-1 (gas) Lalail-1 (gas) have incorporated 520million barrel as proven reserves 4. Deep-waters seismic exploration over 75000km2 of the GOM using 3D wide-azimuth technology: CGGVeritas We will timely post coming RFPs ____________________________________ On a specialty basis we will consider to provide expert representation services to international companies pursuing work in Mexico's deep-water development Contact: info@aramoni.com ____________________________________ PEMEX EXPLORATION & PRODUCTION (PEP) OFFSHORE PLATFORM HISTORY 531. Transport and installation [VOID] Project Scope: 4 decks and 1 jacket Platforms: 1.Kuil-A: deck located JRay Mcdermott's yard in Altamira Tamaulipas to Kuil field in the Campeche basin 2.Tsimin-A: deck located CICSA's yard in Madero Tamaulipas to Tsimin field in the Campeche basin 3.Tsimin-B: deck located ICA Fluor's yard in Madero Tamaulipas to Tsimin field in the Campeche basin 4.Maloob-D: jacket (8-leg))and deck located in JRay Mcdermott's yard in Altamira Tamaulipas to Malood fied in the Campeche basin Term: 196 days (12.Jul.11-23.Jan.12) Bidders profile Restricted to companies from countries having a free trade agreement with Mexico Combine equity: $42+million (MXP 500+million) Contract Type: Lump sum Down payment: n/a Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-531-11 Release: 31:May.11 Prequalification: n/a Site visit: n/a 1st clarification meeting: 08.Jun.11 2nd clarification meeting: 13.Jun.11 3rd clarification meeting: 16.Jun.11 (last) Potential bidders 1.J Ray McDermott 2.Permaducto (Protexa) 3.Saipem America 4.Heerema Marine Contractors Americas note: Subsea7 attended all meetings as observer Submission & opening: 27.Jun.11 Actual proposals 1. J Ray McDermott de Mexico-McDermott Inc-McDermott Marine Mexico: $73,292,770 2. Saipem America Inc-Saimexicana: $73,485,000 3. Servicios Maritimos de Campeche: $77,430,520 Ruling: 11.Jul.11 VOID: a new public/restricted RFQs should be released shortly Status [VOID] Updated 12.Jul.11
522. Xux-B: Drilling [AWARDED] Project Offshore 8-legged drilling platform Scope: Engineering/ procurement/ construction/ loading/ fixing Field: Xux Location: Campeche basin GOM Term: 420 days starting 01.Jun.11 Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $27+million (MXP 350+million) Contract Type: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-522-11 Release: 12.Apr.11 Site visit: n/a Prequalification: n/a 1st clarification meeting: 28.Apr.11 2nd clarification meeting: 11.May.11 Legal/ administrative preliminary revision: Recommended Submission & opening: 23.May.11 • Zemk Proyectos-ASTC-Lonestar Energy Fabrication: mxp113,229,558.18 + $10,281,498.58 • Evya-State Service Co: mxp100,971,618.46 + $14,862,510.80 • Operadora CICSA: mxp132,852,663.25 + $12,775,139.16 • Construcciones Mecanicas Monclova (COMMSA-GIMSA): mxp105,197,523.12 + $15,259,079.17 • Industria del Hierro-ICA Fluor Daniel: mxp114,596,866.45 + $14,537,332.29 • Dragados: mxp86,557,811.28 + $17,153,552.88 • Santa Elena-Acero Rey: mxp150,134,738.04 + $12,216,575.52 • J Ray McDermott: mxp110,470,702.64 + $17,793,532.93 Ruling: 06.Jun.11 Construcciones Mecanicas Monclova (COMMSA-GIMSA): mxp105,197,523.12 + $15,259,079.17 = $24,291,468.01 Status AWARDED Updated 06.Jun.11
521. Xux-A: Drilling [AWARDED] Project Offshore 8-legged drilling platform Scope: Engineering/ procurement/ construction/ loading/ fixing Field: Xux Location: Campeche basin GOM Term: 420 days starting 01.Jun.11 Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $27+million (MXP 350+million) Contract Type: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-521-11 Release: 12.Apr.11 Site visit: n/a Prequalification: n/a 1st clarification meeting: 27.Apr.11 2nd clarification meeting: 06.May.11 Legal/ administrative preliminary revision: Recommended Submission & opening: 18.May.11 • Zemk Proyectos-ASTC-Lonestar Energy Fabrication: mxp110,477,444.56 + $10,328,470.79 • Evya-State Service Co: mxp96,301,362.17 + $15,166,478.36 • Industria del Hierro-ICA Fluor Daniel: mxp121,111,222.67 + $14,733,369.54 • Operadora CICSA: mxp146,096,463.56 + $13,528,987.66 • J Ray McDermott: mxp111,860,199.50 + $17,740,617.64 • Construcciones Mecanicas Monclova (COMMSA-GIMSA): mxp125,953,981.06 + $18,482,114.75 • Dragados: mxp98,410,139.09 + $20,895,333.27 Status AWARDED Ruling: 31.May.11 Grupo Evya-State Service Co: mxp96,301,362.17 + $15,166,478.36 = $23,351,193.83 Updated 31.May.11
512. Onel-A: Well recovery [AWARDED] Project Offshore 8-legged well recovery platform Scope: Engineering/ procurement/ construction/ loading/ fixing Field: Onel Location: Campeche basin GOM Term: 420 days starting 01.Jun.11 Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: Contract Type: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-512-11 Release: 05.Apr.11 Site visit: n/a Prequalification: n/a 1st clarification meeting: 11.Apr.11 2nd clarification meeting: 25.Apr.11 3rd clarification meeting: 04.May.11 Legal/ administrative preliminary revision: Recommended Submission & opening: 23.May.11 • Operadora CICSA: mxp160,106,474.19 + $18,993,678.77 • Construcciones Mecanicas Monclova (COMMSA-GIMSA): mxp146,722,872.29 + $21,323,403.81 • Industria del Hierro-ICA Fluor Daniel: mxp153,874,002.12 + $22,591,466.86 • Evya-State Service Co: mxp161,623,568.44 + $22,770,209.39 • J Ray McDermott: mxp123,642,361.72 + $27,265,886.94 • Dragados: mxp128,203,085.27 + $28,807,129.96 Ruling: 06.Jun.11 Operadora CICSA: mxp160,106,474.19 + $18,993,678.77 = $32,740,617.75 Status AWARDED Updated 10.Jun.11
LIVING QUARTER HA-LT-01 • Project managment support for HA-LT-01 [AWARDED: DIRAC $1.3million] Project Tender History Platform History
LIVING QUARTER HA-LT-01
Project management support for platform coming tender [AWARDED] Scope: Idem Term: 543 days (18 months) Locations: Madero Tamaulipas (first 13-month period) Offshore (last 5-month preriod) Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $750 000+ (10m+ local currency) Contract Type: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Local content: n/a Subcontracts allowed: n/a Bid follow-up Ref: 18575106-022-09 Release: 03.Sep.09 Site visit: n/a 1st clarification meeting: 08.Sep.09 2nd clarification meeting: 15.Sep.09 3rd clarification meeting: 22.Sep.09 4th clarification meeting: 28.Sep.09 Closing: 30.Sep.09 Submission & opening: 06.Oct.09 Registered bidders 1.COORDINACION TECNICO ADMINISTRATIVA DE OBRAS 2.TECHMAN GROUP 3.GLM COMUNICACIONES 4.NAVARRETE NAVARRO CONSTRUCTORES 5.CONSTRUCTORES Y CONSULTORES DE TAMAULIPAS 6.CONSULTORÍA INTEGRAL EN INGENIERÍA 7.GRUPO OPERADOR DE INGENIERIA Y MONTAJES 8.SUPPLY OUTSOURCING SERVICES 9.BUREAU VERITAS MEXICANA 10.DIRAC 11.GESTION INTEGRAL EMPRESARIAL 12.NARCIA SERVICE 13.SGS DE MEXICO 14.CONSTRUCTORA G T 15.CONSULTORIA, SUPERVISION TECNICA Y OPERACION EN SISTEMAS 16.GRUPO DIARQCO 17.DESARROLLO, TECNOLOGÍA Y PLANEACIÓN 18.BUFETE DE MANTENIMIENTO PREDICTIVO INDUSTRIAL 19.COTER 20.GRUPO SAFFC DE MÉXICO 21.ORGANIZACION DE CALIDAD SIGLO XXI 22.VISION INTEGRAL GENERADORA DE EMPRESAS NACIONALES 23.FELIPE OCHOA Y ASOCIADOS (FOA) Potential participants Status AWARDED Ruling: 12.Nov.09 DIRAC: $1.3million Updated 14.Nov.09 Project tender history:
KUIL-A Transport and installation [VOID] Project Offshore terapod platform Scope: Piles, jacket, deck, heliport and various minor structures Transport: from JRay Mcdermott's yard in Altamira to offshore Tabasco Term: 114 days (31.Mar.11-22.Jul.11) Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $42+million (MXP 500+million) Contract Type: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: none Bid follow-up Ref: 18575106-503-11 Release: 08.Feb.11 Site visit: n/a 1st clarification meeting: 18.Feb.11 2nd clarification meeting: 02.Mar.11 3rd clarification meeting: 11.Mar.11 (last) Prequalification: n/a Submission & opening: 23.Mar.11 Registered bidders 1.J Ray McDermott 2.Mc Dermott Marine 3.Global Offshore 4.Permaducto (Protexa) 5.Saipem America Potential participants Heerema, Dockwise, Kuehne+Nagel, FoundOcean Status [VOID] No proposals submitted Scope will be split in sub and upper structure RFPs for transport and installation of the jacket expected mid April Updated 23.Mar.11 Ref: Kuil-A: Tetrapod (reinforced) [AWARDED] Project Offshore terapod platform Scope: Engineering/ procurement/ construction/ loading/ fixing Location: Campeche basin GOM Term: 370 days starting 25.May.10 Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: Contract Type: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-002-10 Release: 25.Feb.10 Site visit: n/a 1st clarification meeting: 11.Mar.10 2nd clarification meeting: 25.Mar.10 3rd clarification meeting: 08.Apr.10 4th clarification meeting: 14.Apr.10 5th clarification meeting: 21.Apr.10 (last) Legal/ administrative preliminary revision: Recommended Submission & opening: 28.Apr.10 Ruling: 27.May.10 Registered bidders 1.Ray McDermott 2.Global Offshore 3.CIT 4.Bosnor 5.Industrias W 6.Evya 7.CICSA (Carso) 8.Dragados 9.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 10.Construcciones y Equipos Latinoamericanos (Protexa) 11.Tradeco 12.Industria del Hierro (ICA Fluor Daniel) Potential participants Saipem, ABB, Heerema Status AWARDED Ray McDermott: $21.5million Updated 27.May.10 40. HA-LT-01: Living quarter module [VOID] Project 187 living quarter module & interconnection bridge Scope: Engineering/ procurement/ construction/ loading/ fixing/ transport/ installation Location: Campeche basin GOM Term: 660 days starting 04.Sep.08 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $20m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-004-08 Release: 20.Mar.08 1st clarification meeting: 07.Apr.08 2nd clarification meeting: 18.Apr.08 3rd clarification meeting: 06.May.08 10th clarification meeting & closing: 10.Jul.08 Submission & opening: 16.Jul.08 Registered bidders 1.Dragados 2.Industria del Hierro (ICA Fluor Daniel) 3.Swecomex 4.J Ray McDermott 5.Heerema Marine Contractors 5.Keppel SLP 6.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 7.Oceanografia Potential participants Grupo Constructor Global, JA Energy Fab, Tradeco, Evya, Ingelectric, SIDO E, GI, AILT, Industrias W, Alcatel, Swath, AVC, Sari, Thales, Udee, Rockwell, Dynamic Industries, Cygnus Status VOID Tender declared nul (2nd round) on 11.Sep.08 A new RFPs to be announced shortly Reference 1st-round tender ruled VOID on 19.Jul.07 (full report below) Updated 12.Sep.08
40. HA-LT-01: Living quarter module [VOID] Project 187 living quarter module & interconnection bridge Scope: Engineering/ procurement/ construction/ loading/ fixing/ transport/ installation Location: Campeche basin GOM Term: 660 days starting 01.Aug.07 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $20m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-013-07 Release: 29.Mar.07 Site visit: 12.Apr.07 1st clarification meeting: 17.Apr.07 8th clarification meeting: 29.May.07 Closing: 29.May.07 Submission & opening: 04.Jun.07 Registered bidders 1.Dragados 2.Industria del Hierro (ICA Fluor Daniel) 3.Swecomex 4.Grupo Constructor Global 5.JA Energy Fab 6.Tradeco 7.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 8.Evya 9.Keppel SLP 10.Ingelectric Potential participants SIDO E, GI, AILT, Industrias W, Alcatel, Swath, AVC, Heerema Status VOID Tender ruled on 19.Jul.07 A new RFP to be released shortly Updated 31.Jul.07 54. PP-Tsimin-A [AWARDED] Project Offshore drilling platform (8-legged) Scope: Engineering/ procurement/ construction/ loading/ fixing Location: Tsimin field Campeche basin GOM Term: 390 days Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $10+million Contract Type: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-502-10 Release: 26.Aug.10 Site visit: n/a 1st clarification meeting: 01.Sep.10 2nd clarification meeting: 10.Sep.10 3rd clarification meeting: 21.Sep.10 4th clarification meeting: 24.Sep.10 Submission & opening: 06.Oct.10 Proposal evaluation: 07.Oct.10-17.Oct.10 Ruling: 18.Oct.10 Finalizing: 04.Nov.10 Registered bidders 1.Ray McDermott 2.Evya 3.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 4.CICSA (Carso) 5.Industria del Hierro-ICA Fluor Daniel 6.Berry GP, 7.Dragados 8.CIT Potential participants Construcciones y Equipos Latinoamericanos (Protexa), Bosnor, Ingenieria Industrial y Maritima, Tradeco, Saipem America, Heerema Status AWARDED Operadora CICSA (Carso): $20million Updated 22.Oct.10 53. PP-Tsimin-B [AWARDED] Project Offshore drilling platform (8-legged) Scope: Engineering/ procurement/ construction/ loading/ fixing Location: Tsimin field Campeche basin GOM Term: 390 days Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $10+million Contract Type: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-504-10 Release: 26.Aug.10 Site visit: n/a 1st clarification meeting: 02.Sep.10 2nd clarification meeting: 10.Sep.10 3rd clarification meeting: 23.Sep.10 4th clarification meeting: 27.Sep.10 Submission & opening: 07.Oct.10 Proposal evaluation: 08.Oct.10-18.Oct.10 Ruling: 19.Oct.10 Finalizing: 05.Nov.10 Registered bidders Potential participants 1.Ray McDermott 2.Evya 3.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 4.CICSA (Carso) 5.ICA Fluor Daniel-Industria del Hierro 6.Berry GP, 7.Dragados 8.CIT 9.Tradeco Potential participants Construcciones y Equipos Latinoamericanos (Protexa), Bosnor, Ingenieria Industrial y Maritima, Tradeco, Saipem America, Heerema Status AWARDED ICA Fluor Daniel-Industria del Hierro: $19.5million Updated 22.Oct.10 52. PP- Maloob-D Drilling Platform [AWARDED] Project Offshore drilling platform Scope: Engineering/ procurement/ construction/ loading/ fixing Location: Maloob field Campeche basin GOM Term: 450 days starting 15.Aug.10 Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: Contract Type: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-012-10 Release: 20.May.10 Site visit: n/a 1st clarification meeting: 27.May.10 2nd clarification meeting: 03.Jun.10 3rd clarification meeting: 14.Jun.10 4th clarification meeting: 18.Jun.10 5th clarification meeting: 23.Jun.10 6th clarification meeting: 30.Jun.10 7th clarification meeting: 07.Jul.10 Legal/administrative preliminary revision: Recommended Closing: 07.Jul.10 Submission & opening: 14.Jul.10 Registered bidders 1.Ray McDermott 2.Industria del Hierro (ICA Fluor Daniel) 3.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 4.CICSA (Carso) 5.Dragados 6.Construcciones y Equipos Latinoamericanos (Protexa) 7.Bosnor 8.Ingenieria Industrial y Maritima 9.Tradeco 10.Evya Potential participants Saipem America, Heerema, Eaton Technologies, Hydrotesting Service Status AWARDED Ruling: 03.Aug.10 Construcciones Mecanicas Monclova (COMMSA-GIMSA): $30million Updated 05.Aug.10 51. Kuil-A: Tetrapod (reinforced) [AWARDED] Project Offshore terapod platform Scope: Engineering/ procurement/ construction/ loading/ fixing Location: Campeche basin GOM Term: 370 days starting 25.May.10 Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: Contract Type: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-002-10 Release: 25.Feb.10 Site visit: n/a 1st clarification meeting: 11.Mar.10 2nd clarification meeting: 25.Mar.10 3rd clarification meeting: 08.Apr.10 4th clarification meeting: 14.Apr.10 5th clarification meeting: 21.Apr.10 (last) Legal/ administrative preliminary revision: Recommended Submission & opening: 28.Apr.10 Ruling: 27.May.10 Registered bidders 1.Ray McDermott 2.Global Offshore 3.CIT 4.Bosnor 5.Industrias W 6.Evya 7.CICSA (Carso) 8.Dragados 9.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 10.Construcciones y Equipos Latinoamericanos (Protexa) 11.Tradeco 12.Industria del Hierro (ICA Fluor Daniel) Potential participants Saipem, ABB, Heerema Status AWARDED Ray McDermott: $21.5million Updated 27.May.10 50. Kab-B [AWARDED] Project Light structure platform Scope: Engineering/ procurement/ construction/ tests/ loading/ fixing Location: Contractor's yard Term: 240 days starting 13.Oct.09 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $5m+ Contract Type: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-021-09 Release: 25.Jun.09 Site visit: n/a 1st clarification meeting: 14.Jul.09 2nd clarification meeting: 23.Jul.09 3rd clarification meeting: 31.Jul.09 4th clarification meeting & closing: 14.Aug.09 Submission & opening: 20.Aug.09 Registered bidders 1.Bosnor 2.CIT 3.Construcciones Mecanicas de Monclova 4.Construcciones y Equipos Latinoamericanos (Protexa) 5.Global Offshore 6.Industrias W 7.J Ray McDermott 8.Dragados 9.Cicsa 10.Dynamic Industries International 12.Industria del Hierro (ICA Fluor Daniel) 13.Surpetrol Potential participants Status AWARDED Ruling: 21.Sep.09 Construcciones Mecanicas de Monclova: $13million Updated 02.Oct.09 48. PG-ZAAP-C Power generation [AWARDED] Project Power generation platform and bridge Scope: Engineering/ procurement/ construction/ loading/ fixing/ transport/ installation/ testing/ start-up Location: Campeche basin GOM Term: 660 days starting 30.Sep.09 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $48m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-004-09 Release: 31.Mar.09 Site visit: n/a 1st clarification meeting: 14.Apr.09 2nd clarification meeting: 27.Apr.09 3rd clarification meeting: 12.May.09 4th clarification meeting: 26.May.09 5th clarification meeting: 10.Jun.09 6th clarification meeting: 23.Jun.09 7th clarification meeting: 02.Jul.09 8th clarification meeting: 17.Jul.09 9th clarification meeting: 22.Jul.09 10th clarification meeting: 28.Jul.09 Closing: 29.Jul.09 Submission & opening: 04.Aug.09 Registered bidders 1.ABB 2.Bosnor 3.Dragados 4.Heerema 5.J Ray McDermott 6.Turbinas Solar 7.Demar 8.Industria del Hierro (ICA Fluor Daniel) 9.Cicsa 10.Construcciones y Equipos Latinoamericanos (Protexa) 11.Construcciones Mecanicas de Monclova 12.Siemens 13.GE 14.Global Offshore 15.Technip 16.Elecnor 17.Saipem Potential participants Dresser Rand, Industrias W, Evya, Areche, Sentry, K Tronix, Areche, Especialidades en Turbomaquinaria, Rengen Status AWARDED Ruling: 11.Sep.09 Dragados Offshore de Mexico: $202million Updated 11.Sep.09 49. Kambesah [AWARDED] Project Well recovery platform Scope: Construction Location: Campeche basin GOM Term: 210 days starting 10.Aug.09 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $6m+ Contract Type: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-019-09 Release: 19.May.09 Site visit: n/a 1st clarification meeting: 29.May.09 2nd clarification meeting: 12.Jun.09 3rd clarification meeting: 18.Jun.09 4th clarification meeting: 25.Jun.09 Questioning dealine: 28.jun.09 5th clarification meeting: 30.Jun.09 Closing: 30.Jun.09 Submission & opening: 06.Jul.09 Registered bidders 1.Construcciones Mecanicas de Monclova 2.Construcciones y Equipos Latinoamericanos (Protexa) 3.Dragados 4.Industria del Hierro (ICA Fluor Daniel) 5.J Ray McDermott 6.Cicsa 7.CIT 8.Global Offshore Potential participants Surpetrol, Capstone Turbine, Collado, Evya, W, Udee Status AWARDED Ruling: 28.Jul.09 Construcciones Mecanicas de Monclova: $16million Updated 28.Jul.09 40. HA-LT-01: Living quarter module [VOID] Project 187 living quarter module & interconnection bridge Scope: Engineering/ procurement/ construction/ loading/ fixing/ transport/ installation Location: Campeche basin GOM Term: 660 days starting 04.Sep.08 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $20m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-004-08 Release: 20.Mar.08 1st clarification meeting: 07.Apr.08 2nd clarification meeting: 18.Apr.08 3rd clarification meeting: 06.May.08 10th clarification meeting & closing: 10.Jul.08 Submission & opening: 16.Jul.08 Registered bidders 1.Dragados 2.Industria del Hierro (ICA Fluor Daniel) 3.Swecomex 4.J Ray McDermott 5.Heerema Marine Contractors 5.Keppel SLP 6.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 7.Oceanografia Potential participants Grupo Constructor Global, JA Energy Fab, Tradeco, Evya, Ingelectric, SIDO E, GI, AILT, Industrias W, Alcatel, Swath, AVC, Sari, Thales, Udee, Rockwell, Dynamic Industries, Cygnus Status VOID Tender declared VOID (2nd round) on 11.Sep.08 A new RFPs to be announced shortly Reference 1st-round tender ruled VOID on 19.Jul.07 (full report in next page) Updated 12.Sep.08 47. Akal-Te [AWARDED] Project Thetrapode platform Scope: Engineering/ procurement/ construction Location: contractor's yard Term: 240 days starting 28.Apr.08 Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $6m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-005-08 Release: 07.Feb.08 Site visit: n/a 1st clarification meeting: 14.Feb.08 2nd clarification meeting: 25.Feb.08 3rd clarification meeting: 14.Mar.08 (last) Closing: 19.Mar.08 Submission & opening: 25.Mar.08 Registered bidders 1.Construcciones y Equipos Latinoamericanos (Protexa) 2.Dragados 3.Industria del Hierro (ICA Fluor Daniel) 4.J Ray McDermott 5.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 6.Swecomex 7.EPI 8.CIT Status AWARDED Ruling: 09.May.08 Dragados Offshore de Mexico: $11.5million Updated 16.May.08 46. Ixtal-B [AWARDED] Project Reinforced thetrapode platform Scope: Engineering/ procurement/ construction/ loading/ fixing Location: Campeche basin GOM Term: 360 days starting 05.Mar.08 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $7m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-035-07 Release: 11.Dec.07 Site visit: n/a 1st clarification meeting: 13.Dec.07 3rd clarification meeting: 15.Jan.08 Closing: 16.Jan.08 Submission & opening: 22.Jan.08 Registered bidders 1.Industria del Hierro (ICA Fluor Daniel) 2.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 3.Swecomex 4.J Ray McDermott 5.Dragados 6.Construcciones y Equipos Latinoamericanos (Protexa) 7.CIT 8.Shaw Status AWARDED Ruling: 11.Feb.08 Construcciones Mecanicas Monclova (COMMSA-GIMSA): $25million Updated 29.Feb.08 45. Kab-A [AWARDED] Project Light structure platform Scope: Engineering/ procurement/ construction/ loading/ fixing Location: Campeche basin GOM Term: 210 days starting 30.Aug.07 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $3m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-022-07 Release: 31.May.07 Site visit: n/a 1st clarification meeting: 14.Jun.07 4th clarification meeting: 16.Jul.07 (last) Closing: 18.Jul.07 Submission & opening: 24.Jul.07 Decision: 08.Aug.07 Registered bidders 1.Industria del Hierro (ICA Fluor Daniel) 2.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 3.Swecomex 4.J Ray McDermott 5.Dragados 6.Grupo Constructor Global 7.Construcciones y Equipos Latinoamericanos (Protexa) 8.CIT Status AWARDED Decision: 28.Aug.07 Industria del Hierro (ICA Fluor Daniel): $9.5million Updated 07.Sep-07 44. Atun-D [AWARDED] Project Gathering platform Scope: Construction Location: Offshore Tuxpan Veracruz Term: 329 days starting 10.Aug.07 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $5.5m+ Contract Type: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-010-07 Release: 10.May.07 Site visit: n/a 1st clarification meeting: 24.May.07 6th clarification meeting: 26.Jun.07 (last) Closing: 29.Jun.07 Submission & opening: 05.Jul.07 Registered bidders 1.CIT 2.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 3.Construcciones y Equipos Latinoamericanos (Protexa) 4.Dragados 5.Industria del Hierro (ICA Fluor Daniel) 6.J Ray Mcdermott 7.Swecomex 8.Shaw 9.Oceanografia 10.ABB 11.Grupo Constructor Global Potential participants Status AWARDED Decision: 20.Jul.07 Construcciones Mecanicas Monclova (COMMSA-GIMSA): $19million Updated 31.Jul.07 43. Sinan-118 [AWARDED] Project Light structure platform Scope: Engineering/ procurement/ construction/ loading/ fixing Location: Campeche basin GOM Term: 210 days starting 01.Aug.07 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $3.25m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-020-07 Release: 26.Apr.07 Site visit: n/a 1st clarification meeting: 11.May.07 4th clarification meeting: 14.Jun.07 (last) Closing: 14.Jun.07 Submission & opening: 20.Jun.07 Registered bidders 1.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 2.Industria del Hierro (ICA Fluor Daniel) 3.Dragados 4.Bosnor 5.Shaw 6.Swecomex 7.Construcciones y Equipos Latinoamericanos (Protexa) 8.ICS Triplex 9.JA Energy Fab Potential participants CIT. Evya Status AWARDED Decision: 20.Jul.07 Construcciones Mecanicas Monclova (COMMSA-GIMSA): $11million Updated 31.Jul.07 42. Sinan-So [AWARDED] Project Light structure platform Scope: Engineering/ procurement/ construction/ loading/ fixing Location: Campeche basin GOM Term: 210 days starting 30.Jul.07 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $3.75m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-019-07 Release: 17.Apr.07 Site visit: n/a 1st clarification meeting: 30.Apr.07 6th clarification meeting: 05.Jun.07 Closing: 07.Jun.07 Submission & opening: 13.Jun.07 Registered bidders 1.Bosnor 2.Dragados 3.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 4.Construcciones y Equipos Latinoamericanos (Protexa) 5.Tradeco 6.Industria del Hierro (ICA Fluor Daniel) 7.Shaw 8.Swecomex 9.CIT 10.ICS Triplex Potential participants Grupo Constructor Global, INCYQ, Evya Status AWARDED Decision: 20.Jul.07 Swecomex: $12million Updated 31.Jul.07 41. Yaxche-B [AWARDED] Project Light structure platform Scope: Engineering/ procurement/ construction/ loading/ fixing Location: Campeche basin GOM Term: 210 days starting 17.Jul.07 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $3.25m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-017-07 Release: 03.Apr.07 Site visit: n/a 1st clarification meeting: 23.Apr.07 4th clarification meeting: 28.May.07 Closing: 30.May.07 Submission & opening: 05.Jun.07 Registered bidders 1.Bosnor 2.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 3.Grupo Constructor Global 4.Industria del Hierro (ICA Fluor Daniel) 5.J Ray McDermott 6.Shaw 7.Dragados 8.CIT 9.Tradeco 10.Construcciones y Equipos Latinoamericanos (Protexa) 11.Swecomex 12.ICS Triplex Potential participants Industrias W, INCYQ Status AWARDED Decision: 19.Jul.07 Industria del Hierro (ICA Fluor Daniel): $11.5million Updated 31.Jul.07 40. HA-LT-01: Living quarter module [VOID] Project 187 living quarter module & interconnection bridge Scope: Engineering/ procurement/ construction/ loading/ fixing/ transport/ installation Location: Campeche basin GOM Term: 660 days starting 01.Aug.07 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $20m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-013-07 Release: 29.Mar.07 Site visit: 12.Apr.07 1st clarification meeting: 17.Apr.07 8th clarification meeting: 29.May.07 Closing: 29.May.07 Submission & opening: 04.Jun.07 Registered bidders 1.Dragados 2.Industria del Hierro (ICA Fluor Daniel) 3.Swecomex 4.Grupo Constructor Global 5.JA Energy Fab 6.Tradeco 7.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 8.Evya 9.Keppel SLP 10.Ingelectric Potential participants SIDO E, GI, AILT, Industrias W, Alcatel, Swath, AVC, Heerema Status VOID Tender ruled on 19.Jul.07 A new RFP to be released shortly Updated 31.Jul.07 ___________________________________ FYI, we have got a comprehensive understanding of these tenders and offer expert tailor-made assistance to international companies pursuing projects in Mexico A description of our services in the bottom page Contact: mail@aramoni.com ____________________________________ 39. Tumut-A: Tetrapod [AWARDED] Project Offshore terapod platform Scope: Engineering/ procurement/ construction/ loading/ fixing Location: Campeche basin GOM Term: 330 days starting 13.Jul.07 Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $9m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-009-07 Release: 27.Mar.07 Site visit: n/a 1st clarification meeting: 13.Apr.07 6th clarification meeting: 25.May.07 Closing: 26.May.07 Submission & opening: 01.Jun.07 Registered bidders 1.Swecomex 2.Industria del Hierro (ICA Fluor Daniel) 3.Dragados 4.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 5.Construcciones y Equipos Latinoamericanos (Protexa) 6.Bosnor 7.Shaw 8.J Ray Mcdermott 9.CIT 10.Grupo Constructor Global 11.Tradeco Potential participants Industrias W, INCYQ, Ardica Status AWARDED Decision: 12.Jul.07 Construcciones Mecanicas Monclova (COMMSA-GIMSA): $24million Updated 31.Jul.07
38. HA-RE-01: LIVING QUARTER MODULE (2nd round) [VOID] Project 150 living quarter module & interconnection bridge Scope: Engineering/ procurement/ construction/ loading/ fixing/ transport/ installation/ interconnection/ testing/ commissioning/ start-up Location: Rebombeo (re-pumping) complex Field: Campeche basin GOM Term: 570 days starting 21.Aug.07 Mailstones: Living module 480 days Transport 510 days Start-up 570 days Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $9m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-036-06 Release: 26.Dec.06 Site visit: 03.Jan.07 1st clarification meeting: 04.Jan.07 15th clarification meeting: 25.May.07 Closing: 29.May.07 Submission & opening: 04.Jun.07 Decision: 22.Jun.07 (next) Registered bidders 1.Construcciones Mecanicas de Monclova (GIMSA-COMMSA) 2.Bosnor 3.Swecomex 4.Grupo Constructor Global 5.CIT 6.Ingelectric Norteamerica 7.Industria del Hierro (ICA Fluor Daniel) 8.Dragados 9.CIMISA Potential participants Global Offshore, C&M Marine Services USA Heerema Marine Contractors, Teleconstrucciones Mexicanas, Alcatel Bidders for 1st round 1.Construcciones Mecanicas de Monclova (GIMSA-COMMSA) 2.DMI International 3.Swecomex 4.AR del Golfo 5.Industria del Hierro (ICA Fluor Daniel) 6.CIMISA 7.Keppel SLP 8.Lonestar Marine Shelters 9.Dragados 10.Kepler Constructora Status VOID Tender ruled on 19.Jul.07 A new RFP to be released shortly Updated 31.Jul.07 CHEMUL: Underwater Platform [VOID] Project Scope: Katrina’s damage repair & platform full refurbishment Current location: Atlantic Marine dockyard, Mobile AL Service location: Contractor’s facilities Contract Commissioner: Pemex (Govt) Type: Unit prices Term: 435 days Payments: 30 days after invoice procedures Selection basis: Best qualified amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Bid follow-up Ref: 18575107-091-06 Release: 16.Nov.06 Site visit (Atlantic Marine dockyard, Mobile AL): 27.Nov.06 1st clarification meeting (Ciudad del Carmen Campeche): 05.Dec.06 7th meeting & closing: 02.Feb.07 Submission & opening: 08.Feb.07 Registered bidders (not comprehensive) 1.Cotemar 2.KSES USA 3.OIS Potential participant Halliburton Status VOID Tender ruled on 08.Feb.07 A new RFPs to be announced shortly Updated 25.May.07 PLATFORM COMPLEMENTARY WORKS (2nd-round) [AWARDED] Project Term: 365 days starting 26.Jan.07 Local content: 30% Bidders profile Company/consortium from countries having a free trade agreement with Mexico Experience: 5 yrs Combine equity: $45m+ Subcontracts allowed: Catering & accomodation/ X-rays/ ultrasonic inspection/ diving Contract Type: Unit prices Down payment: n/a Payments: 30 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bid follow-up Ref: 18575108-084-06 Release: 26.Sep.06 Site visit: 09.Oct.06 8th clarification meeting: 08.Dec.06 (last) Closing: 08.Dec.06 Submission & opening: 14.Dec.06 Registered bidders 1.Condux (Protexa) 2.Construcciones Integrales del Carmen 3.Diavaz 4.Cotemar 5.Global Offshore 6.Mantenimiento Marino de Mexico (Halliburton) 7.Oceanografia 8.Tradeco Bidders in 1st round Oceanografia, Condux (Protexa), Construcciones Integrales del Carmen, Cotemar, Tradeco Decision: 15.Jan.07 Finalizing: 25.Jan.07 Status AWARDED Oceanografia: $47million (Updated 19.Jan.07) 37. HA-CA-01: LIVING QUARTER MODULE [AWARDED] Project 1. Existing module uninstallation Scope: Engineering/ dismantlement/ loading/ fixing/ maritime transport/ unloading in Dos Bocas terminal (Tabasco)/ transport/ final disposition 2. New 150 living module Scope: Engineering/ procurement/ construction/ testing/ loading/ fixing/ transport/ installation on existing structure located in Cayo Arcas (Campeche basin)/ interconnection/ commissioning/ start-up Field: Campeche basin Term: 570 days starting 18.Oct.06 Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $9m+ Subcontracts allowed: Ships/ offshore catering/ accommodation/ X-rays/ NDT/ radio positioning Contract Type: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bid follow-up Ref: 18575106-011-06 Release: 20.Apr.06 Submission & opening: 04.Sep.06 Decision: 25.Oct.06 Registered bidders: 1.Construcciones Mecanicas de Monclova (GIMSA-COMMSA) 2.Swecomex 3.Industria del Hierro (ICA Fluor Daniel) 4.Construccion Ingenieria y Montaje Integral (CIMISA) 5.Lonestar Marine Shelters 6.GOIMAR 7.Dragados Offshore de Mexico 8.Keppel-SLP 9.AR del Golfo Status AWARDED Industria del Hierro (ICA Fluor Daniel): $90million (Updated 02.Nov.06) LIVING QUARTER MODULE [CANCELED] Project 151 living module Scope: Civil & electromechanical works/ superstructure/ heliport/ interconnection bridge Location: Rebombeo complex Field: Campeche basin Term: 600 days starting 18.Oct.06 Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $6.5m+ Contract Type: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: 51% Subcontracts allowed: X-rays/ NDT/ project certification Bid follow-up Ref: 18575108-039-06 Release: 20.Jun.06 Registered bidders: 1.Construcciones Mecanicas de Monclova (GIMSA-COMMSA) 2.DMI International 3.Swecomex 4.AR del Golfo 5.Industria del Hierro (ICA Fluor Daniel) 6.CIMISA 7.Keppel SLP 8.Lonestar Marine Shelters 9.Dragados 10.Kepler Constructora Decision: 15.Aug.06: CANCELED A 2nd-round tender to be announced next year (Updated 19.Aug.06) Platform conclusion [VOID] Project Equipment related assignments Scope: EPC Platforms: AKAL complex Field: Campeche basin Term: 452 days from 22.Jun.06 to 02.Sep.07 Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $12m+ Subcontracts allowed: Hot-tapping/ X-rays/ NDT/ PLC setting/ FM-200/ CO2/ offshore catering & accommodation/ satellite positioning/ diving/ risk analysis Contract: Type: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bid follow-up: Ref: 18575106-008-06 Release: 23.Mar.06 Deadline: 18.May.06 Submission & opening: 24.May.06 Registered bidders: 1.Diavaz 2.Demar 3.Dragados 4.Construcciones Integrales del Carmen 5.Condux (Protexa) 6.Oceanografia 7.Lico Construcciones 8.AR del Golfo 9.GOIMSA Decision: 08.Jun.06: VOID A 2nd-round tender to be announced soon (Updated 16.Jun.06) Platform linking [AWARDED] Project Platform interconnections: PB-KU-M & HA-KU-M PB-KU-M & PP-KU-M PB-KU-S & HA-KU-S PB-KU-S & PP-KU-S PP-KU-S & PP-KU-G PP-KU-S & PP-KU-G PP-KU-A2 & HA-ZAAP-C PP-KU-A2 & PP-ZAAP-C Pipes: PP-ZAAP-B to PB-ZAAP-C: Oil 24” 2.4 Km E-KU-A2 to CA-AC-2: Gas 36” 16.8 Km PI-AC-1 A PP-KU-S: Nitrogen 36” 17.2 Km PB-KU-S A PP-KU-M: Nitrogene 24” 6.4 Km PB-KU-S A PP-ZAAP-C: Nitrogene 24” 14 Km Scope: EPC Field: Ku-Maloob-Zaap Term: 270 days from 25.May.06 to 18.Feb.07 Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $8.5m+ Subcontracts allowed: Ships/ hot-tapping/ X-rays/ NDT/ PLC setting/ FM-200/ CO2/ offshore catering & accommodation/ satellite positioning/ diving/ risk analysis Contract Type: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bid follow-up Ref: 18575106-007-06 Release: 16.Mar.06 Submission & opening: 20.Apr.06 Registered bidders: 1.Diavaz 2.Demar 3.Oceanografia 4.Condux (Protexa) 5.Jantesa 6.ARB Arendal 7.GOIMSA 8.Construcciones Integrales del Carmen 9.Dragados Decision: 10.May.06 Demar Instaladora y Constructora: $40million (Updated 12.May.06) 36. HA-AJ-01:Living quarter module [AWARDED] Project 1. Existing module uninstallation Scope: Engineering/ dismantle/ loading/ fixing/ maritime transport/ unloading in Dos Bocas terminal (Tabasco)/ transport/ final disposition 2. New 84 living module Scope: Engineering/ procurement/ construction/ testing/ loading/ fixing/ transport/ installation/ interconnection/ commissioning/ start-up Field: Cantarell Term: 570 days from 30.Jan.06 to 22.Aug.07 Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $10m+ Subcontracts allowed: Ships/ offshore catering/ accommodation/ diving/ transport & crane in Dos Bocas terminal Contract: Type: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bid follow-up: Ref: 18575106-027-05 Release: 30.Aug.05 Submission & opening: 14.Dec.05 Registered bidders (not comprehensive): 1.Construcciones y Equipos Latinoamericanos (CELASA-PROTEXA) 2.Swecomex 3.Dragados Offshore Mexico 4.Siemens 5.Construcciones Mecanicas de Monclova (GIMSA-COMMSA) 6.Bosnor 7.Lonestar Marine Shelters 8.Farmadule Emtunga AB 9.Bay Inelectra de Mexico 10.ESPL Optima 11.Delta Engineering Corp 12.Keppel SLP 13.CIMISA 14.Industria del Hierro (ICA Fluor Daniel) Decision: 25.Jan.06 Swecomex: $60million (Updated 09.Feb.06) FPSO Supervision Service (2nd round) [AWARDED] Scope: Technical assistance & supervision for engineering/ procurement/ construction/ installation/ testing/ commissioning & start-up of an FPSO in the GOM Term: from Nov-05 to Jul-07 Working place: Norway, UAE, Singapore/ US/ Sweden/ Spain & China Selection basis: Lowest price bid from qualified proposals Bid follow-up: Ref: 18200002-020-05 Release: 24.Nov.05 Submission & offers disclosure: 21.Dec.05 Registered bidders: 1.Intec Engineering (US) 2.Global Project Consultants (US) 3.Cygnus Industrial 4.SGS 5.Bureau Veritas Decision: 09.Jan.06 Cygnus Industrial: $3.64million (Updated 20.Jan.06) 35. Carpa-B (Gathering) [AWARDED] Project description Technical: Gathering platform Location: Poza Rica-Altamira Scope: Engineering/ procurement/ fabrication/ installation Term: 333 days from 21-Jul-05 Contracts: Unit prices Down payment: n/a Payments: 30 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $9m+ Subcontracts allowed: Engineering/ risk analysis/ certification/ sub-inspection/ non-destructive testing/ transport/ installation Bid follow-up: Ref: 18575008-012-05 Release: 10-Mar-05 Registration deadline: 20-May-05 Submission: 26-May-05 Registered bidders (not comprehensive): 1.Swecomex 2.Shaw Mexican Holdings 3.Construcciones y Equipos Latinoamericanos (PROTEXA) 4.Stolt Offshore 5.Evya 6.Industria del Hierro (ICA) 7.Construccion Ingenieria y Montaje Integral (CIMISA) Offers disclosure: 10-Jun-05 Decision: 22-Jul-05 Shaw Mexican Holdings $23million 34. Bagre-C (Gathering) [AWARDED] Project description Technical: Gathering platform Location: Poza Rica-Altamira Scope: Engineering/ procurement/ fabrication/ installation Term: 330 days from 09-May-05 Contracts: Unit prices Down payment: n/a Payments: 30 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $9m+ Subcontracts allowed: Engineering/ risk analysis/ certification/ sub-inspection/ non-destructive testing/ transport/ installation 82Bid follow-up: Ref: 18575008-082-04 Release: 28-Dec-04 Submission: 15-Mar-05 Registered bidders: 1.Construcciones y Equipos Latinoamericanos (PROTEXA) 2.Industria del Hierro (ICA) 3.Evya 4.Shaw Mexican Holdings 5.COMINTER 6.CIMISA 7.Swecomex 8.Abengoa Mexico 9.Stolt Offshore Offers disclosure: 30-Mar-05 Decision: 11-May-05 SIPHNOS $15.6million (Updated 20-May-05) a. Offshore transport & installation [VOID] Project description Scope/ location: Transport from fabrication yards/ installation in Campeche basin GOM Platforms included: Drill: PP-KU-S, PP-ZAAP-A/B/D, PP-CITAM-A, PP-SIHIL-A & PP-AKAL-Q/W Production: PB-KU-M, PB-KU-S, PB-KU-A2 & PB-KU-H Living quarters: HA-KU-M/S/H & HA-ZAAP-C Term: 597 days from 07-May-05 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $30m+ Subcontracts allowed: Ship services/ x-ray inspection/ non-destructive testing/ engineering/ diving/ satellite positioning/ ROV/ grommets-chackles-lift frames Bid follow-up: Ref: 18575106-047-04 Release: 30-Dec-04 Registration deadline: 11-Mar-05 Submission: 17-Mar-05 Registered bidders: 1.Heerema Marine Contractors Mexico 2.Condux (PROTEXA) 3.Cotemar 4.Servicios Maritimos de Campeche 5.Maritima Mexicana (TMM) 6.Oceanografia 7.Saipem 8.Global Offshore Mexico Offers disclosure: 05-Apr-05 Decision: 22-Apr-05 VOID (Updated 25-Apr-05) 33. PP-AKAL-W (Drill) Project description Technical: 8-leg drilling platform Location: Field Cantarell Campeche basin Scope: Procurement/ fabrication/ testing/ loading/ fixing Term: 450 days from 20-Dec-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $7.3m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-042-04 Release: 05-Oct-04 Submission: 02-Dec-04 Registered bidders: 1.Industria del Hierro (ICA Fluor Daniel) 2.Dragados Offshore de Mexico 3.Berry Contracting 4.Shaw Mexican Holdings 5.Swecomex 6.Evya 7.Bosnor 8.Construcciones Mecanicas de Monclova (COMMSA) 9.Construcciones y Equipos Lationamericanos CELASA (Protexa) 10.COMINTER 11.Kiewit Offshore Services 12.Construccion Ingenieria y Montaje Integral (CIMISA) 13.Abengoa Mexico Offers disclosure: 10-Dec-04 Decision: 10-Jan-05 Construcciones Mecanicas de Monclova (COMMSA-GIMSA): $39.5million (Updated 28-Jan-05) 32. PP-AKAL-Q (Drill) Project description Technical: 8-leg drilling platform Location: Field Cantarell Campeche basin Scope: Procurement/ fabrication/ testing/ loading/ fixing Term: 450 days from 20-Dec-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $7.3m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-041-04 Release: 05-Oct-04 Submission: 23-Nov-04 Registered bidders: 1.Industria del Hierro (ICA Fluor Daniel) 2.Dragados Offshore de Mexico 3.Berry Contracting 4.Shaw Mexican Holdings 5.Swecomex 6.Evya 7.Bosnor 8.Construcciones y Equipos Latinoamericanos CELASA (PROTEXA) 9.Construcciones Mecanicas de Monclova (COMMSA) 10.COMINTER 11.Kiewit Offshore Services 12.Abengoa Mexico 13.Delta Engineering Corp 14.Construccion Ingenieria y Montaje Integral (CIMISA) Decision: 17-Dec-04 Construcciones Mecanicas de Monclova (COMMSA-GIMSA): $40million (Updated 28-Jan-05) 31. PP-SIHIL-A (Drill) Project description Technical: 8-leg drilling platform Location: Block Sihil Campeche basin Scope: Procurement/ fabrication/ testing/ loading/ fixing Term: 450 days from 20-Dec-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $7.3m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-040-04 Release: 05-Oct-04 Submission: 16-Nov-04 Registered bidders: 1.Industria del Hierro (ICA Fluor Daniel) 2.Dragados Offshore de Mexico 3.Berry Contracting 4.Shaw Mexican Holdings 5.Swecomex 6.Evya 7.Bosnor 8.Construcciones y Equipos Latinoamericanos CELASA (PROTEXA) 9.Construcciones Mecanicas de Monclova (COMMSA) 10.COMINTER 11.Kiewit Offshore Services 12.Obras Portuarias de Coatz 13.Nautica Saltamar Decision: 14-Dec-04 Construcciones Mecanicas de Monclova (COMMSA-GIMSA): $36.5million (Updated 28-Jan-05) 30. PB-KU-H (Production) Project description Field: Ku-Maloob-Zaap Scope: Engineering/ procurement/ fabrication/ yard testing/ loading/ fixing/ technical assistance for installation/ testing/ commissioning/ start-up Term: 790 days from 25-Nov-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $22m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-022-04 Release: 08-Jun-04 Submission: 06-Oct-04 Registered bidders: 1.Industria del Hierro (ICA Fluor Daniel) 2.Swecomex 3.Construcciones y Equipos Latinoamericanos (PROTEXA) 4.Maritima Petroleo e Ingenieria de Mexico 5.Turbinas Solar 6.Bosnor 7.Dynamic Industries 8.Odebrecht Oil & Gas Mexico 9.Kiewit Offshore Services 10.Dragados Offshore de Mexico Decision: 24-Nov-04 Bosnor: $162million (Updated 29-Nov-04) 28/29. HA-KU-H & ZAAP-C (Living quarters) Project Description: 2x220 offshore living quarters including piles sub/superstructures living modules heliport & operational systems Field: Ku-Maloob-Zaap Scope: Engineering/ procurement/ fabrication/ yard testing/ loading/ fixing/ technical assistance for installation/ interconnections/ commissioning/ start-up Term: 663 days from 02-Dec-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $21m+ Subcontracts allowed: HAZOP/ IPR/ marine services/ X-rays/ non-destructive testing/ engineering/ model/ weighing Bid follow-up: Ref: 18575106-027-04 Release: 17-Jun-04 Submission: 22-Oct-04 Registered bidders: 1.SLP Engineering 2.Alianz Petroleum 3.Swecomex 4.Delta Engineering Corporation 5.Construcciones y Equipos Latinoamericanos (PROTEXA) 6.Construcciones Mecanicas de Monclova (COMMSA) 7.Bam Steel Structures 8.Odebrecht Oil & Gas Mexico 9.Berry Contracting 10.Bosnor - Leirvik Module Technology 11.Dynamic Industries 12.Dragados Offshore de Mexico 13.Constructora Bay de Mexico 14.Emtunga 15.CELASA (PROTEXA) 16.Keppel Offshore & Marine 17.Swecomex 18.Technip Offshore 19.Maritima Petroleo e Ingenieria de Mexico Decision: 10-Dec-04 Berry Contracting - Berry GP - Inelectra: $149million (Updated 12-Dec-04) 26/27. HA-KU-S & M (Living quarters) Project Description: 2x220 offshore living quarters including piles sub/superstructures living modules heliport & operational systems Field: Ku-Maloob-Zaap Scope: Engineering/ procurement/ fabrication/ yard testing/ loading/ fixing/ technical assistance for installation/ interconnections/ commissioning/ start-up Term: 663 days from 08-Nov-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $25m+ Subcontracts allowed: HAZOP/ IPR/ marine services/ X-rays/ non-destructive testing/ engineering/ model/ weighing Bid follow-up: Ref: 18575106-025-04 Release: 03-Jun-04 Registration deadline: 16-Sep-04 Submission: 22-Sep-04 Registered bidders: 1.SLP Engineering 2.Technip Offshore 3.Dragados Offshore Mexico 4.Condux 5.Swecomex 6.Construcciones y Equipos Latinoamericanos (PROTEXA) 7.Alianz Petroleum 8.Delta Engineering Corporation 9.Bam Steel Structures 10.Bosnor 11.Dynamic Industries 12.Keppel Offshore & Marine USA 13.Emtunga 14.Construcciones Maritimas y Terrestres de Tabasco 15.Constructora Bay de Mexico 16.Leirvik Beacom Maritime 17.Maritima Petroleo e Ingenieria de Mexico 18.Odebrecht Oil & Gas Mexico 19.Berry Contracting Offers disclosure: 07-Oct-04 Decision: 29.Oct.04 Keppel Offshore and Marine USA - SLP Engineering Limited - Anfels - Gulf Island: $164million 25. CITAM-A (4-legs) Project Scope: Engineering/ procurement/ fabrication/ loading/ fixing Term: 365 days from 20-Sep-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $2.5m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-020-04 Release: 03-Jun-04 Submission: 29-Jul-04 Registered bidders (not comprehensive): 1.Constructora Bay de Mexico 2.Construcciones Mecanicas de Monclova (COMMSA) 3.Swecomex 4.Construcciones y Equipos Latinoamericanos (PROTEXA) 5.COMINTER 6.Shaw Global Energy Services-Shaw Mexican Holdings 7.Bosnor 8.Cominter 9.Berry Contracting Offers disclosure: 13-Aug-04 Decision: 01-Sep-04 Construcciones y Equipos Latinoamericanos (PROTEXA) $24million 24. CB-ZAAP-C (Compression) Project Description: Compression platform/ bridge to production PB-ZAAP-C Field: Ku-Maloob-Zaap Scope: Engineering/ procurement/ fabrication/ loading/ fixing/ technical assistance for installation/ interconnections/ commissioning/ start-up Term: 810 days from 05-Nov-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $20.5m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-017-04 Release: 06-May-04 Registration deadline: 17-Sep-04 Submission: 23-Sep-04 Registered bidders: 1.Construcciones y Equipos Latinoamericanos (PROTEXA) 2.Industria del Hierro (ICA Fluor Daniel) 3.Maritima Petroleo e Ingenieria de Mexico 4.Swecomex 5.Keppel Offshore & Marine USA 6.Kiewit Offshore Services 7.Nuovo Pignone 8.Bosnor 9.Tubinas Solar 10.Dragados Offshore Mexico Offers disclosure: 05-Oct-04 Decision: Cancelled 23. PB-ZAAP-C (Link/production) Project Description: Link/production platform/ burner/ bridge to drilling PP-ZAAP-C/ bridge to new living-quarter HA-ZAAP-C/ bridge & 2 tripods to burner Field: Ku-Maloob-Zaap Scope: Engineering/ procurement/ fabrication/ loading/ fixing/ technical assistance for installation/ interconnections/ commissioning/ start-up Term: 790 days from 01-Nov-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $19.5m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-016-04 Release: 06-May-04 Registration deadline: 08-Sep-04 Submission: 14-Sep-04 Registered bidders (not comprehensive): 1.Izar Construcciones 2.Construcciones y Equipos Latinoamericanos (PROTEXA) 3.Industria del Hierro (ICA Fluor Daniel) 4.Turbinas Solar 5.Constructora Bay de Mexico 6.Bosnor 7.Dragados Offshore de Mexico 8.Maritima Petroleo e Ingenieria de Mexico 9.Swecomex 10.Keppel Offshore & Marine USA 11.Kiewit Offshore Services 12.Nuovo Pignone Offers disclosure: 24-Sep-04 Decision: Cancelled 22. PP-Zaap-A (Drill) Project Field: Ku-Maloob-Zaap Scope: Engineering/ procurement/ fabrication/ loading/ fixing/ technical assistance for installation Term: 450 days from 20-May-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $6m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-005-04 Release: 29-Jan-04 Submission: 29-Mar-04 Registered bidders (not comprehensive): 1.Industria del Hierro 2.Construcciones y Equipos Latinoamericanos (PROTEXA) 3.Constructora Bay de Mexico 4.Bosnor 5.Construccion Ingenieria y Montaje Integral (CIMISA) 6.Swecomex 7.Maritima Petroleo e Ingenieria de Mexico 8.Swath de Mexico Offers disclosure: 19-Apr-04 Decision: 07.May.04 ICA Fluor Daniel: $43million 21. PP-Zaap-B (Drill) Project Field: Ku-Maloob-Zaap Scope: Engineering/ procurement/ fabrication/ loading/ fixing/ technical assistance for installation Term: 450 days from 21-May-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $5.5m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-006-04 Release: 29-Jan-04 Registration deadline: 25-Mar-04 Submission: 31-Mar-04 Registered bidders: 1.Industria del Hierro 2.Construcciones y Equipos Latinoamericanos (PROTEXA) 3.Bosnor 4.Construccion Ingenieria y Montaje Integral (CIMISA) 5.Swecomex 6.Maritima Petroleo e Ingenieria de Mexico 7.Swath de Mexico 8.Constructora Bay de Mexico Offers disclosure: 20-Apr-04 Decision: 21.May.04 Industria del Hierro (ICA Fluor Daniel): $39million 20. PP-Zaap-D (Drill) Project Field: Ku-Maloob-Zaap Scope: Engineering/ procurement/ fabrication/ loading/ fixing/ technical assistance for installation Term: 450 days from 24-May-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $5.7m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-007-04 Release: 29-Jan-04 Registration deadline: 27-Mar-04 Submission: 02-Abr-04 Registered bidders: 1.Industria del Hierro 2.Construcciones y Equipos Latinoamericanos (PROTEXA) 3.Constructora Bay de Mexico 4.Dragados Offshore de Mexico 5.Bosnor 6.Swecomex 7.Construccion Ingenieria y Montaje Integral (CIMISA) 8.Maritima Petroleo e Ingenieria de Mexico 9.Swath de Mexico Offers disclosure: 22-Apr-04 Decision: 21.May.04 Industria del Hierro (ICA Fluor Daniel): $42million 19. PP-KU-S (Drill) Project Field: Ku-Maloob-Zaap Project: Drill platform/ bridge to PP-KU-G (in place) Scope: Engineering/ procurement/ fabrication/ loading/ fixing/ technical assistance for installation Term: 450 days from 08-May-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $5.5m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-002-04 Release: 22-Jan-04 Submission: 22-Mar-04 Registered bidders: 1.Dragados Offshore de Mexico 2.Industria del Hierro 3.Construcciones y Equipos Latinoamericanos (PROTEXA) 4.Bosnor 5.Constructora Bay de Mexico 6.Swecomex 7.Construccion Ingenieria y Montaje Integral (CIMISA) 8.Kiewit Offshore Services Offers disclosure: 05-Apr-04 Decision: 07.May.04 Industria del Hierro (ICA Fluor Daniel): $45million 18. YAXCHE-A (8L-Drill) [AWARDED] Scope: Engineering/ procurement/ construction/ loading/ fixing Term/ field/ location: 300 days from 02-Apr-04/ Tabasco littoral/ Gulf of Mexico Bid follow-up: Ref: 18575106-010-03 Release: 30-Dec-03 Bidders: 1.Construcciones y Equipos Latinoamericanos (PROTEXA) 2.Bosnor 3.Construccion Ingenieria y Montaje Integral (CIMISA) 4.Swecomex 5.COMINTER Decision: 22-Mar-04 COMINTER $22.5 million (Updated 26-Mar-04) 17. PB-KU-M (Production) Project: Production platform/ burner/ bridge to drilling PP-KU-M (in place)/ bridge to living-quarter HA-KU-M (to be tendered)/ bridge & tripod to burner in KMZ field Original scope: Engineering/ procurement/ fabrication/ loading/ transport/ installation/ interconnection/ commissioning/ start-up Actual scope: Engineering/ procurement/ fabrication/ loading/ technical assistance for installation/ interconnection/ commissioning/ start-up Term: 760 days from 23-Jun-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $18m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-007-03 Release: 23-Dec-03 Registration deadline: 07-May-04 Submission: 13-May-04 Registered bidders: 1.Industria del Hierro (ICA Fluor Daniel) 2.J Ray McDermott 3.Bosnor 4.Swecomex 5.ABB Mexico 6.Construcciones y Equipos Latinoamericanos (PROTEXA) 7.IZAR Construcciones Navales 8.Kiewit Offshore Services 9.Odebrecht Oil & Gas Mexico 10.Shaw Mexican Holdings 11.Construccion Ingenieria y Montaje Integral (CIMISA) 12.Berry Contracting 13.Dragados Offshore 4.COMMISA 15.Evya 16.Technip Offshore 17.Turbinas Solar 18.Swath de Mexico 19.Siemens 20.CPI-Berwanger 21.Maritima Petroleo e Ingenieria de Mexico 22.Comfact Corporation Offers disclosure: 21-May-04 Decision: 01-Jun-04 Swecomex-Condumex (parent company): $130million 16. PB-KU-S (Production) Project: Production platform/ burner/ bridge to drilling PP-KU-S/ bridge to living-quarter HA-KU-S/ bridge & tripod to burner in KMZ field Original scope: Engineering/ procurement/ fabrication/ loading/ transport/ installation/ interconnection/ commissioning/ start-up Actual scope: Engineering/ procurement/ fabrication/ loading/ technical assistance for installation/ interconnection/ commissioning/ start-up Term: 880 days from 12-Jul-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $18m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-008-03 Release: 23-Dec-03 Registration deadline: 28-May-04 Submission: 03-Jun-04 Registered bidders: 1.Swecomex 2.Bosnor 3.Dragados Offshore 4.Construccion Ingenieria y Montaje Integral (CIMISA) 5.Grupo Mexicano de Desarrollo (GMD) 6.ABB Mexico 7.Construcciones y Equipos Latinoamericanos (PROTEXA) 8.J Ray McDermott 9.Kiewit Offshore Services 10.Odebrecht Oil & Gas Mexico 11.Siemens 12.Shaw Mexican Holdings 13.Swath de Mexico 15.Dynamic Industries 16.Turbinas Solar 17.Constructora Bay de Mexico 18.Maritima Petroleo e Ingenieria de Mexico Offers disclosure: 10-Jun-04 Decision: 01-Jul-04 Swecomex: $225million 15. PB-KU-A2 (Production) Project: Production platform/ burner/ bridge to E-KU-A2 (to be tendered)/ bridge & tripod to burner in KMZ field Original scope: Engineering/ procurement/ fabrication/ loading/ transport/ installation/ interconnection/ commissioning/ start-up Actual scope: Engineering/ procurement/ fabrication/ loading/ technical assistance for installation/ interconnection/ commissioning/ start-up Term: 760 days from 03-Aug-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $18m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-009-03 Release: 23-Dec-03 Registration deadline: 15-Jun-04 Submission: 21-Jun-04 Registered bidders: 1.Dragados Offshore 2.Swecomex 3.ABB Mexico 4.Construcciones y Equipos Latinoamericanos (PROTEXA) 5.J Ray McDermott 6.Kiewit Offshore Services 7.Odebrecht Oil & Gas Mexico 8.Construccion Ingenieria y Montaje Integral (CIMISA) 9.Shaw Mexican Holdings 10.Constructora Bay de Mexico 11.Siemens 12.Turbinas Solar 13.Bosnor 14.Swath de Mexico 15.Maritima Petroleo e Ingenieria de Mexico 16.GIMSA Construcciones Industriales (TRIBASA) Offers disclosure: 29-Jun-04 Decision: 16-Jul-04 Dragados Offshore de Mexico $185million 13/14. SINAN-A/B (8L-Drill) Scope: Engineering/ procurement/ construction/ loading Term/ field/ location: 450 days from 11-Mar-04/ Ku-Maloob-Zaap/ Bay of Campeche Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $5.5m+ Subcontracts allowed: Engineering/ rolling/ cranes/ weighing/ non destructive testing Bid follow-up: Ref: 18575106-006-03 Release: 02-Dec-03 Top bidders [Clarifications]{Attendances}: 1. Bay de Mexico [112]{2} 2.ICA Fluor Daniel [55]{1} 3.Bosnor [48]{2} 4.Evya [34]{2} 5.Construcciones y Equipos Latinoamericanos (PROTEXA) [39]{1} 6.Swecomex [25]{1} 7.Comercializacion Internacional de Tampico [19]{2} 8.Dragados Offshore Mexico [12]{2} 9.Construccion Ingenieria y Montaje Integral (CIMISA) [12]{2} 10.Construcciones Mecanicas de Monclova (COMMSA/GIMSA) [1]{0} Submission: 30-Jan-04 Offers disclosure: 11-Feb-04 Decision: 23-Feb-04 Construccion Ingenieria y Montaje Integral (CIMISA) $43million (Updated 27-Feb-04) 12. Lobina-1 (Gathering) Scope: Engineering/ procurement/ construction/ installation Term/ field/ location: 331 days from 22-Mar-04/ Lobina/ Bay of Campeche Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $3m+ Subcontracts allowed: Engineering/ x-ray inspection/ transport/ installation/ certification Bid follow-up: Ref: 18575106-003-03 Release: 18-Nov-03 Registered bidders: 1.Construcciones Mecanicas de Monclova (COMMSA/GIMSA) 2.ICA Fluor Daniel 3.Shaw Mexican Holdings 4.ABB Mexico 5.Construcciones y Equipos Latinoamericanos (PROTEXA) 6.Evya 7.Industria del Hierro (ICA) 8.BBI 9.Stolt Offshore Submission: 10-Feb-04 Offers disclosure: 20-Feb-04 Decision: 02-Apr-04 Shaw Mexican Holdings $15.5million (Updated 02-Apr-04) 10/11. SINAN-C&D (8L-Drill) Scope: Engineering/ procurement/ construction/ loading Term/ field/ location: 450 days from 16-Jan-04/ Ku-Maloob-Zaap/ Bay of Campeche Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $6.75m+ Subcontracts allowed: Bid follow-up: Ref: 18575087-017-03 Release: 02-Oct-03 Registered bidders: 1.Industria del Hierro (ICA) 2.Bosnor 3.Construcciones Mecanicas de Monclova (COMMSA/GIMSA) 4.Construcciones y Equipos Latinoamericanos (PROTEXA) 5.Swecomex 6.Comercializadora Internacional de Tampico 7.EVYA 8.Constructora Bay de Mexico 9.Siemens 10.Dragados Offshore de Mexico 11.Honeywell 12.CIGSA Fabricacion 13.Invensys Systems Mexico 14.Emerson Project Management 15.Smar Mexico 16.Construtora Andrade Gutierrez 17.Saw Mexican Holdings 18.Hanover Compression Ltd Partnership 19.ICA Fluor Daniel 20.Energy Land & Sea Projects 21.Construccion Ingenieria y Montaje Integral (CIMISA) Submission: 04-Dec-03 Offers disclosure: 12-Dec-03 Decision: 16-Jan-04 WINNER: Construcciones Mecanicas de Monclova (COMMSA/GIMSA) $44million (Updated 22-Jan-04) 9. PP-KU-C (Drill) Scope: Engineering/ procurement/ construction/ loading/ technical assistance for installation Term/ field/ location: 525 days from 04-Oct-03/ Ku-Maloob-Zaap/ Gulf of Mexico Contracts: Unit prices Down payment: N/A Payments: 20 days after invoicing procedures Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $5m+ Subcontracts allowed: Engineering/ model/ non destructive testing/ weighing/ x-rays/ HAZOP-IPR Bid follow-up: Ref: 18575087-015-03 Release: 24-Jul-03 Registered bidders: 1.Swecomex 2.Evya 3.Bosnor 4.Construcciones y Trituraciones 5.Smar Mexico 6.Industria del Hierro (ICA) 7.Comercializacion Internacional Tampico 8.Honeywell 9.CIGSA Fabricacion 10.Aasercath 11.Asociacion en Ingenieria Aplicada 12.ABC Ingenieria Integral 13.ACE Service 14.C-T CAD Ingenieria y Proyectos 15.Ingenieria Total y Construcciones 16.Bufete Constructor America 17.Emerson Process Management 18.Construcciones Mecanicas de Monclova (COMMSA) Submission: 03-Sep-03 Offers disclosure: 11-Sep-03 Decision: 07-Oct-03 WINNER: Bosnor $37million (Updated 09-Oct-03) 7/8. PP-Maloob-A&B (Drill) Scope: Engineering/ procurement/ construction/ loading/ transport (CANCELED)/ technical assistance for installation Name / term / field/ location: 1. PP-Maloob-A/ 560 days from 29-Sep-03/ Ku-Maloob-Zaap/ Gulf of Mexico 2. PP-Maloob-B/ 590 days from 29-Sep-03/ Ku-Maloob-Zaap/ Gulf of Mexico Contracts: Unit prices Payments: 20 days after invoicing procedures Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $5m+ per contract Subcontracts allowed: Engineering/ models/ non destructive testing/ XRays/ weighing/ transport (CANCELED)/ HAZOP/ IPR Bid follow-up Ref: 18575087-009-03 Release: 22-May-03 Registered bidders: 1.Swecomex 2.Bosnor 3.ICA Fluor Daniel 4.Emerson Process Management 5.Smar Mexico 6.Duro Felguera 7.Honeywell 8.Equipomex 9.Industria del Hierro 10.CIGSA Fabricacion 11.Promaquina 12.Sodes Mexico 13.Construcciones Mecanicas de Monclova (COMMSA) 14.Construcciones y Equipos Latinoamericanos 15.Constructora Bay de Mexico 16.Siemens 17.Izar Construcciones Navales 18.Invensys Systems Mexico 19.ABB Mexico Submission: 21-Aug-03 Offers disclosure: 01-Sep-03 Decision: 12-Sep-03 WINNER: Swecomex $80.5million (Updated 18-Sep-03) 6. Manik-A (Drill) Scope: Engineering/ procurement/ construction/ loading/ transport (CANCELED)/ certification (CANCELED) Term/ field/ location: 420 days from 22-Sep-03/ Abkatum/ Gulf of Mexico Contracts: Unit prices Payments: 20 days after invoicing procedures Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $5m+ Subcontracts allowed: Engineering/ non destructive testing/ weighing/ transport (CANCELED)/ cerfification (CANCELED) Bid follow-up: Ref: 18575087-008-03 Release: 29-May-03 Registered bidders: 1.Swecomex 2.Bosnor 3.Smar Mexico 4.ICA Fluor Daniel 5.Duro Felguera 6.Honeywell 7.Industria del Hierro (ICA) 8.CIGSA Fabricacion 9.Constructora Bay de Mexico 10.Construcciones Mecanicas de Monclova 11.Construcciones y Equipos Latinoamericanos 12.Comercializacion Internacional de Tampico 13.Siemens 14.Izar Construcciones Navales Submission: 06-Aug-03 Decision: 02-Sep-03 WINNER: Swecomex $33.5million (Updated 03-Sep-03) 5. KU-A2 (Link) Scope: Engineering/ procurement/ construction/ loading/ transport/ technical assistance for installation (Rev 12-Jun-03)/ testing/ start-up Project: Ku-Maloob-Zaap Location: Campeche/KUMAZA field/Gulf of Mexico Term: 570 days from 20-Aug-03 (Rev 12-Jun-03) Contract: Unit prices Payments: 20 days after invoicing procedures Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $9.5m+ (Rev 12-Jun-03) Subcontracts allowed: Engineering/ models/ testing/ XRays/ transport/ HAZOP/ IPR Bid follow-up: Ref: 18575087-002-03 Release: 10-Apr-03 Bidders: 1.Bufete Industrial 2.Detroit Diesel Allison de Mexico 3.ICA Fluor Daniel 4.Constructora Bay de Mexico 5.Emerson Process Management 6.Smar Mexico 7.Equipos y Servicios VICA 8.Dragados Offshore 9.Swecomex 10.Bosnor 11.Construcciones Mecanicas de Monclova 12.Odebrecht Oil & Gas Mexico 13.Trade Ingenieria y Proyectos 14.CIGSA Fabricacion 15.Honeywell Mexico 16.Invensys Systems Mexico 17.Construcciones y Equipos Latinoamericanos 18.Siemens Decision: 08-Aug-03 WINNER: Construcciones Mecanicas de Monclova (COMMSA/GIMSA) $48million (Updated 07-Aug-03) 3/4. MAY-A&B (Drill) g. Drilling platforms MAY-A & B Scope: Engineering/ procurement/ construction/ loading/ transport Location: Campeche/Gulf of Mexico Term: 462 days starting 18-Jul-03 Contract: Unit prices Payments: 20 days after invoicing procedures Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $11m+ Subcontracts allowed: Engineering/ models/ testing/ weighing/ transport/ certification Bid information Ref: 18575087-001-03 Release: 12-Mar-03 Register deadline: 04-Jun-03 (Rev 20-May-03) (Done) Site visit: N/A 1st Bidders meeting: 14-Apr-03 (Done) 2nd Bidders meeting: 23-Apr-03 (Done) Submission: 10-Jun-03 (Rev 20-May-03) (Next event) Offers disclosure: 17-Jun-03 (Rev 20-May-03) Bid follow-up: Registered bidders (not comprehensive): 1.Cigsa Fabricacion 2.Duro Felguera 3.ICA Fluor Daniel 4.Bosnor 5.Swecomex 6.Corporacion Janko 7.Edemtec 8.Odebrecht Oil & Gas Mexico 9.Trade Ingenieria y Proyectos 10.Integrated Power Systems 11.Equipos y Servicios Vica 12.Reymon de Mexico 13.Constructora Bay de Mexico 14.Construcciones Mecanicas Monclova 15.Dynamic Industries 16.Comercializadora Internacional de Tampico 17.Construcciones y Equipos Latinoamericanos 18.Talleres Navales del Golfo 19.J Ray McDermott Decision: 01-Jul-03 WINNER: ICA Fluor Daniel $55million (Updated 04-Jul-03) 2. Ixtal-A (8L-Gathering) 18575038-019-02/ Bay de Mexico 1. Lankahuasa-1 (Gathering) d. Offshore well recovery platform Lankahuasa 1 Scope: Engineering-Procurement-Construction Complex: Lankahuasa Location: Offshore Poza Rica Veracruz Term: 244 days Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium Combine equity: US$3.5m+ Bid information Ref: 18575008-062-02 Release: 10-Oct-02 Site visit: 14-Oct-02 1st Bidders meeting: 16-Oct-02 2nd Bidders meeting: 23-Oct-02 Register by 06-Nov-02 Submission due: 12-Nov-02 Offers disclosure: 26-Nov-02 Bid follow-up: Registered bidders (not comprehensive): 1.Bosnor 2.Construcciones Mecanicas Monclova 3.Promotora e Inversora ADISA 4.Comercializacion Internacional de Tampico 5.ICA Fluor Daniel 6.Constructora Bay de mexico 7.Construcciones y Equipos Latinoamericanos 8.Dragados Offshore 9.ABS Group Services Mexico Decision: WINNER: ICA Fluor Daniel (Updated 31-Dec-02) PEMEX EXPLORATION & PRODUCTION (PEP)
PLATFORM RELATED PROJECTS HISTORY Offshore works [AWARDED] Project Existing offshore facilities Scope: Engineering/ procurement/ fabrication/ interconnections Location: Campeche basin GOM Term: 330 days starting 15.Jul.09 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $13m+ (175m+ local currency) Contract Type: unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-005-09 Release: 23.Apr.09 Site visit: 27.Apr.09 1st clarification meeting: 28.Apr.09 2nd clarification meeting: 06.May.09 3rd clarification meeting: 28.May.09 4th clarification meeting: 04.Jun.09 5th clarification meeting: 17.Jun.09 Questioning deadline: 25.Jun.09 6th clarification meeting: 26.Jun.09 Closing: 27.Jun.09 Submission & opening: 03.Jul.09 Registered bidders 1.Construcciones Integrales del Carmen 2.Construcciones Mecanicas de Monclova 3.Condux (Protexa) 4.Diavaz 5.Demar 6.Oceanografia 7.HOC Offshore Potential participants ARB Arendal Status AWARDED Ruling: 16.Jul.09 Demar Instaladora y Constructora: $55million Updated 17.Jul.09 Offshore equipment recondition [VOID] Project Holkan jack-up platform & PM-4500 drilling rig Scope: Transport & general recondition Location: Contractor's shipyard Term: 485 days Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Contract Type: Lump sum Down payment: n/a Payments: 30 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575107-038-08 Release: 03.Jun.08 Site visit: 23.Jun.08 1st clarification meeting: 24.Jun.08 10th clarification meeting: 30.Oct.08 Closing: 30.Oct.08 Submission & opening: 05.Nov.08 Registered bidders 1.Keppel Amfels 2.Third Ocean Vessel and Rig 3.Dragados Offshore 4.Protexa 5.Swecomex Potential participants Evya, Setena Status VOID Tender declared VOID on 15.Dec.08 A new RFPs to be announced shortly Updated 19.Dec.08 Offshore transport & installation [AWARDED] Project description Scope: transport & installation of drilling platforms and related structures Location: Campeche basin GOM Term: 162 days starting 12.Jan.09 Contracts: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $9m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-035-08 Release: 16.Oct.08 Site visit: 24.Oct.08 1st clarification meeting: 29.Oct.08 2nd clarification meeting: 06.Nov.08 3rd clarification meeting: 19.Nov.08 4th clarification meeting: 25.Nov.08 Closing: 30.Nov.08 Submission & opening: 05.Dec.08 Registered bidders (not comprehensive) 1.Condux (Protexa) 2.Heerema 3.J Ray McDermott 4.Oceanografia 5.Saipem America Status AWARDED Decision: 18.Dec.08 J Ray McDermott de Mexico: $50million Updated 20.Jan.09 Offshore maintenance works (3) [AWARDED] Project description Scope: Maintenance of offshore platforms with a subsea vessel (CA) Locations: Campeche basin GOM Term: 1583 days from 04.Jun.08-01.Sep.08 (window) Contracts: Unit prices Down payment: n/a Local content: +10% Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $17m+ Subcontracts allowed: Inspection for non-destructive testing/ diving/ telecom/ satellite positioning Bid follow-up: Ref: 18575108-085-07 Release: 05.Feb.08 Site visit: n/a 1st clarification meeting: 11.Mar.08 2nd clarification meeting: 01.Apr.08 3rd clarification meeting: 09.Apr.08 Closing: 15.Apr.08 Submission & opening: 21.Apr.08 Registered bidders (not comprehensive) 1.Condux (Protexa) 2.Oceanografia 3.Construcciones Integrales del Carmen 4.ARB Arendal 5.Naviera Integral 6.Mantenimiento Marino de Mexico (Halliburton) 7.Subtec 8.Servicios Maritimos de Campeche 9.Cotemar 10.Naviera Petrolera Integral 11.Diavaz Status AWARDED Ruling: 09.May.08 Condux (Protexa): $259million Updated 16.May.08 Offshore transport & installation [AWARDED] Project description Scope: transport & installation of light platforms, structures and equipment Location: Campeche basin GOM Term: 170 days starting 21.Feb.08 Contracts: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $10m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-031-07 Release: 13.Dec.07 Site visit: n/a 1st clarification meeting: 20.Dec.07 3rd clarification meeting: 18.Jan.08 Closing: 18.Jan.08 Submission & opening: 24.Jan.08 Registered bidders (not comprehensive) 1.Condux (Protexa) 2.J Ray McDermott 3.Global Offshore 4.Saipem America 5.Oceanografia 6.Servicios Maritimos de Campeche Status AWARDED Ruling: 05.Feb.08 Condux (Protexa): $49million Updated 07.Feb.08 Liftboat leasing [AWARDED] Project description Scope: Support for termination, maintenance & data acquisition of marine wells/ Logistics, installation, dismantlement of modules, structures, units and equipment components for well dirilling & maintenance or for production facilities/ Depth of water 180'+/ Independent legs 250'+ no extensions allowed/ DGPS required Location: GOM Term: 548 days from 18.Feb.80 to 18.Aug.09 Contracts: Leasing Down payment: n/a Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Bid follow-up: Ref: 18575088-022-07 Release: 18.Oct.07 Site visit: n/a 1st clarification meeting: 05.Nov.07 2nd clarification meeting: 12.Nov.07 3rd clarification meeting: 16.Nov.07 4th clarification meeting: 21.Nov.07 Closing: 23.Nov.07 Submission & opening: 29.Nov.07 Ruling: 19.Dec.07 Finalizing: 08.Jan.07 Registered bidders (not comprehensive) 1.Third Ocean Vessel and Rig 2.Power Marine 3.Cotemar 4.Servicios Maritimos de Campeche 5.Iner Servicios 6. Nabors 7.Perforaciones Maritimas Mexicanas (Protexa) 8.Geomarex 9.Superior Energy Services 10.Todco Status AWARDED Ruling: 19.Dec.07 Atlantic Marine Services BV: $31million Updated 19.Dec.07 Offshore recondition & maintenance (2) [AWARDED] Project description Scope: Recondition & maintenance of offshore platforms & process centers with a subsea vessel (CA) Locations: Office & yards in Ciudad del Carmen Campeche Platforms: Campeche basin GOM Term: 1826 days from 15.Jan.08 Contracts: Unit prices Down payment: n/a Local content: +10% Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $42m+ Subcontracts allowed: Inspection for non-destructive testing/ diving/ satellite positioning Bid follow-up: Ref: 18575108-052-07 Release: 09.Oct.07 Site visit: n/a 1st clarification meeting: 19.Oct.07 2nd clarification meeting: 09.Nov.07 3rd clarification meeting: 14.Nov.07 Deadline for questioning & 4th clarification meeting: 16.Nov.07 5th clarification meeting: 22.Nov.07 Closing: 22.Nov.07 Submission & opening: 28.Nov.07 Registered bidders (not comprehensive) 1.Servicios Maritimos de Campeche 2.Condux (Protexa) 3.Cotemar 4.Mantenimiento Marino de Mexico (Halliburton) 5.Oceanografia Status AWARDED Ruling: 18.Dec.07 Cotemar: $340million Updated 19.Dec.07 Offshore recondition & maintenance (1) [AWARDED] Project description Scope: Recondition & maintenance of offshore platforms with a subsea vessel (SA) Locations: Office & yards in Ciudad del Carmen Campeche Platforms: Campeche basin GOM Term: 1826 days from 21.Dec.08 Contracts: Unit prices Down payment: n/a Local content: +10% Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $24m+ Subcontracts allowed: Inspection for non-destructive testing/ diving/ satellite positioning Bid follow-up: Ref: 18575108-057-07 Release: 18.Sep.07 Site visit: n/a 1st clarification meeting: 24.Sep.07 9th clarification meeting & closing: 31.Oct.07 Submission & opening: 06.Nov.07 Registered bidders (not comprehensive) 1.Cotemar 2.Mantenimiento Marino de Mexico (Halliburton) 3.Condux (Protexa) 4.Servicios Maritimos de Campeche 5.Subtec 6.Paredon 7.Oceanografia Status AWARDED Ruling: 23.Nov.07 Cotemar: $295million Updated 07.Feb.08 Offshore maintenance works (5) [AWARDED] Project description Scope: Offshore maintenance work with a dynamic positioning vessel Location: Campeche basin GOM Term: 5yrs starting 01.Feb.08 Contracts: Unit prices Down payment: n/a Local content: +10% Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $21m+ Subcontracts allowed: Inspection for non-destructive testing/ diving/ satellite positioning Bid follow-up: Ref: 18575108-045-07 Release: 09.Oct.07 Site visit: n/a 1st clarification meeting: 22.Oct.07 2nd clarification meeting: 05.Nov.07 3rd clarification meeting: 13.Nov.07 4th clarification meeting: 23.Nov.07 5th clarification meeting & closing: 30.Nov.07 Submission & opening: 06.Dec.07 Ruling: 08.Jan.07 Finalizing: 01.Feb.07 Registered bidders (not comprehensive) 1.Condux (Protexa) 2.Servicios Maritimos de Campeche 3.Construcciones Integrales del Carmen 4.Oceanografia 5.Mantenimiento Marino de Mexico (Halliburton) 6.Diavaz 7.Cotemar 8.Subtec Potential participants CTM Campeche Construcciones Status AWARDED Ruling: 08.Jan.07 Oceanografia: $215million Updated 18.Jan.08 Offshore maintenance works (4) [DECISION PENDING] Project description Scope: Offshore maintenance work with a dynamic positioning vessel Location: Campeche basin GOM Term: 5yrs starting 01.March.08 Contracts: Unit prices Down payment: n/a Local content: +10% Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $17m+ Subcontracts allowed: Inspection for non-destructive testing/ diving/ satellite positioning Bid follow-up: Ref: 18575108-044-07 Release: 21.Aug.07 Site visit: n/a 1st clarification meeting: 18.Sep.07 2nd clarification meeting: 26.Sep.07 5th clarification meeting: 16.Oct.07 6th clarification meeting: 25.Oct.07 7th clarification meeting: 07.Nov.07 8th clarification meeting: 16.Nov.07 9th clarification meeting & closing: 23.Nov.07 Submission & opening: 29.Nov.07 Registered bidders (not comprehensive) 1.Cotemar 2.CTM Campeche Construcciones 3.Servicios Maritimos de Campeche 4.Diavaz 5.Subtec 6.Condux (Protexa) 7.Global Offshore 8.Mexicana de Servicios Subacuaticos 9.Oceanografia 10.ARB Arendal 11.Construcciones Integrales del Carmen 12.TMM 13.CCC Status SUBMITED Updated 30.Nov.07/rev 18.Apr.08 Offshore installation works [AWARDED] Project description Scope: Installation & recovery of platforms/ installation of heavy equipment Location: Campeche basin GOM Term: 1826 days from 09.Apr.08 to 08.Apr.13 Contracts: Unit prices Down payment: n/a Local content: 10% Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $55m+ Subcontracts allowed: Inspection for non-destructive testing/ diving/ satellite positioning/ MEBI & METI Bid follow-up: Ref: 18575108-029-07 Release: 31.May.07 Site visit: n/a 1st clarification meeting: 29.Jun.07 5th clarification meeting: 31.Jul.07 (last) Closing: 31.Jul.07 Submission & opening: 06.Aug.07 Registered bidders (not comprehensive) 1.Cotemar 2.Construcciones Integrales del Carmen 3.Global Offshore Mexico 4.Subtec 5.Diavaz 6.Oceanografia 8.Condux (Protexa) Status AWARDED Decision: 24.Jan.08 Oceanografia: $445million Updated 25.Jan.08 PEMEX EXPLORATION & PRODUCTION (PEP)
MSC HISTORY 21. BURGOS VIII-C [CANCELED] Project Scope: Gas-field development (drilling/ infrastructure/ maintenance) Location: Tamaulipas and Nuevo Leon (Burgos basin) Contract Commissioner: Pemex-PEP Term: 1095 days Type: Unit prices Front payment: n/a Local content (other than land material): 3% Selection basis: Lowest price bid for compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $56+m (700m+ local currency) Subcontracts allowed: Civil/ drilling/ compression works Bid follow-up Ref: 18575110-003-09 Release: 25.Jun.09 Site visit: 10.Jul.09 1st clarification meeting: 13.Jul.09 2nd clarification meeting: 24.Jul.09 3rd clarification meeting: 31.Jul.09 4th clarification meeting: 14.Aug.09 5th clarification meeting: 03.Sep.09 6th clarification meeting: 14.Sep.09 7th clarification meeting: 29.Sep.09 8th clarification meeting: 15.Oct.09 9th clarification meeting: 29.Oct.09 10th clarification meeting: 11.Nov.09 11th clarification meeting: 02.Dec.09 Registered bidders 1.Baker Hughes 2.BJ Services 3.Industrial Perforadora de Campeche (IPC) 4.Nabors 5.Dowell Schlumberger 6.Perforadora Mexico 7.Weatherford 8.Halliburton Potential participants ICA Fluor Daniel, H&L, Cameron, Merco, ESA, SAPI, CCC, Proyectos y Desarrollos de Infraestructura Status CANCELED Ruling: 02.Dec.09 A new RFPs to be announced early 2010 Updated 08.Dec.09 20. BURGOS VIII-B [CANCELED] Project Scope: Gas-field development (drilling/ infrastructure/ maintenance) Location: Tamaulipas and Nuevo Leon (Burgos basin) Contract Commissioner: Pemex-PEP Term: 1095 days Type: Unit prices Front payment: n/a Local content (other than land material): 3% Selection basis: Lowest price bid for compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $56+m (700m+ local currency) Subcontracts allowed: Civil/ drilling/ compression works Bid follow-up Ref: 18575110-002-09 Release: 25.Jun.09 Site visit: 03.Jul.09 1st clarification meeting: 06.Jul.09 2nd clarification meeting: 14.Jul.09 3rd clarification meeting: 21.Jul.09 4th clarification meeting: 28.Jul.09 5th clarification meeting: 04.Aug.09 6th clarification meeting: 14.Aug.09 7th clarification meeting: 24.Aug.09 8th clarification meeting: 10.Sep.09 9th clarification meeting: 22.Sep.09 10th clarification meeting: 08.Oct.09 11th clarification meeting: 20.Oct.09 12th clarification meeting: 04.Nov.09 13th clarification meeting: 24.Nov.09 14th clarification meeting: 15.Dec.09 Registered bidders 1.Baker Hughes 2.BJ Services 3.CGGVeritas Services 4.Global Geophysical Services 5.Halliburton 6.Industrial Perforadora de Campeche (IPC) 7.Nabors 8.PGS 9.Servicios Integrales GSM (Carso) 10.Zapata Internacional 11.Perforadora Mexico 12.Weatherford 13.Dowell Schlumberger Potential participants Tubacero, Procarsa, Maquinaria Obra y Desarrollo, Tubos de Acero de Mexico, Cameron, Merco, H&L Status CANCELED Ruling: 15.Dec.09 A new RFPs to be announced early 2010 Updated 18.Dec.09 19. BURGOS VIII-A [AWARDED] Project Scope: Gas-field development (drilling/ infrastructure/ maintenance) Location: Tamaulipas and Nuevo Leon (Burgos basin) Contract Commissioner: Pemex-PEP Term: 1095 days from 14.Sep.09 to 12.Sep.12 Type: Unit prices Front payment: n/a Local content (other than land material): 3% Selection basis: Lowest price bid for compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $56+m Subcontracts allowed: Civil/ drilling/ compression works Bid follow-up Ref: 18575110-001-09 Release: 07.Apr.09 Site visit: 15.Apr.09 1st clarification meeting: 16.Apr.0913 2nd clarification meeting: 23.Apr.09 3rd clarification meeting: 30.Apr.09 4th clarification meeting: 08.May.09 5th clarification meeting: 15.May.09 6th clarification meeting: 22.May.09 2nd Site visit: 25.Apr.09 7th clarification meeting: 29.May.09 8th clarification meeting: 05.Jun.09 9th clarification meeting: 12.Jun.09 10th clarification meeting: 19.Jun.09 (last) Closing: 26.Jun.09 Submission & opening: 02.Jul.09 Registered bidders 1.Industrial Perforadora de Campeche (IPC) 2.Techint 3.Iberoamericana de Hidrocarburos (Block Nejo) 4.Nabors 5.D&S Petroleum 6.Servicios Integrales GSM (Carso) 7.H&L 8.Halliburton 9.Weatherford 10.Dowell Schlumberger 11.Petrotec 12.Baker Hughes 13.BJ Services 14.Turbinas Solar 15.ICA Fluor Daniel 16.Cobra 17.Perforadora Mexico 18.Lewis Energy (Block Olmos) Potential participants Constructora y Perforadora Latina, Perforaciones Maritimas Mexicanas, Cameron, Wood Group Pressure, RAM-100 de Sureste, Vam, Premium, Mirsa, TS, CCC Submitted proposals 1.Industrial Perforadora de Campeche (IPC) 2.CCC Frabricaciones y Construcciones 3.Halliburton - Grey Wolf International 4.Weatherford 5.Dowell Schlumberger - Ofs Servicios - Helmerich & Payne Rasco Inc - ICA Flour Daniel Status AWARDED Ruling: 17.Aug.09 Industrial Perforadora de Campeche (IPC): $578million Updated 21.Aug.09 18. CHICONTEPEC V [VOID] Project Scope: Integrated works/services for drilling & termination of onshore oil fields Location: Veracruz-Puebla Contract Commissioner: Pemex-PEP Term: 1096 days Type: Unit prices Front payment: n/a Local content (other than land material): 3% Selection basis: Lowest price bid for compliant proposals Bidders profile Company/consortium Combine equity: $18+m Subcontracts allowed: n/a Bid follow-up Ref: 18575051-005-09 Release: 24.Feb.09 Site visit: n/a 1st clarification meeting: 27.Feb.09 2nd clarification meeting: 02.Mar.09 3rd clarification meeting: 06.Mar.09 Closing: 07.Apr.09 Preliminary revision of proposal packages: 08.Apr.09 Submission & opening: 13.Apr.09 Ruling: 11.May.09 Registered bidders 1.Servicios Integrales GSM (Carso) 2.Industrial Perforadora de Campeche (IPC) 3.BJ Services 4.D&S Petroleum 5.Halliburton 6.Baker Hughes 7.Sinopec 8.Constructora y Perforadora Latina 9.Perforaciones Maritimas Mexicanas 10.Weatherford Potential participants Cameron, Wood Group Pressure Status VOID Tender declared VOID on 11.May.09 A new RFPs to be announced shortly Updated 15.May.09 17. CHICONTEPEC IV [AWARDED] Project Scope: Integrated works/services for drilling & termination of onshore oil fields Location: Veracruz-Puebla Contract Commissioner: Pemex-PEP Term: 1167day starting 08.Apr.09 Type: Unit prices Front payment: n/a Local content (other than land material): 3% Selection basis: Lowest price bid for compliant proposals Bidders profile Company/consortium Combine equity: $6+m Subcontracts allowed: Road/platform construction/ infrastructure complementary works Bid follow-up Ref: 18575051-046-08 Release: 18.Dec.08 Site visit: 14.Jan.09 1st clarification meeting: 29.Dec.08 2nd clarification meeting: 12.Jan.09 3rd clarification meeting: 20.Jan.09 5th clarification meeting: 04.Feb.09 6th clarification meeting: 11.Feb.09 (last) Closing: 20.Feb.09 Preliminary revision of proposal packages: 20.Feb.09 Submission & opening: 26.Feb.09 Ruling: 27.Mar.09 Finalizing: 08.Apr.09 Registered bidders 1.Servicios Integrales GSM (Carso) 2.Cryoinfra 3.Industrial Perforadora de Campeche (IPC) 4.BJ Services 5.Parker Drilling 6.D&S Petroleum 7.Nabors 8.Dowell Schlumberger 9.Halliburton 10.Baker Hughes 11.Petrotec 12.Sinopec 13.Wheaterford 14.MI Drilling Fluids 15.Constructora y Perforadora Latina Potential participants ICA Fluor Daniel, Tradeco, Cameron, Turbinas Solar, MI Drilling Fluids, Oilpatch Enterprises, Vetco Gray, ABB, Emerson Process Management Submitted proposals 1.Constructora y Perforadora Latina 2.Halliburton de México 3.Baker Hughes de México - Baker Hughes Operations México - BH Services 4.Weatherford de México 5.PSI Logística y Servicios - Firstdrill Limited - Grupo Constructor Frasisa 6.World Wide Pico - Coastal Drilling Land Company LLC - JPT Consulting and Services 7.Industrial Perforadora de Campeche Status AWARDED Ruling: 27.Mar.09 WEATHERFORD DE MEXICO: $646million Updated 30.Mar.09 16. CHICONTEPEC III [AWARDED] Project Scope: Integrated works/services for drilling & termination of onshore oil fields Location: Veracruz-Puebla Contract Commissioner: Pemex-PEP Term: 1187day Type: Unit prices Front payment: n/a Local content (other than land material): 3% Selection basis: Lowest price bid for compliant proposals Bidders profile Company/consortium Combine equity: $6+m Subcontracts allowed: Road/platform construction/ infrastructure complementary works Bid follow-up Ref: 18575051-044-08 Release: 11.Dec.08 Site visit: 14.Jan.09 1st clarification meeting: 18.Dec.08 2nd clarification meeting: 26.Dec.08 3rd clarification meeting: 09.Jan.09 4th clarification meeting: 16.Jan.09 5th clarification meeting: 23.Jan.09 6th clarification meeting: 30.Jan.09 7th clarification meeting: 09.Feb.09 Closing: 13.Feb.09 Preliminary revision of proposal packages: 13.Feb.09 Submission & opening: 19.Feb.09 Ruling: 10.Mar.09 Finalizing: 01.Apr.09 Registered bidders 1.Andrews Technologies-GWDC 2.D&S Petroleum 3.Industrial Perforadora de Campeche (IPC) 4.Nabors 5.Servicios Integrales GSM (Carso) 6.BJ Services 7.Dowell Schlumberger 8.Halliburton 9.Baker Hughes 10.Petrotec 11.MI Drilling Fluids 12.Constructora y Perforadora Latina 13.Perforaciones Maritimas Mexicanas 14.Zapata Internacional 15.JPT Consulting and Services 16.Wheaterford 17.GL del Centro de Panama 18.Parker Drilling Potential participants ICA Fluor Daniel, Tradeco, Turbinas Solar, Oilpatch Enterprises, Vetco Gray, ABB, Emerson Process Management, Grupo Administrador de Recursos Organizacionales, Cameron, Vetramex, PICO, Cryoinfra Submitted proposals 1. Baker Hughes - B.H Services - Nabors - ARB Arendal 2. Dowell Schlumberger - OFS Servicios- Drillers Technology 3. Halliburton 4. Weatherford Status AWARDED Ruling: 10.Mar.09 Dowell Schlumberger - OFS Servicios - Drillers Technology: $687million Updated 11.Mar.09 15. CHICONTEPEC II [AWARDED] Project Scope: Integrated works/services for expoitation of onshore oil fields Location: Veracruz-Puebla Contract Commissioner: Pemex-PEP Unit prices Term: 4yrs Selection basis: Lowest price bid for compliant proposals Bidders profile Company/consortium Combine equity: $43+m Subcontracts allowed: Bid follow-up Ref: 18575051-050-06 Release: 02.Jan.07 Site visit: 16.Jan.07 1st clarification meeting: 23.Jan.07 2nd clarification meeting: 02.Feb.07 3rd clarification meeting: 09.Feb.07 4th clarification meeting: 15.Feb.07 5th clarification meeting: 21.Feb.07 6th clarification meeting: 22.Feb.07 7th clarification meeting: 21.Mar.07 8th clarification meeting: 02.Apr.07 (last) Closing: 02.May.07 Preliminary revision of proposal packages: 03.May.07 Submission & opening: 08.May.07 Registered bidders 1.D&S Petroleum 2.ICA Fluor Daniel 3.Industrial Perforadora de Campeche (IPC) 4.Servicios Integrales GSM (Carso) 5.Tradeco 6.Baker Hughes 7.Turbinas Solar 8.MI Drilling Fluids 9.Dowell Schlumberger 10.Halliburton 11.Oilpatch Enterprises Potential participants Vetco Gray, ABB, Emerson Process Management Status AWARDED Decision: 13.Jun.07 DOWELL SCHLUMBERGER DE MEXICO: $1395million Updated 25.Jun.07 14. BLOCK EURO [VOID] Project Scope: Gas field development/ infrastructure/ maintenance Location: Burgos basin Contract Commissioner: Pemex-PEP Unit prices Term: 15yrs starting 02.May.07 Selection basis: Lowest price bid for compliant proposals Bidders profile Company/consortium Combine equity: $14+m Subcontracts allowed: Any activity but project management Bid follow-up Ref: 18575110-036-06 Release: 10.Aug.06 Site visit: 24.Aug.06 7th clarification meeting: 12.Jan.07 8th clarification meeting: 26.Jan.07 9th clarification meeting: 15.Feb.07 10th clarification meeting: 21.Feb.07 Deadline for registration: 28.Feb.07 Submission & opening: 06.Mar.07 Decision: 06.Mar.07 Registered bidders 1.Repsol 2.Swecomex 3.Tecpetrol (Techint) 4.PTD (Petrobras) 5.Creatica 6.Cobra 7.EnCana 8.Petrodomos 9.GOIMSA Potential participants Global Drilling Fluids Status Tender declared VOID on 06.Mar.07 A new RFPs to be announced shortly Updated 09.Mar.07 13. BLOCK MONCLOVA [AWARDED] Project Scope: Gas field development/ infrastructure/ maintenance Location: Burgos basin Contract Commissioner: Pemex-PEP Unit prices Term: 15yrs starting 02.May.07 Selection basis: Lowest price bid for compliant proposals Bidders profile Company/consortium Combine equity: $14+m Subcontracts allowed: Any activity but project management Bid follow-up Ref: 18575110-035-06 Release: 10.Aug.06 Site visit: 23.Aug.06 7th clarification meeting: 11.Jan.07 8th clarification meeting: 24.Jan.07 9th clarification meeting: 14.Feb.07 10th clarification meeting: 20.Feb.07 Deadline for registration: 07.Mar.07 Submission & opening: 13.Mar.07 Decision: 22.Mar.07 Registered bidders 1.Repsol 2.PTD (Petrobras) 3.Construcciones Mecanicas de Monclova (COMMSA) 4.Creatica 5.Lewis 6.Minera Carbonifera Rio Escondido (GAN) 7.Coahuila Industrial Minera (GAN) 8.Monclova Pirineos Gas 9.EnCana 10.Perforadora Central Status AWARDED Construcciones Mecanicas de Monclova (COMMSA): $440million Updated 23.Mar.07 12 BLOCK NEJO [AWARDED] Project Scope: Gas field development/ infrastructure/ maintenance Location: Burgos basin Contract Commissioner: Pemex-PEP Unit prices Term: 15yrs starting 02.May.07 Selection basis: Lowest price bid for compliant proposals Bidders profile Company/consortium Combine equity: $14+m Subcontracts allowed: Any activity but project management Bid follow-up Ref: 18575110-034-06 Release: 10.Aug.06 Site visit: 22.Aug.06 7th clarification meeting: 10.Jan.07 8th clarification meeting: 22.Jan.07 9th clarification meeting: 13.Feb.07 10th clarification meeting: 19.Feb.07 Deadline for registration: 21.Feb.07 Submission & opening: 27.Feb.07 Decision: 05.Mar.07 Registered bidders (not comprehensive) 1.Repsol 2.Cobra 3.PTD (Petrobras) 4.Tecpetrol (Techint) 5.Swecomex 6.EnCana 7.Perforadora Central Status AWARDED Grupo Cobra (es): $930million Updated 09.Mar.07 11. PANDURA-ANAHUAC Scope: Gas field development/ infrastructure/ maintenance Location: Burgos basin Term: 15yrs from 14.Jan.05 Contract: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium Combine equity: $10+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-060-04 Release: 29.Jul.04 Submission: 26.Oct.04 Registered bidders: 1.Industrial Perforadora de Campeche (IPC) 2.CNPC Services Venezuela Ltd 3.Monterrey Services and Technology 4.Constructora y Perforadora Latina 5.Itera International Energy Corporation 6.Halliburton de Mexico Decision: 26.Oct.04 WINNER: Industrial Perforadora de Campeche (Mx) - Desarrollo y Servicio Petrolero (Mx)/ $900million/ 15yrs (Updated 27.Oct.04) 10. RICOS Scope: Gas field development/ infrastructure/ maintenance Location: Burgos basin Term: 15yrs from 14.Jan.05 Contract: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium Combine equity: $10+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-061-04 Release: 29.Jul.04 1st Bidders meeting: 07.Sep.04 2nd Bidders meeting: 22.Sep.04 3rd Bidders meeting: 05.Oct.04 4th Bidders meeting: 13.Oct.04 5th Bidders meeting: 25.Oct.04 (next event) Registration deadline: 03.Nov.04 Submission: 09.Nov.04 Registered bidders: 1.Constructora y Perforadora Latina 2.Dowell Schlumberger de Mexico 3.Industrial Perforadora de Campeche (IPC) 4.Itera International Energy Corporation 5.Monterrey Services & Technology Offers disclosure: 11.Nov.04 Decision: 08.Feb.05/ VOID (Updated 14.Oct.04) 9. MONCLOVA Scope: Gas field development/ infrastructure/ maintenance Location: Burgos basin Term: 15yrs from 21.Jan.05 Contract: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium Combine equity: $5+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-064-04 Release: 17.Aug.04 1st Bidders meeting: 06.Oct.04 2nd Bidders meeting: 18.Oct.04 (next event) Registration deadline: 01.Dec.04 Submission: 07.Dec.04 Registered bidders: 1.Hullera Mexicana Potential bidders: 1.Hoper's 2.FIEMSA 3.Technopet 4.CORROSA 5.COIMSA 6.GIMSA Montajes 7.Vetra Group 8.Benchmark Pipeline 9.Cody E Oil Offers disclosure: 09.Dec.04 Decision: 15.Feb.06 WINNER: Hullera Mexicana (Mx) - Energy Milenium (Mx) - Andrews Technologies de Mexico (Mx)- Yuma Exploration (US) - Aries Operating (US)/ $456million/ 15yrs (Updated 16.Feb.05) 8. PIRINEO Scope: Gas field development/ infrastructure/ maintenance Location: Burgos basin Term: 15yrs from 21.Jan.05 Contract: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium Combine equity: $5+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-065-04 Release: 17.Aug.04 1st Bidders meeting: 07.Oct.04 2nd Bidders meeting: 19.Oct.04 (next event) Registration deadline: 08.Dec.04 Submission: 14.Dec.04 Registered bidders: 1.Hullera Mexicana Potential bidders: 1.Andrews Technologies 2.CNPC Services Venezuela Ltd 3.Technopet 4.Benchmark Pipeline International 5.COIMSA 6.GIMSA Montajes 7.Vetra Group Offers disclosure: 16.Dec.04 Decision: 24.Feb.05 WINNER: Constructora Industrial Monclova (Mx) - Materiales La Gloria (Mx) - Alianz Petroleum (Mx) - Steel Serv (Mx) - Suelopetrol (Ve) - NCT (Ve) - Petrotesting Colombia (Co)/ $645million/ 15 yrs (Updated 25.Feb.05) 7. OLMOS Scope: Gas field development/ infrastructure/ maintenance Location: Burgos basin Term: 15yrs from 20.Feb.04 Contract: Unit prices Down payment: n/a Selection basis: Lowest price bid from qualified proposals Bidders profile: Company/consortium Combine equity: $5+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-138-03 Release: 29.Jul.03 Registered bidders: 1.Lewis Energy Group Submission: 14.Jan.04 Offers disclosure/decision: 15.Jan.04 WINNER: Lewis Energy Group $343.6million for 15yrs (Updated 16.Jan.04) 6. FRONTERIZO Scope: Gas field development/ infrastructure/ maintenance Location: Burgos Basin Term: 15yrs from 09.Jan.04 Contract: Unit prices Down payment: n/a Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium Combine equity: $4+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-137-03 Release: 29.Jul.03 Registered bidders: 1.Skanska Mexico 2.D&S Petroleum (sole qualified bidder) 3.Nexen Petroleum International 4.Amistad Energy Corp (disqualified) Submission: 18.Nov.03 Offers disclosure/decision: 19.Nov.03 WINNER: Petroleo Brasileiro Mexico: Petrobras-Teikoku Oil Co-D&S Petroleum (Diavaz) $265million for 15yrs (Updated 19.Nov.03) 5. RICOS Scope: Gas field development/ infrastructure/ maintenance Location: Burgos Basin Term: 20yrs from 09.Jan.04 Contract: Unit prices Down payment: n/a Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium Combine equity: $32.5+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-128-03 Release: 17.Jul.03 Registered bidders: 1.Exxon Mobil 2.Totalfina Oil & Gas Mexique 3.Obrascon Huarte Lain 4.Repsol Exploracion Submission: 12.Nov.03 VOID: No proposals submitted (Updated 13.Nov.03) 4. CORINDON-PANDURA Scope: Gas field development/ infrastructure/ maintenance Location: Burgos Basin Term: 20yrs from 09.Jan.04 Contract: Unit prices Down payment: n/a Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium Combine equity: $71.5+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-131-03 Release: 17.Jul.03 Registered bidders:1.Totalfina Oil and Gas Mexique 2.Repsol Exploracion/YPS 3.D&S Petroleum 4.Halliburton de Mexico 5.Techint Submission: 05.Nov.03 VOID: No proposals submitted (Updated 05.Nov.03) 3. MISION Scope: Gas field development/ infrastructure/ maintenance Location: Burgos Basin Term: 20yrs from 09.Jan.04 Contract: Unit prices Down payment: n/a Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium Combine equity: $10.5+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-130-03 Release: 17.Jul.03 Registered bidders (not comprehensive): 1.Techint (sole actual bidder) 2.Repsol Exploracion/YPS 3.D&S Petroleum 4.Exxon Mobil Mexico 5.Totalfina Oil and Gas Mexique Submission: 29.Oct.03 Offers disclosure/decision: 30.Oct.03 WINNER: Elina del Bajio: Elina-Techint-Industrial Perforadora de Campeche (IPC) $1,036million for 20yrs (Updated 30.Oct.03) 2. CUERVITO Scope: Gas field development/ infrastructure/ maintenance Location: Burgos Basin Term: 15yrs from 09.Jan.04 Contract: Unit prices Down payment: n/a Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $9+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-136-03 Release: 29.Jul.03 Registered bidders (not comprehensive): 1.Techint 2.D&S Petroleum (sole actual bidder) 3.Nexen Petroleum International Submission: 22.Oct.03 Offers disclosure/decision: 23.Oct.03 WINNER: Petrobras/Teikoku Oil Co/D&S Petroleum (Diavaz) $260million for 15yrs (Updated 23.Oct.03) 1. REYNOSA-MONTERREY Scope: Gas field development/ infrastructure/ maintenance Location: Burgos Basin Term: 20yrs from 09.Jan.04 Contract: Unit prices Down payment: n/a Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $43+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-129-03 Release: 17.Jul.03 Registered bidders: 1.Repsol Exploracion/YPS (sole actual bidder) 2.Exxon Mobil Mexico 3.Totalfina Oil and Gas Mexique 4.Halliburton Mexico Submission: 15.Oct.03 Offers disclosure: 16.Oct.03 Decision: 16.Oct.03 WINNER: Repsol Exploracion/YPS $2,437million for 20yrs (Updated 16.Oct.03) PEMEX EXPLORATION & PRODUCTION (PEP)
PIPELINE INTEGRITY PROJECT • System 3 [AWARDED: Norpower-Tecpetrol (Techint) $266million] • System 1: 1500+ km [AWARDED: DMGP Servicios de Integridad (Diavaz - Mexub) $1.3billion for 10yrs] PIPELINE INTEGRITY PROJECT-3 AWARDED Project Description: Scope: a.Network modernization & maintenance (pipeline & facilities) b.Operational technical assistance System 3: Location: Tabasco Veracruz Chiapas Oaxaca Contract Commissioner: Pemex (PEP) Type: MSC (unit prices) Term: 10yrs starting 11.Jan.10 Payment/milestone: Fronting: Selection basis: Best qualified amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $13m+ Experience required: Subcontracting: Everything allowed but project management Bid follow-up Ref: 18575111-003-09 Release: 21.May.09 Site visit: 09.Jun.09 1st clarification meeting: 16.Jun.09 2nd clarification meeting: 25.Jun.09 3rd clarification meeting: 09.Jul.09 2nd site visit: 13-17.Jul.09 4th clarification meeting: 30.Jul.09 5th clarification meeting: 13.Aug.09 6th clarification meeting: 03.Sep.09 Questioning deadline: 14.Oct.09 Closing: 16.Oct.09 Submission & opening: 22.Oct.09 Registered bidders (not comprehensive) 1.EMS Energy Services 2.Oceanografia 3.Techint 4.Fermaca Pipeline del Golfo 5.Promigas 6.ARB Arendal 7.ACS Potential participants Dresser, Gasintecsa, Gasoductos y Estructuras del Norte, Petrolera Mixcoac, Servicios Marinos y Terrestres, DMGP, Dragados, Grupo Olimpo, Diavaz, Siemens, Schrader Camargo, Condux (Protexa), Global Offshore, Itochu, Williams International Company, Construcciones Integrales del Carmen, Edison Chovest Offshore, Evya, Greystar, Penspen, Tecno R, Tenaris, Dica, Deep Ocean, Tradeco, Ecomex, Marcos y Asociados, Bureau Veritas Status AWARDED Ruling: 05.Nov.09 Norpower-Tecpetrol (Techint): $266million Updated 10.Nov.09 PIPELINE INTEGRITY PROJECT-1 [AWARDED] Project Description: Scope: a.Network modernization & maintenance (pipeline & facilities) b.Operational technical assistance System 1: 1500+ km Location: on/offshore Tabasco and Campeche Contract Commissioner: Pemex (PEP) Type: MSC (unit prices) Term: 10yrs starting 04.May.09 Payment/milestone: Fronting: Selection basis: Best qualified amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $55m+ Experience required: Subcontracting: Everything allowed but project management Bid follow-up Ref: 18575111-002-08 Release: 06.Mar.08 Site visit: 25.Mar.08 1st clarification meeting: 01.Apr.08 11th clarification meeting: 04.Sep.08 Questioning deadline: 17.Feb.09 Closing: 19.Feb.09 Submission & opening: 25.Feb.09 Ruling: 11.Mar.09 Contract: 10.Apr.09 Registered bidders (not comprehensive) 1.Diavaz 2.Siemens 3.Oceanografia 4.Condux (Protexa) 5.Global Offshore 6.Itochu 7.Williams International Company 8.Construcciones Integrales del Carmen Potential participants Edison Chovest Offshore, Evya, Greystar, Penspen, Tecno R, Tenaris, Dica, Deep Ocean, Tradeco, Ecomex, Marcos y Asociados, Bureau Veritas Status AWARDED DMGP Servicios de Integridad [Grupo Diavaz (51%) - Mexub (47%) - Grey Star (1%) - Penspen Group (1%)]: $1.3billion for 10yrs Updated 11.Mar.09 PEMEX GAS & BASIC PETROCHEMICAL (PGPB)
MODULAR CRYOGENIC PROJECT [AWARDED] Project Description: First of 3 modules that includes: 1.Recovery/ cracking (ISBL) 2.Integration/ auxiliary services/ product handling/ storage (OSBL) Capacity: 200mcfd Location: Gas process complex in Poza Rica, Veracruz Contract Commissioner: Pemex Gas PGPB (Govt) Type: Mixed lump sum/unit prices Term: 720 days starting 18.May.09 Project's budget for 2009: $58million Down payment: 30% of annual budget Selection basis: Best qualified amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Comprehensive experience (EPCC) in at least one oil/gas process plant It should include processes for recovery and cracking of liquids from natural gas Budget $200million+ Built within the last 5-year period and currently in operation Combine equity: $11m+ Bid follow-up Ref: 18572039-011-08 Release: 23.Dec.08 Site visit: 16.Jan.09 1st clarification meeting: 22.Jan.09 2nd clarification meeting: 28.Jan.09 3rd clarification meeting: 04.Feb.09 4th clarification meeting: 18.Feb.09 5th clarification meeting: 25.Feb.09 Questioning deadline: 04.Mar.09 6th clarification meeting: 06.Mar.09 7th clarification meeting: 13.Mar.09 8th clarification meeting & closing: 20.Mar.09 Submission & opening: 26.Mar.09 Ruling: 18.May.09 Registered bidders 1.ICA Fluor Daniel 2.Uhde 3.Cicsa 4.Tubinas Solar 5.Samsung 6.Saimex 7.Spisa 8.Sadeven 9.Exterran Energy 10.Siemens 11.Hegues 12.Techint Potential co-bidders Isolux, IEE, Senermex, Gutsa, Dragados, Lockwood Greene, Inelectra, Skanska, Jantesa, Areva T&D, Synercon, Elliot Co, Grupo R, ABB, Thales, Aritas, Automation & Control, Energy Connection, Yokogawa, Vica Submitted proposal 1.ICA Fluor Daniel - Linde Process Plants Status AWARDED ICA Fluor Daniel - Linde Process Plants: $270million Updated 19.May.09 MODULAR CRYOGENIC PROJECT [AWARDED] Project Description: Modular cryogenic units 5 & 6, LPG/gasoline terminal, auxiliary services and integration to the gas process complex Location: Burgos gas process complex in Reynosa, Tamaulipas Scope: Basic & detailed engineering/ permitting/ procurement/ construction/ installation/ tests/ training/ commissioning/ As-built documentation Contract Commissioner: Pemex Gas PGPB (Govt) Type: Mixed lump sum/unit prices Term: 741 days starting 15.Jan.07 Selection basis: Best qualified amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Comprehensive experience in at least two similar projects ISO 9001 certified Combine equity: $50m+ Bid follow-up Ref: 18572039-001-06 Release: 19.Sep.06 Site visit: 26.Sep.06 8th clarification meeting: 16.Nov.06 (last) Deadline for registration: 24.Nov.06 Submission & opening: 30.Nov.06 Decision: 22.Dec.06 Finalizing: 12.Jan.07 Registered bidders 1.Gutsa 2.ICA Fluor Daniel 3.Dragados 4.Lockwood Greene 5.Techint 6.Tubinas Solar 7.Inelectra 8.Skanska 9.Jantesa 10.Siemens 11.Areva T&D 12.Synercon 13.Invensys 14.Alcatel Potential co-bidders Elliot Co, Grupo R, ABB, Aritas Status AWARDED ICA Fluor Daniel: $275million (Updated 26.Jan.07) PEMEX GAS & BASIC PETROCHEMICAL (PGPB)
COGENERATION PLANT NUEVO PEMEX [AWARDED] Contract Location: Gas processor complex: Nuevo Pemex, Tabasco Commissioner: Pemex Gas & Basic Petrochemical (Govt) Scope: Service contract for steam & power delivery out of water & gas supplied by Pemex Pemex water supply: 800 m tons/hour +2.5% Pemex gas supply: 110 mcfd (42kg/cm2) Steam flow delivery: 550-800 m tons/hour Power capacity (summer conditions): 300 Mw +/-15% Construction term: 3yrs Service term: 20yrs Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $50m+ Local content: 25% Bid follow-up Ref: 18577001-036-08 Release: 28.Aug.08 Site visit: 18-19.Sep.08 1st Clarification meeting: 16.Oct.08 2nd Clarification meeting (questioning): 12.Jan.09 2nd Clarification meeting (responses): 12.Feb.09 3rd Clarification meeting (questioning): 01.Apr.09 3rd Clarification meeting (responses): 20.May.09 4th Clarification meeting (questioning): 26.May.09 4th Clarification meeting (responses): 08.Jun.09 5th Clarification meeting (questioning): 16.Jul.09 5th Clarification meeting (responses): 30.Jul.09 6th Clarification meeting (questioning): 03.Aug.09 6th Clarification meeting (responses): 06.Aug.09 Closing: 06.Aug.09 Proposal submission & opening: 12.Aug.09 Registered bidders 1.ABB 2.Abengoa 3.Abener 4.ARB Arendal 5.Areva T&D 6.CEGELEC 7.Cobra 8.Dalkia 9.Dragados 10.Duke Energy 11.Endesa 12.GE 13.Iberdrola 14.ICA Fluor Daniel 15.Kepler Constructora 16.Marubeni 17.Mitsubishi 18.Mitsui 19.SAPI 20.Saveden 21.Siemens 22.Suez 23.Techint 24.Prolec 25.GE 26.Santander Bank 27.ContourGlobal Potential participants Fenosa, Sener, Elecnor, AES North America Development, AES Tamuin SLP, Isolux, Acciona, Idom Ingenieria, Socoin, Banamex, Quintana Capital, Honeywell, Emerson Process, Mexico Constructora Industrial, Tradeco, URS, Temura Submitted proposals 1.Abengoa-Abener 2.Dragados-ACS-Cobra Status AWARDED Ruling: 31.Aug.09 Abengoa-Abener: $0.4225Kw/hr Updated 01.Sep.09 PEMEX REFINATION (PR)
INTEGRAL PROGRAM FOR CLEAN FUELS SULPHUR RECOVERY PLANT SRU-2 [VOID] Projects Description: 100 TPD in two lines (50+50) Location: Minatitlan refinery complex Scope: Engineering (in agreement with Worley Parsons license) Procurement Construction Integration Commissioning Construction term: 630 days Selection basis: Lowest price bid amongst compliant proposals Local content: 10% Contracts Commissioner: Pemex PR (Govt) Type: Combined lump sum & unit prices Payment/milestone: Fronting: 15.25% of budget for 2010 Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from any country Experience required: Design and construction of similar industrial plants Combine equity: $25+ (330million local currency) Bid follow-up Ref: 18576012-021-10 Release: 06.May.10 Site visit: 11.May.10 1st Clarification meeting: 14.May.10 2nd Clarification meeting: 28.May.10 3rd Clarification meeting: 11.Jun.10 4th Clarification meeting: 25.Jun.10 5th Clarification meeting: 12.Jul.10 Preliminary revision: (highly recomended) Proposal submission & opening: 20.Jul.10 Registered bidders 1.DOUBLE V HOLDING 2.CONIP CONTRATISTAS 3.ARENDAL 4.ABB 5.GRUPO DE INGENIERIA CAPRICORNIO 6.OHL INDUSTRIAL 7.COIMSUR 8.CHEMISA 9.TRADECO INDUSTRIAL 10.TECNINT 11.AUTOMATION AND CONTROL SOLUTIONS 12.COPESA 13.CONSTRUCTORA ATZCO 14.LIPSA INDUSTRIAL 15.INELECTRA NORTH AMERICA Potential participants Status VOID Tender declared nul on 09.Sep.10 A new RFPs to be announced shortly Updated 10.Sep.10 EXPERT ENGINEERING SERVICES (Diesel Phase) [AWARDED] Scope: 1.Supervision of FEED for diesel desulphurization plants 2.Bid documentation for tendering the IPC contracts for these projects 3.Basic engineering for plant integration and auxiliary services 4.Coordination with projets for naphta desulphurization (below) Location: Pemex refineries of Tula, Salamanca, Madero, Minatitlan, Salina Cruz & Cadereyta Term: 570 days starting 16.Nov.09 Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $1.5m+ (20m+ local currency) Contract Type: Unit prices Down payment: 50% annually budget for 2009 Selection basis: Lowest price bid from compliant proposals Local content: n/a Subcontracts allowed: n/a Bid follow-up Ref: 18572039-006-09 Release: 25.Aug.09 Site visit: n/a 1st clarification meeting: 02.Sep.09 2nd clarification meeting: 09.Sep.09 3rd clarification meeting: 15.Sep.09 4th clarification meeting: 23.Sep.09 5th clarification meeting: 02.Oct.09 6th clarification meeting & questioning deadline: 07.Oct.09 Closing: 13.Oct.09 Submission & opening: 19.Oct.09 Registered bidders 1.Conip 2.Jacobs 3.Inelectra 4.CH2M Hill International 5.Technip 6.Spisa 7.Norcontrol 8.SGS 9.ABS 10.Jantesa Potential participants Status AWARDED Ruling: 17.Nov.09 Inelectra North America: $25million Updated 27.Nov.09 SALINA CRUZ & MINATITLAN UNITS [AWARDED] Projects Description: Naphta desulphurization units (2) Location: Salina Cruz & Minatitlan refinery complexes Scope: Engineering Procurement Construction Integration Capacitiy 1.Salina Cruz: 2.Minatitlan: Construction term: 1290 days starting 19.Mar.10 Selection basis: Lowest price bid amongst compliant proposals Local content: Contracts (2) Commissioner: Pemex PR (Govt) Type: Combined lump sum & unit prices Payment/milestone: Fronting: 30% annually budget every year Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Company/consortium from countries having a free trade agreement with Mexico Experience required: 1.Successful EPC contracts for hydrocarbon process projects up to $200m+ in the last 5 years 2.It should include at least a catalitic reaction and/or a destilation process currently in operation Combine equity: $75m+ (1 billion Pesos) Bid follow-up Ref: 18572039-005-09 Release: 28.Jul.09 Site visit: 12-13.Aug.09 1st Clarification meeting: 19.Aug.09 2nd Clarification meeting: 28.Aug.09 3rd Clarification meeting: 10.Sep.09 4th clarification meeting: 25.Sep.09 5th clarification meeting: 09.Oct.09 6th clarification meeting: 23.Oct.09 7th clarification meeting: 06.Nov.09 8th clarification meeting: 20.Nov.09 9th clarification meeting: 04.Dec.09 Questioning deadline & 10th clarification meeting: 18.Dec.09 11th clarification meeting: 30.Dec.09 Closing: 09.Jan.10 Proposal submission & opening: 15.Jan.10 Registered bidders 1.ACS 2.ICA Fluor Daniel 3.Spisa 4.Technip 5.Sener 6.Sadeven 7.OHL 8.ABB Italia-ABB Mexico 9.Siemens 10.Isolux 11.Samsung 12.Techint 13.Spisa 14.Mitsui 15.ARB Arendal 16.Tecnimont Potential participants Ruhrpumpen, ISA, Automation & Control, Emerson, SK Engineering & Construction, Vica, Thales, Barlett, Integracion de Sistemas de Actuacion, Invensys, Automation & Control Solutions, Pepperl+Fuchs, Ingersoll Rand Actual proposals 1.Technip Italy/ Technip de México/ Isolux Ingeniería/ Isolux de México 2.Saipem/ Saigut 3.ICA Flour Daniel 4.ACS Servicios, Comunicaciones y Energía México/ Dragados Industrial/ ACS Servicios, Comunicaciones y Energía/ Senermex Ingeniería y Sistemas 5.ABB/ ARB Arendal/ Worley Parsons México Ingeniería 6.Tecnimont/ Grupo Samsung Ingeniería de México Status AWARDED Ruling: 25.Feb.10 ICA Fluor Daniel: $624million (contact info by request) Updated 26.Feb.10 CADEREYTA & MADERO UNITS [AWARDED] Projects Description: Naphta desulphurization units (2) Location: Cadereyta & Madero refinery complexes Scope: Engineering Procurement Construction Integration Capacitiy 1.Cadereyta: 2.Madero: Construction term: 1320 days starting 21.Sep.09 Selection basis: Lowest price bid amongst compliant proposals Local content: Contracts (2) Commissioner: Pemex PR (Govt) Type: Combined lump sum & unit prices Payment/milestone: Fronting: 30% annually budget every year Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Company/consortium from countries having a free trade agreement with Mexico Experience required: 1.Successful EPC contracts for hydrocarbon process projects up to $200m+ in the last 5 years 2.It should include at least a catalitic reaction and/or a destilation process currently in operation Combine equity: $75m+ (1 billion Pesos) Bid follow-up Ref: 18572039-001-09 Release: 12.Feb.09 Site visit: 23-24.Feb.09 1st Clarification meeting: 05.Mar.09 2nd Clarification meeting: 20.Mar.09 3rd Clarification meeting: 03.Apr.09 4th Clarification meeting: 17.Apr.09 5th Clarification meeting: 30.Apr.09 6th Clarification meeting: 15.May.09 7th Clarification meeting: 29.May.09 8th Clarification meeting: 12.Jun.09 9th Clarification meeting: 19.Jun.09 10th Clarification meeting: 26.Jun.09 11th Clarification meeting: 30.Jun.09 12th Clarification meeting: 07.Jul.09 Questioning deadline: 12.Jul.09 13th Clarification meeting & closing: 14.Jul.09 Proposal submission & opening: 20.Jul.09 Registered bidders 1.Inelectra North America 2.Technip 3.Saimex 4.Spisa 5.Cicsa 6.Sener 7.Sadeven 8.ICA Fluor Daniel 9.Jantesa 10.ABB 11.Tecnicas Reunidas 12.Hegues 13.Techint 14.Siemens 15.GS Engineering and Construction Corp 16.Prolec GE 17.ARB Arendal Potential participants Consutec, K Tronix, Samsung, Uhde, Dragados, Siemens, Isolux, SK Engineering & Construction, Termotecnia, Sojitz, OHL Industrial, Solucion, Emerson, Therom, Invensys, Automatizacion y Control, Peper LT Fuchs, Automation & Control, K Tronix, Reciptech, Rockwell, Vica, Analitica, Thales, Yokogawa, Sulzer Chemtech, Thales, Kentech ME&I, Setemi, Sapi, Idom, Galcor, Ruhrpumpen, GEA, Orben, Dupont Status AWARDED Ruling: 21.Aug.09 ICA Fluor Daniel: $638million (contact info by request) Updated 21.Aug.09
TULA & SALAMANCA UNITS [VOID] Projects Description: Naphta desulphurization units (2) Location: Tula & Salamanca refinery complexes Scope: Engineering Procurement Construction Integration Capacitiy 1.Tula: 2.Salamanca: Construction term: 45 months (1350 days) starting 25.May.09 Selection basis: Lowest price bid amongst compliant proposals Local content: Contracts (2) Commissioner: Pemex PR (Govt) Type: Combined lump sum & unit prices Payment/milestone: Fronting: n/a Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $90m+ (1 billion Pesos) Bid follow-up Ref: 18572039-006-08 Release: 11.Sep.08 Site visit: 18-19.Sep.08 1st Clarification meeting: 25.Sep.08 16th Clarification meeting: 19.Mar.09 Questioning deadline: 22.Mar.09 17th Clarification meeting and closing: 24.Mar.09 Proposal submission & opening: 30.Mar.09 Ruling: 29.Apr.09 Registered bidders 1.Jantesa 2.Sadeven 3.Samsung 4.ABB 5.ICA Fluor Daniel 6.Hegues 7.Saimex 8.Sener 9.Dragados 10.Siemens 11.Isolux 12.SK Engineering & Construction 13.CICSA 14.Termotecnica 15.Techint 16.Sojitz 17.OHL Industrial 18.Inelectra North America 19.Prolec GE 20.SAPI Potential participants Solucion, Emerson, Therom, Invensys, Automatizacion y Control, Peper LT Fuchs, Automation & Control, K Tronix, Reciptech, Rockwell, Vica, Analitica, Thales, Yokogawa, Schrader Camargo Submitted proposals 1.Samsung Engineering Co 2.Saimexicana - Saipem 3.ICA Fluor Daniel 4.Isolux - Jantesa 5.ACS Servicios Comunicaciones y Energía - Dragados Industrial - ASC Servicios Comunicaciones y Energía México - Senermex Ingeniería y Proyectos - Proyectos y Desarrollo de Infraestructura Status VOID Tender declared VOID on 28.May.09 A new RFPs to be announced shortly Updated 29.May.09 SULPHUR RECOVERY PLANT SRU-2 (3rd round) [AWARDED] Project Description: 80 TPD for first line A & preparations for line B Location: Salamanca refinery complex Scope: Engineering Procurement Construction Integration Construction term: 540 days starting 16.Mar.10 Selection basis: Lowest price bid amongst compliant proposals Local content: 10% Contracts (2) Commissioner: Pemex PR (Govt) Type: Combined lump sum & unit prices Payment/milestone: Fronting: 15.25% annually budget for 2010 Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from any country Experience required: Design and construction of similar industrial plants Combine equity: $25+ (330million local currency) Bid follow-up Ref: 18576173-044-09 Release: 10.Dec.09 Site visit: 17.Dec.09 1st Clarification meeting: 18.Dec.09 2nd Clarification meeting: 30.Dec.09 3rd Clarification meeting: 13.Jan.10 4th Clarification meeting & questioning deadline: 27.Jan.10 Closing: 29.Jan.10 Proposal submission & opening: 04.Feb.10 Registered bidders 1.Lipsa 2.SAPI 3.Conip 4.Linde 5.Synergy Baruk 6.Inelectra 7.Spisa 8.Jantesa 9.Techint 10.Abengoa 11.Coimsur 12.Isolux Potential participants See reference ternders below Status AWARDED Ruling: 16.Mar.10 Isolux de Mexico (Isolux Corsan): $47million Updated 19.Mar.10 SULPHUR RECOVERY PLANT SRU-2 (2nd round) [VOID] Projects Description: 160 TPD in two lines Location: Salamanca refinery complex Scope: Engineering Procurement Construction Integration Construction term: 540 days starting 26.Aug.09 Selection basis: Lowest price bid amongst compliant proposals Local content: 10% Contracts (2) Commissioner: Pemex PR (Govt) Type: Combined lump sum & unit prices Payment/milestone: Fronting: 15.25% annually budget every year Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from any country Experience required: Design and construction of similar industrial plants Combine equity: $25+ (330million local currency) Bid follow-up Ref: 18576173-020-09 Release: 23.Apr.09 Site visit: 04.May.09 1st Clarification meeting: 07.May.09 2nd Clarification meeting: 12.May.09 2nd Site visit: 15.May.09 3rd Clarification meeting: 18.May.09 4th Clarification meeting: 25.May.09 5th Clarification meeting: 01.Jun.09 6th Clarification meeting: 06.Jun.09 7th Clarification meeting: 19.Jun.09 8th Clarification meeting: 03.Jul.09 Questioning deadline: 05.Jul.09 Closing: 07.Jul.09 Proposal submission & opening: 13.Jul.09 Registered bidders 1.Conip 2.ICA Fluor Daniel 3.Schrader Camargo 4.Coimsur 5.Inelectra North America 6.Samsung Engineering 7.ARB Arendal 8.Jantesa 9.Linde 10.Abengoa 11.Coopsa 12.Lipsa 13.Techint 14.OHL Industrial 15.Technip 16.Saimex 17.Spisa Potential participants Emerson, Man Ferrostaal, K Tronix, Siemens, Shands & Jurds, Areche, Tradeco, SK Engineering and Construction, Atzco, Automation and Control, Tyler, Peperl + Fuchs, Ingersoll Rand, Galcor, Vica, CDI Status VOID Tender declared void on 28.Aug.09 A new RFPs should be announced shortly Updated 04.Sep.09 Ref: SULPHUR RECOVERY PLANT SRU-2 [CANCELED] Projects Description: 160 TPD in two lines Location: Salamanca refinery complex Scope: Engineering Procurement Construction Integration Construction term: 589 days starting 06.Jul.09 Selection basis: Lowest price bid amongst compliant proposals Local content: 10% Contracts (2) Commissioner: Pemex PR (Govt) Type: Combined lump sum & unit prices Payment/milestone: Fronting: 15.25% annually budget every year Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from any country Experience required: Design and construction of similar industrial plants Combine equity: $23+ (330million local currency) Bid follow-up Ref: 18576173-013-09 Release: 12.Mar.09 Site visit: 17.Mar.09 1st Clarification meeting: 19.Mar.09 Potential participants (for the record) 1.ICA Fluor Daniel 2.Samsung 3.ARB Arendal 4.Tradeco 5.Abengoa 6.Conip 7.OHL 8.Inelectra Noth America 9.SK Engineering and Construction 10.Techint 11.Inelectra 12.Linde 13.Jantesa Status CANCELED Tender declared CANCELED on 17.Mar.09 Normally a new RFPs should be announced later Updated 20.Mar.09 ____________________________________ MINATITLAN REFINERY EXPANSION 6. Alkylation plants (huels & hf) [AWARDED] Project: Minatitlan refinery expansion (6) Name: Lazaro Cardenas Location: Minatitlan Veracruz Scope: Engineering procurement construction Subcontracts allowed: Civil works/ instrumentation & control/ electric works/ pipes Term: 1002 days from 14-Feb-05 to 12-Nov-07 Contract: Mix lump sum/unit prices Mexican content: 25% Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from any country Combine equity: US$22m+ Previous contract: A US$35m+ industrial plant Bid follow-up Ref: 18572039-016-03 Release: 30-Dec-03 Submission: 15-Nov-04 Registered bidders: 1.SAMSUNG INGENIERIA Y CONSTRUCCIÓN 2.SK ENGINEERING & CONSTRUCTION CO 3.OBRAS PORTUARIAS DE COATZACOALCOS 4.ICA FLUOR DANIEL 5.EMERSON PROCESS MANAGEMENT 6.SIEMENS 7.TECNICAS REUNIDAS 8.SAMSUNG ENGINEERING CO 9.HONEYWELL 10.GUTSA INFRAESTRUCTURA 11.EARTH TECH MEXICO 12.CONSTRUTORA NORBERTO ODEBRECHT 14.FLOWSERVE 15.BOMBAS INTERNACIONALES MEXICANAS 16.SNAMPROGETTI 17.CONSTRUCTORA BAY DE MEXICO 18.INVENSYS SYSTEMS MEXICO 19.PROLEC GE 20.TECHNIP ITALY Decision: 12-Jan-05 Samsung Engineering Co $154million (Updated 21-Jan-05) 5. Fuel hydro-desulfuration/ Hydrogen/ Sulfur recovery plants [AWARDED] Project: Minatitlan refinery expansion (5) Name: Lazaro Cardenas Location: Minatitlan Veracruz Scope: Engineering procurement construction Subcontracts allowed: Civil works/ instrumentation & control/ electric works/ pipes Term: 1064 days from 08-Feb-05 to 07-Jan-08 Contract: Mix lump sum/unit prices Mexican content: 25% Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from any country Combine equity: US$45m+ Previous contract: A US$70m+ industrial plant Bid follow-up Ref: 18572039-015-03 Release: 30-Dec-03 Submission: 08-Nov-04 Registered bidders: 1.SAMSUNG INGENIERIA Y CONSTRUCCIÓN 2.SK ENGINEERING & CONSTRUCTION CO 3.OBRAS PORTUARIAS DE COATZACOALCOS 4.ICA FLUOR DANIEL 5.EMERSON PROCESS MANAGEMENT 6.UDHE DE MÉXICO 7.SIEMENS 8.FERROSTAAL MEXICO 9.LIPSA INDUSTRIAL 10.TECHINT 11.SKANSKA MEXICO 12.TECNICAS REUNIDAS 13.SAMSUNG ENGINEERING 14.DICA 15.KEPLER CONSTRUCTORA 16.HONEYWELL 17.TECHNIP ITALY 18.DRAGADOS PROYECTOS INDUSTRIALES DE MEXICO 19.EARTH TECH MEXICO 20.FLOWSERVE 21.CONSTRUTORA NORBERTO ODEBRECHT 22.BOMBAS INTERNACIONALES MEXICANAS 23.CONDUCTORES MONTERREY 24.SNAMPROGETTI 25.CONSTRUCTORA BAY DE MEXICO 26.PROLEC GE 27.INVENSYS SYSTEMS MEXICO 28.INGERSOLL RAND 29.INDUSTRIAS JOHN CRANE DE MÉXICO 30.LINDE BOC PROCESS PLANTS LLC 31.TVC NACIONAL DE MÉXICO 32.GUTSA INFRAESTRUCTURA 33.SMAR MEXICO Decision: 05-Jan-05 Tecnicas Reunidas (Spain) - Construtora Norberto Odebrecht (Brazil) - Rio San Juan Construcciones (Grupo R) (Mexico) $317million (Updated 21-Jan-05) 4. Coking/ Regeneration (DEA)/ Naphtha hydro-desulfuration plants [AWARDED] Project: Minatitlan refinery expansion (4) Name: Lazaro Cardenas Location: Minatitlan Veracruz Scope: Engineering procurement construction Term: 1128 days from 01-Feb-05 to 04-Mar-08 Contract: Mix lump sum/unit prices Mexican content: 25% Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from any country Combine equity: US$51m+ Subcontracts allowed: Civil works/ instrumentation & control/ electric works/ pipes Bid follow-up Ref: 18572039-012-03 Release: 25-Nov-03 Submission: 05-Nov-04 Registered bidders: 1.SK ENGINEERING AND CONSTRUCTION CO 2.DRAGADOS, PROYECTOS INDUSTRIALES DE MÉXICO 3.WORTHINGTON DE MÉXICO 4.FOSTER WHEELER USA 5.FLOWSERVE 6.EMERSON PROCESS MANAGEMENT 7.SIEMENS 8.GIMSA CONSTRUCCIONES INDUSTRIALES 9.MITSUBISHI HEAVY INDUSTRIES 10.AXIS INDUSTRIAL 11.HONEYWELL 13.ICA FLUOR DANIEL 14.SULZER CHEMTECH 15.NUOVO PIGNONE 16.TECNICAS REUNIDAS 17.INVENSYS SYSTEMS MEXICO 18.PROLEC GE 19.SMAR MEXICO 20.TECHNIP ITALY Decision: 03-Jan-05 Tecnicas Reunidas (Spain) - Construtora Norberto Odebrecht (Brazil) - Rio San Juan Construcciones (Grupo R) (Mexico) $317million (Updated 21-Jan-05) 3. Combine/Diesel hydro-desulfuration/FCC plants [AWARDED] Project: Minatitlan refinery expansion (3) Name: Lazaro Cardenas Location: Minatitlan Veracruz Scope: Engineering procurement construction Term: 1128 days from 08-Nov-04 to 10-Dec-07 Contract: Mix lump sum/unit prices Mexican content: 25% Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from any country Combine equity: US$75m+ Subcontracts allowed: Civil works/ instrumentation & control/ electric works/ pipes Bid follow-up Ref: 18572039-011-03 Release: 21-Oct-03 Submission: 13-Aug-04 Registered bidders: 1.SK ENGINEERING & CONSTRUCTION CO 2.ICA FLUOR DANIEL 3.DRAGADOS PROYECTOS INDUSTRIALES DE MEXICO 4.OBRAS PORTUARIAS DE COATZACOALCOS 5.UHDE MÉXICO 6.CONSTRUTORA NORBERTO ODEBRECHT 7.TECHINT 8.GIMSA CONSTRUCCIONES INDUSTRIALES 9.FERROSTAAL MÉXICO 10.SNAMPROGETTI 11.TECHNIP FRANCE 12.EDEMTEC 13.LURGUI MEXICANA 14.INTERNOS Y EQUIPOS DE TRANSFERENCIA 15.GUTSA INFRAESTRUCTURA 16.EMERSON PROCESS MANAGEMENT 17.TOYO ENGINEERING CORPORATION 18.SULZER CHEMTECH 19.SHAW MEXICAN HOLDINGS 20.DURO FELGUERA 21.TECNICAS REUNIDAS 22.AUTOMATIZACIÓN Y MODERNIZACIÓN INDUSTRIAL 23.FLOWSERVE 24.INGENIERÍA Y PROYECTOS DE CONTROL DE MONTERREY 25.SCHNEIDER ELECTRIC MÉXICO 26.KEPLER CONSTRUCTORA 27.WORTHINGTON DE MÉXICO 28.FOSTER WHEELER IBERIA 29.SAMSUNG INGENIERÍA Y CONSTRUCCIÓN 30.FOSTER WHEELER MEXICANA 31.HONEYWELL 32.NOUVO PIGNONE 33.SIEMENS 34.LIPSA INDUSTRIAL 35.GBC INGENIEROS Y CONTRATISTAS 36.CONDUCTORES MONTERREY 37.DICA 38.PROLEC GE 39.INVENSYS SYSTEMS MEXICO 40.THERMON LATINOAMERICANA Decision: 22-Sep-04 Dragados Proyectos Industriales de Mexico-Dragados Industrial (Spain) $534million (Updated 24-Sep-04) 2. Auxiliary services & sour water plants and integration works [AWARDED] Project: Minatitlan refinery expansion (2) Name: Lazaro Cardenas Location: Minatitlan Veracruz Scope: Engineering procurement construction Term: 1290 days from 27-Sep-04 to 08-Apr-08 Contract: Mix lump sum/unit prices Mexican content: 25% Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from any country Combine equity: US$69.5m+ Subcontracts allowed: CFE link substation/ distribuited control system/ deep foundations/ telecommunication systems/ cooling towers/ railroads/ 3-D electronic simulation/ turbogenerator/ engineering Bid follow-up Ref: 18572039-007-03 Release: 18-Sep-03 Submission: 28-Jul-04 Registered bidders: 1.ICA FLUOR DANIEL 2.DURO FELGUERA 3.SIEMENS 4.TECHINT 5.SK ENGINEERING & CONSTRUCTION CO 6.ABENGOA MÉXICO 7.ALSTOM T&D 8.CONSTRUCTORA EVEREST 9.HONEYWELL 10.CONSTRUCTORA BAY DE MÉXICO 11.CERREY 12.CONSTRUCCIONES Y TRITURACIONES 13.CONDUCTORES MONTERREY 14.SULZER PUMPS MÉXICO 15.EMERSON PROCESS MANAGEMENT 16.ABB MÉXICO 17.EARTH TECH MÉXICO 18.SKANSKA MÉXICO 19.CHINA HUANQIU CONTRACTING & ENGINEERING CORPORATION 20.GUTSA INMOBILIARIA 21.GIMSA CONSTRUCCIONES INDUSTRIALES 22.ELECNOR 23.VATECH TRANSMISIÓN Y DISTRIBUCIÓN 24.OBRAS PORTUARIAS DE COATZACOALCOS 25.UDRA INDUSTRIAL 26.SADEVEN INDUSTRIAS 27.SHAW MEXICAN HOLDINGS 28.PROLEC GE 29.AUTOMATIZACIÓN Y MODERNIZACIÓN INDUSTRIAL 30.TECHNIP ITALY 31.INVENSYS SYSTEMS MÉXICO 32.INGENIERÍA Y PROYECTOS DE CONTROL DE MONTERREY 33.SINERGIA SOLUCIONES INTEGRALES PARA LA CONSTRUCCIÓN 34.MITSUBISHI CORPORATION 35.EDEMTEC 36.FLOWSERVE 37.TELVENT MÉXICO 38.COMPANÍA CONTRATISTA NACIONAL 39.KEPLER CONSTRUCTORA 40.NOUVO PIGNONE 41.EQUIPOMEX 42.KELLER CIMENTACIONES DE LATINOAMÉRICA 43.SMAR MÉXICO 44.THERMON LATINOAMERICANA 45.BOMBAS CONSTRUCCIONES Y EQUIPOS DEL CENTRO 46.INGERSOLL RAND 47.SIMPSA INGENIERIA 48.3M MEXICO Decision: 14-Sep-04 ICA Fluor Daniel $684million (Updated 17-Sep-04) 1. Access road & site civil works Project: Minatitlan refinery expansion (1) Name: Lazaro Cardenas Location: Minatitlan Veracruz Scope: Engineering procurement construction Term: 600 days from 08-Dec-03 to 29-Jul-05 Contract: Unit prices Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium Combine equity: US$15m+ Subcontracts allowed: Pile driving and dredging Bid follow-up Ref: 18572039-003-03 Release: 29-May-03 Submission: 03-Sep-03 Offers disclosure: 03-Oct-03 Decision: 22-Oct-03 WINNER: Tradeco Infraestructura $34million (Updated 01-Nov-03) PEMEX PETROCHEMICAL (PP) ETHYLENE PLANT EXPANSION
ETHYLENE PLANT EXPANSION (2nd phase) (2nd round) [VOID] Project Description: Scope: EPC Petrochemical complex: Morelos Location: Coatz, Veracruz Contract Commissioner: Pemex Petrochemical (Govt) Type: Combined lump sum & unit prices Term: 1016 days starting 07.Jul.08 Payment/milestone: Fronting: 30% of yearly budget Selection basis: Best qualified amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $70m+ Experience required: Successful EPC contracts for hydrocarbon process projects up to $70m+ in the last 5 years Bid follow-up Ref: 18572039-003-08 Release: 18.Mar.08 Site visit: 26.Mar.08 1st clarification meeting: 28.Mar.08 8th clarification meeting: 16.May.08 Closing: 17.May.08 Submission & opening: 23.May.08 Ruling: 06.Jun.08 (next) Finalizing: 23.Jun.08 Registered bidders (not comprehensive) 1.Swecomex 2.ICA Fluor Daniel 3.Proyectos y Desarrollos de Infraestructura 4.Saimexicana Potential participants Techint, Dragados, CIMISA, Gutsa, Abengoa, Tradeco, Siemens, Conip, Jantesa, Senermex, Skanska, Koch-Glitsch, Sener, ARB Arendal, Chemisa, Areva, Elliot, Vica, Flowserve, Silzer Chemtech Status VOID Tender declared VOID (2nd round) on 28.May.08 A new RFPs to be announced shortly Updated 06.Jun.08 ETHYLENE PLANT EXPANSION (2nd phase) [TERM EXPANDED & EXPERIENCE MODIFIED] [VOID] Project Description: (to be posted) Scope: EPC Petrochemical complex: Morelos Location: Coatz, Veracruz Contract Commissioner: Pemex Petrochemical (Govt) Type: Combined lump sum & unit prices Term: 1016 days Payment/milestone: Fronting: 30% of yearly budget Selection basis: Best qualified amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $70m+ Experience required: Successful EPC contracts for hydrocarbon process projects up to $70m+ in the last 5 years Bid follow-up Ref: 18572039-004-06 Release: 07.Dec.06 Site visit: 14.Dec.06 1st clarification meeting: 10.Jan.07 14th clarification meeting: 14.Dec.07 Deadline for questioning: 04.Jan.08 Closing: 08.Jan.08 Submission & opening: 14.Jan.08 Registered bidders (not comprehensive) 1.Techint 2.Swecomex 3.Dragados 4.CIMISA 5.Gutsa 6.Abengoa 7.Tradeco 8.ICA Fluor Daniel 9.Siemens 10.Conip 11.Jantesa 12.Senermex Potential participants Skanska, Koch-Glitsch, Sener, ARB Arendal, Chemisa, Areva, Elliot, Vica, Flowserve Status VOID Tender declared VOID on 14.Jan.08 A new RFPs to be announced shortly Updated 07.Feb.08 ETHYLENE PLANT EXPANSION (1st phase) [TERM EXPANDED & EXPERIENCE MODIFIED] [AWARDED] Project Description: (to be posted) Scope: EPC Petrochemical complex: Morelos Location: Coatz, Veracruz Contract Commissioner: Pemex Petrochemical (Govt) Type: Unit prices Term: 485 days Payment/milestone: Fronting: 30% of yearly budget Selection basis: Best qualified amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $11m+ Experience required: Successful EPC contracts for hydrocarbon process projects up to $50m+ (including one of 30m+) in the last 5 years Bid follow-up Ref: 18572039-003-06 Release: 05.Dec.06 Site visit: 14.Dec.06 1st clarification meeting: 03.Jan.07 14th clarification meeting: 28.Jun.07 Closing: 29.Jun.07 Submission & opening: 05.Jul.07 Registered bidders 1.ICA Fluor Daniel 2.Techint 3.Conip 4.Dragados 5.Swecomex 6.Jantesa 7.Tradeco 8.CIMISA 9.Abengoa 10.OPC 11.ARB Arendal 12.Gutsa 14.Lipsa Industrial 15.Sener 16.Industrias Derivadas de Etileno 17.Isolux 18.Skanska 19.Kentech ME&I Potential participants CHEMISA, COMIMSA, ABB, Sulzer Chemtech, Obras Portuarias de Coatz, Schneider Electric, Siemens, Flowserve, Invensys, Atica, Vica, Duro Felguera Status AWARDED Decision: 31.Aug.07 Swecomex: $45million Updated 07.Sep.07 FEDERAL COMMISSION OF ELECTRICITY (CFE)
POWER PLANT HISTORY Cogeneration SALAMANCA-1 [AWARDED] Project Scope: Design/ engineering/ procurement/ construction/ installation/ commissioning/ financing Capacity: 430.2 Mw +/- 15% (summer conditions) Location: Next to Pemex Salamanca refinery Contract Type: Lump sum Financing: 100% Construction term: 858 days Local content: 16% Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $110m+ (1415m+ local currency) Bid follow-up Ref: 18164093-007-10 Release: 27.May.10 Site visit: 03.Jun.10 1st Clarification meeting: 17.Jun.10 2nd Clarification meeting: 01.Jul.10 3rd Clarification meeting: 02.Aug.10 4th Clarification meeting: 31.Aug.10 5th Clarification meeting: 4&7.Oct.10 6th Clarification meeting: 4&9.Nov.10 7th Clarification meeting: 17.Nov.10 Proposal submission and opening: 24.Nov.10 Registered bidders 1.Sener 2.Cobra 3.Sademex 4.Itochu 5.Mitsubishi 6.Iberdrola 7.Schrader Camargo 8.Inelectra North America 9.Vertek 10.SK 11.Samsung 12.Aldesem 13.Acciona 14.Duro Felguera 15.Elecnor 16.Isolux 17.Siemens 18.OHL 19.Alston 20.GE 21.Techint 22.Abener 23.Abengoa 24.Areva T&D Potential participants Toshiba Status AWARDED Ruling: 09.Dec.10 Iberdrola: Pesos 0.4821/kWh ($320million) Updated 10.Dec.10 Previous tender ref: Cogeneration Plant New Pemex Contract Location: Gas processor complex: Nuevo Pemex, Tabasco Commissioner: Pemex Gas & Basic Petrochemical (Govt) Scope: Service contract for steam & power delivery out of water & gas supplied by Pemex Pemex water supply: 800 m tons/hour +2.5% Pemex gas supply: 110 mcfd (42kg/cm2) Steam flow delivery: 550-800 m tons/hour Power capacity (summer conditions): 300 Mw +/-15% Construction term: 3yrs Service term: 20yrs Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $50m+ Local content: 25% Bid follow-up Ref: 18577001-036-08 Release: 28.Aug.08 Site visit: 18-19.Sep.08 1st Clarification meeting: 16.Oct.08 2nd Clarification meeting (questioning): 12.Jan.09 2nd Clarification meeting (responses): 12.Feb.09 3rd Clarification meeting (questioning): 01.Apr.09 3rd Clarification meeting (responses): 20.May.09 4th Clarification meeting (questioning): 26.May.09 4th Clarification meeting (responses): 08.Jun.09 5th Clarification meeting (questioning): 16.Jul.09 5th Clarification meeting (responses): 30.Jul.09 6th Clarification meeting (questioning): 03.Aug.09 6th Clarification meeting (responses): 06.Aug.09 Closing: 06.Aug.09 Proposal submission & opening: 12.Aug.09 Registered bidders 1.ABB 2.Abengoa 3.Abener 4.ARB Arendal 5.Areva T&D 6.CEGELEC 7.Cobra 8.Dalkia 9.Dragados 10.Duke Energy 11.Endesa 12.GE 13.Iberdrola 14.ICA Fluor Daniel 15.Kepler Constructora 16.Marubeni 17.Mitsubishi 18.Mitsui 19.SAPI 20.Saveden 21.Siemens 22.Suez 23.Techint 24.Prolec 25.GE 26.Santander Bank 27.ContourGlobal Potential participants Fenosa, Sener, Elecnor, AES North America Development, AES Tamuin SLP, Isolux, Acciona, Idom Ingenieria, Socoin, Banamex, Quintana Capital, Honeywell, Emerson Process, Mexico Constructora Industrial, Tradeco, URS, Temura Submitted proposals 1.Abengoa-Abener 2.Dragados-ACS-Cobra Status AWARDED Ruling: 31.Aug.09 Abengoa-Abener: $0.4225Kw/hr Updated 01.Sep.09 CC EL SAUZ-1 [AWARDED] Project Scope: Major equipment replacement (turbines/ heat recuperators) and plant modernization Capacity: 222 Mw+ Location: Queretaro Contract Type: Lump sum Financing: 100% Construction term: 827 days Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $50m+ (655m+ local currency) Bid follow-up Ref: 18164093-006-10 Release: 27.May.10 Site visit: 09.Jun.10 1st Clarification meeting: 28.Jun.10 2nd Clarification meeting: 29.Jul.10 3rd Clarification meeting: 24.Aug.10 4th Clarification meeting: 20.Sep.10 5th Clarification meeting: 20.Oct.10 6th Clarification meeting: 17&22.Nov.10 7th Clarification meeting: 07&09.Dec.10 8th Clarification meeting: 17-22.Dec.10 9th Clarification meeting: 24-27.Jan.11 10th Clarification meeting: 03-04.Feb.11 (last) Proposal submission and opening: 16.Feb.11 Registered bidders 1.Isolux 2.Cobra 3.Alstom 4.Siemens 5.Sener 6.Iberdrola 7.GE 8.Tizayuca Cogeneracion (IGSA) 9.OHL 10.Elecnor 11.Abener 12.Duro Felguera 13.GE 14.Inelectra North America Potential participants Saye, Diamante Manzanillo (Mitsubishi), Worleyparsons International, ACS, Schrader Camargo, Acciona, ABB Ruling: 16.Mar.11 Cobra-ACS-Dragados: $150million Status AWARDED Updated 18.Mar.11 CC-SOLAR POWER PLANT AGUA PRIETA II (2nd-round) [AWARDED] Project Description: Combined cycle plant + solar camp Capacity: 343.4-464.6 MW (summer conditions) Scope: Design/ engineering/ procurement (partial) / construction/ installation/ tests/ training/ commissioning Equipment supplied by Commissioner: Gas turbogenerators/ steam generators/ auxiliary systems/ solar camp & auxiliary systems Location: Sonora Contract Commissioner: CFE (Govt) Type: Lump sum Term: 943 days Financing: 100% by contractor Selection basis: Best qualified amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $885m+ (1115m+ local currency) Local content: 10% Subcontracts allowed: Bid follow-up Ref: 18164093-022-09 Release: 11.Jun.09 Site visit: 25.Jun.09 1st clarification meeting: 29.Jul.09 2nd clarification meeting: 04.Sep.09 3rd clarification meeting: 12.Nov.09 4th clarification meeting: 16.Dec.09 5th clarification meeting: 02.Feb.10 6th clarification meeting: 25.Feb.10 7th clarification meeting: 25.Mar.10 8th clarification meeting: 21.Apr.10 9th clarification meeting: 24.May.10 10th clarification meeting: 04.Jun.10 11th clarification meeting: 11.Jun.10 (last) Closing: 30.Jun.10 Submission & opening: 06.Jul.10 Registered bidders 1.Isolux 2.OHL 3.Sener 4.Iberdrola 5.Cobra 6.Abener 7.Prolec GE 8.Inelectra 9.Techint 10.Siemens 11.Acciona 12.Elecnor Potential bidders Itochu, ICA Fluor Daniel, El Paso, Dragados, Mitsubushi, Man Ferrostaal, Socoin, GE, IEE Status AWARDED Ruling: 11.Aug.10 Sener - Elecnor - Proyectos Electricos Agua Prieta: $252million Updated 20.Aug.10 CC POWER PLANT NORTE II [AWARDED] Project Commissioner: CFE (Govt) Location: Chihuahua Capacity: 376+15% Mw (summer condition design) Scope: Engineering Construction Operation Financing & Owning Construction program: 870 days starting 08.Jan.11 Contract: External Power Producer (IPP) Term: 25 years starting 31.May.13 Local content: 25% Min Selection basis Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $78m+ (local currency 1billion+) Bid follow-up Ref: 18164093-047-08 Release: 23.Dec.08 Site visit: 13.Jan.09 1st Clarification meeting: 03.Mar.09 2nd Clarification meeting: 28.Apr.09 3rd Clarification meeting: 18.Aug.09 4th Clarification meeting: 29.Sep.09 5th Clarification meeting: 20.Oct.09 6th Clarification meeting: 30.Nov.09 7th Clarification meeting: 26.Jan.10 8th Clarification meeting: 15.Feb.10 9th Clarification meeting: 29.Mar.10 10th Clarification meeting: 20.Apr.10 11th Clarification meeting: 18.May.10 12th Clarification meeting: 27.May.10 Closing: 12.Jun.10 Submission & technical proposal opening: 18.Jun.10 Technical ruling and offer disclosure: 20.Jul.10 (next) Registered bidders 1.Senermex 2.Iberdrola 3.Mitsubishi 4.Alstom 5.ICA Fluor Daniel 6.Union Fenosa 7.Abener 8.Dragados-Cobra 9.Suez 10.GE 11.Prolec 12.Endesa 13.Siemens 14.Samsung 15.Mitsui 16.Techint 17.Energia Azteca (Intergen) 18.Abengoa Potential bidders Duro Felguera, Itochu, Gas de France, Electricidad Sol de Tuxpan, Brycsa, Emerson, Tribasa, Sadeven, Isolux Actual proposals 1.Korea Electric Power Corp - Samsung C&T Corp - Techint 2.Mitsubishi Corp - Kyushu Electric Power Co 3.Mitsui & Co 4.Iberdrola Energia 5.Abener Energia - Abengoa Mexico - Abeinsa Status AWARDED Ruling: 02.Aug.10 Korea Electric Power Corp - Samsung C&T Corp - Techint: 1.1214 Pesos/kWh ($418million) Updated 20.Aug.10 WIND OAXACA II, III, IV [AWARDED] this is a new 3-winner format tender in order to assign three individual/independent IPP contracts Project Capacity: 3x101.4 Mw +/-2% Location: La Ventosa area in Oaxaca Construction term: 526 days starting 15.Jul.10 through 23.Dec.11 Contracts IPP (3) Term: 20yrs Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $42m+ Local content: 25% Bid follow-up Ref: 18164093-040-09 Release: 03.Nov.09 Site visit: 11.Nov.09 1st Clarification meeting: 02.Dec.09 2nd Clarification meeting: 25.Jan.10 Closing: 05.Feb.10 Proposal submission & technical part opening: 11.Feb.10 Economic part opening: 26.Feb.10 Registered bidders 1.Iberdrola 2.Energias Ambientales de Oaxaca 3.Suez Energia 4.Enerfin 5.GE 6.Acciona 7.Abengoa 8.Siemens 9.Leokon Korea 10.Fenosa 11.Notus Energy 12.Gimsa 13.ICA Fluor Daniel 14.Gesa 15.Mitsui Potential participants Desarrollos Eolicos Mexicanos, ENHOL, Capital Energy, Energia y Recursos Ambientales (EYRA), Enel, Mitsubishi, Gamesa Eolica, Endesa, EDF, Elecnor, Aldesa, Promotora Ambiental, Competitive Power Ventures Actual proposals 1.Iberdrola $0.0806 USD/Kwh 2.Recursos Eolicos de Mexico II: $0.0737 USD/Kwh, III:$0.1050 USD/Kwh, IV: $0.0840 USD/Kwh 3.Enerfin - Elecnor II: $0.0716 USD/Kwh, IV: $0.0713 USD/Kwh 4.Acciona Energia Mexico II: $0.0658 USD/Kwh, III: $0.0678 USD/Kwh, IV: $0.0637 USD/Kwh Status AWARDED Ruling: 08.Mar.10 Acciona Energia Mexico: Oaxaca II: $0.0658 USD/Kwh Oaxaca III: $0.0678 USD/Kwh Oaxaca IV: $0.0637 USD/Kwh Updated 19.Mar.10 Previous tender ref: WIND OAXACA I Project Capacity: 101.4 Mw Location: La Ventosa Oaxaca Term: 473 days from 14.Aug.09 to 30.Nov.10 Contract IPP 20yrs Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $50m+ Local content: 25% Bid follow-up Ref: 18164093-031-08 Release: 02.Sep.08 Site visit: 09.Sep.08 1st Clarification meeting: 02.Oct.08 2nd Clarification meeting: 21.Nov.08 3rd Clarification meeting: 12.Feb.09 4th Clarification meeting: 11.Mar.09 5th Clarification meeting: 23.Mar.09 6th Clarification meeting: 26.Mar.09 (last) Closing: 16.Feb.09 Technical & economic proposal submission: 06.Apr.09 Technical proposal opening: 06.Apr.09 Economic proposal opening: 29.Apr.09 (next) Ruling: 11.May.09 Registered bidders 1.Iberdrola 2.Desarrollos Eolicos Mexicanos 3.ENHOL 4.Abengoa 5.Fenosa 6.Enerfin 7.Capital Energy 8.Prolec GE International 9.Suez Energia 10.Energia y Recursos Ambientales (EYRA) 11.Acciona 12.Leasing Operations Potential participants Enel, Mitsubishi, Gamesa Eolica, Endesa, EDF, Mitsui, Elecnor, Aldesa, Promotora Ambiental, Competitive Power Ventures Submitted proposals 1.Acciona Energia de Mexico 2.Energia y Recursos Ambientales (EYRA)- Energias Ambientales de Guadalajara 3.Enerfin - Elecnor Status AWARDED Energia y Recursos Ambientales (EYRA)- Energias Ambientales de Guadalajara: $0.0660 USD/kWh Updated 15.May.09 CC MANZANILLO [AWARDED] Ref: 18164093-021-09 Actual proposals 1.Iberdrola - Diamante Manzanillo (Mitsubishi): $0.08436 USD/Kwh ($1.06billion) 2.Isolux - Worleyparsons International (Siemens Westinhouse): $0.08212 USD/Kwh ($1.06billion) 3.Cobra - ACS - Inelectra (General Electric): $0.07925 USD/Kwh ($981million) Status AWARDED Ruling: 11.Feb.10 Cobra - ACS - Inelectra (General Electric): $0.07925 USD/Kwh ($981million) Updated 19.Mar.10 CC-SOLAR POWER PLANT AGUA PRIETA II (2nd-round) [AWARDED] Project Description: Combined cycle plant + solar camp Capacity: 343.4-464.6 MW (summer conditions) Scope: Design/ engineering/ procurement (partial) / construction/ installation/ tests/ training/ commissioning Equipment supplied by Commissioner: Gas turbogenerators/ steam generators/ auxiliary systems/ solar camp & auxiliary systems Location: Sonora Contract Commissioner: CFE (Govt) Type: Lump sum Term: 943 days Financing: 100% by contractor Selection basis: Best qualified amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $885m+ (1115m+ local currency) Local content: 10% Subcontracts allowed: Bid follow-up Ref: 18164093-022-09 Release: 11.Jun.09 Site visit: 25.Jun.09 1st clarification meeting: 29.Jul.09 2nd clarification meeting: 04.Sep.09 3rd clarification meeting: 12.Nov.09 4th clarification meeting: 16.Dec.09 5th clarification meeting: 02.Feb.10 6th clarification meeting: 25.Feb.10 7th clarification meeting: 25.Mar.10 8th clarification meeting: 21.Apr.10 9th clarification meeting: 24.May.10 10th clarification meeting: 04.Jun.10 11th clarification meeting: 11.Jun.10 (last) Closing: 30.Jun.10 Submission & opening: 06.Jul.10 Registered bidders 1.Isolux 2.OHL 3.Sener 4.Iberdrola 5.Cobra 6.Abener 7.Prolec GE 8.Inelectra 9.Techint 10.Siemens 11.Acciona 12.Elecnor Potential bidders Itochu, ICA Fluor Daniel, El Paso, Dragados, Mitsubushi, Man Ferrostaal, Socoin, GE, IEE Status AWARDED Ruling: 11.Aug.10 Sener - Elecnor - Proyectos Electricos Agua Prieta Updated 20.Aug.10 Previous tender ref: CC-SOLAR POWER PLANT AGUA PRIETA II [VOID] Project Description: Combined cycle plant formed by 2/3 gas turbogenerators with steam generators and auxiliary systems, one steam turbogenerator with auxiliary systems, one air condensator and complementary equipment. Also a solar camp to generate steam for the combined cycle. And the interconnection with a 230 kV substation. Gas capacity: 535.64 MW +/- 15% (summer conditions) Solar capacity: 24 MW Scope: Design/ engineering/ procurement/ construction/ installation/ tests/ training/ commissioning Location: Sonora Contract Commissioner: CFE (Govt) Type: Lump sum Term: 859 days starting 26.Sep.07 Financing: 100% gas capacity by contractor Donation: $49.35million for 100% solar capacity by GEF-World Bank Payment/milestone: Bid offer/ Provisional acceptance by CFE: 01.Feb.10 Selection basis: Best qualified amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $100m+ Local content: 16% Subcontracts allowed: Design/ engineering/ construction/ commissioning Bid follow-up Ref: 18164093-022-06 Release: 29.Aug.06 Site visit: 06.Sep.06 1st clarification meeting: 04.Oct.06 12th clarification meeting: 05.Jul.07 13th clarification meeting: 19.Jul.07 14th clarification meeting: 31.Jul.07 (last) Closing: 02.Aug.07 Submission & opening: 08.Aug.07 Registered bidders 1.Iberdrola 2.Abener 3.Isolux 4.Dragados 5.Mitsubushi 6.Sener 7.Man Ferrostaal 8.Siemens 9.Socoin 10.Cobra 11.GE 12.El Paso 13.Techint 14.Itochu 15.ICA Fluor Daniel Status Tender declared nul on 08.Aug.06 A new RFPs to be announced shortly Updated 10.Aug.07 CT-TG Baja California II phase 1 [VOID] Project Commissioner: CFE (Govt) Location: Rosarito, Baja California Capacity: Summer 76-103 Mw / Average 105.4-142.6 Mw Scope: EPC Construction program: 547 days starting 05.Mar.10 Provisional acceptance: 30.Jun.11 Contract: Lump sum & financing Local content: Selection basis Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $28m+ (local currency 359million+) Bid follow-up Ref: 18164093-019-09 Release: 02.Jun.09 Site visit: 11.Jun.09 1st clarification meeting: 21.Jul.09 2nd clarification meeting: 31.Jul.09 3rd clarification meeting: 01.Sep.09 4th clarification meeting: 29.Sep.09 5th clarification meeting: 23.Oct.09 6th clarification meeting: 10.Nov.09 7th clarification meeting: 21.Dec.09 8th clarification meeting: 20.Jan.10 9th clarification meeting: 26.Feb.10 (last) Closing: 27.Feb.10 Proposal submission & opening: 05.Mar.10 Registered bidders 1.Isolux 2.Pratt & Whitney-Dinamo 3.OHL 4.GE 5.ICA Fluor Daniel 6.Abener 7.Cobra 8.Prolec GE 9.Rolls-Royce 10.Elecnor 11.Techint 12.Siemens 13.Lipsa 14.Sener 15.SNC Lavalin Constructors 16.Iberdrola Potential bidders ABB, Emerson, Sentry, HPI-Servicontrol Mty Status VOID Tender declared nul on 30.Mar.10 A new RFP should be released shortly Updated 30.Mar.10 CC Poza Rica [AWARDED] Project Commissioner: CFE (Govt) Location: Poza Rica, Veracruz Capacity: 160 Mw Scope: EPC Construction program: 732 days Contract: Lump sum & financing Local content: Selection basis Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $26m+ (local currency 339million+) Bid follow-up Ref: 18164093-016-09 Release: 28.May.09 Site visit: 09.Jun.09 1st Clarification meeting: 16.Jul.09 2nd Clarification meeting: 25.Aug.09 3rd Clarification meeting: 01.Oct.09 4th Clarification meeting: 11.Dec.09 5th Clarification meeting: 19.Jan.10 (last) Closing: 11.Feb.10 Proposal submission & opening: 17.Feb.10 Registered bidders 1.OHL 2.HPI 3.Inelectra 4.Techint 5.Isolux 6.Siemens 7.Acciona 8.IGSA Status AWARDED Ruling: 16.Mar.10 IGSA-Roma M Cogeneracion: $137million Updated 24.Mar.10 CC POWER PLANT NORTE II [AWARDED] Project Commissioner: CFE (Govt) Location: Chihuahua Capacity: 376+15% Mw (summer condition design) Scope: Engineering Construction Operation Financing & Owning Construction program: 870 days starting 08.Jan.11 Contract: External Power Producer (IPP) Term: 25 years starting 31.May.13 Local content: 25% Min Selection basis Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $78m+ (local currency 1billion+) Bid follow-up Ref: 18164093-047-08 Release: 23.Dec.08 Site visit: 13.Jan.09 1st Clarification meeting: 03.Mar.09 2nd Clarification meeting: 28.Apr.09 3rd Clarification meeting: 18.Aug.09 4th Clarification meeting: 29.Sep.09 5th Clarification meeting: 20.Oct.09 6th Clarification meeting: 30.Nov.09 7th Clarification meeting: 26.Jan.10 8th Clarification meeting: 15.Feb.10 9th Clarification meeting: 29.Mar.10 10th Clarification meeting: 20.Apr.10 11th Clarification meeting: 18.May.10 12th Clarification meeting: 27.May.10 Closing: 12.Jun.10 Submission & technical proposal opening: 18.Jun.10 Technical ruling and offer disclosure: 20.Jul.10 (next) Registered bidders 1.Senermex 2.Iberdrola 3.Mitsubishi 4.Alstom 5.ICA Fluor Daniel 6.Union Fenosa 7.Abener 8.Dragados-Cobra 9.Suez 10.GE 11.Prolec 12.Endesa 13.Siemens 14.Samsung 15.Mitsui 16.Techint 17.Energia Azteca (Intergen) 18.Abengoa Potential bidders Duro Felguera, Itochu, Gas de France, Electricidad Sol de Tuxpan, Brycsa, Emerson, Tribasa, Sadeven, Isolux Actual proposals 1.Korea Electric Power Corp - Samsung C&T Corp - Techint 2.Mitsubishi Corp - Kyushu Electric Power Co 3.Mitsui & Co 4.Iberdrola Energia 5.Abener Energia - Abengoa Mexico - Abeinsa Status AWARDED Ruling: 02.Aug.10 Korea Electric Power Corp - Samsung C&T Corp - Techint: 1.1214 Pesos/kWh ($418million) Updated 20.Aug.10 Previous tender ref: CC POWER PLANT NORTE [AWARDED] Project Commissioner: CFE (Govt) Location: Durango Capacity: 333-450 Mw Scope: Engineering Construction Operation Financing & Owning Construction program: 739 days starting 24.May.07 Contract: External Power Producer Term: 25 years Local content: 25% Min Selection basis Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: US$92m+ (local currency 1b+) Bid follow-up Ref: 18164093-015-05 Release: 15.Nov.05 Register deadline: 17.Oct.06 Submission: 23.Oct.06 Offers opening: 19.Jan.07 Decision: 05.Mar.07 Registered bidders 1.Hitachi 2.GE 3.Techint 4.Chubu 5.Siemens 6.Transalta 7.Electricite de France 8.Constructora Andrade Gutierrez 9.Itochu 10.Petrobras 11.Mitsubishi 12.Fenosa 13.Valladolid International Investments 14.Energia Azteca (Intergen) 15.Iberdrola 16.Mitsui 17.Prolec GE 18.ICA Fluor Daniel 19.Energia Termodurango 20.ABB Status AWARDED Union Fenosa Internacional: 0.6294 Pesos/kWh (DOF 15.May.07) (Updated 09.Mar.07) Geothermo Los Humeros II phase B [AWARDED] Project Commissioner: CFE (Govt) Location: Puebla Capacity: 25 Mw Scope: EPC Construction program: Term: 886 days Contract: Lump sum Front payment: n/a Local content: 16% Min Subcontracting: n/a Selection basis Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $12m+ (local currency 154million+) Bid follow-up Ref: 18164093-031-09 Release: 03.Sep.09 Site visit: 10.Sep.09 1st Clarification meeting: 06.Oct.09 2nd Clarification meeting: 23.Oct.09 Closing: 11.Nov.09 Proposal submission & opening: 17.Nov.09 Registered bidders 1.Elecnor 2.GE 3.Camher 4.Alstom 5.Aldesem 6.Sumitomo Potential bidders Status AWARDED Ruling: 04.Dec.09 Alstom Mexicana: $48million Updated 12.Dec.09 Geothermo Cerro Prieto V [VOID] Project Commissioner: CFE (Govt) Location: Baja California Capacity: 100 Mw (2x50) Scope: EPC Construction program: Term: 934 days Contract: Lump sum Local content: 16% Min Selection basis Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $45m+ (local currency 585million+) Bid follow-up Ref: 18164093-009-09 Release: 16.Apr.09 Site visit: 28.Apr.09 1st Clarification meeting: 26.May.09 2nd Clarification meeting: 23.Jun.09 3rd Clarification meeting: 21.Aug.09 4th Clarification meeting: 11.Sep.09 5th Clarification meeting: 02.Oct.09 6th Clarification meeting: 21.Oct.09 7th Clarification meeting: 26.Oct.09 Closing: 26.Nov.09 Proposal submission & opening: 02.Dec.09 Registered bidders 1.Itochu 2.Isolux 3.Iberdrola 4.Alston 5.ICA Fluor Daniel 6.Prolec GE 7.Sumitomo 8.Elecnor 9.Acciona Potential bidders Toshiba, Cegelec, Sadeven, Mitsubishi, Tritanium, Jantesa, Consorcio K, Equipos Indutriales de BC, Tritanium Status VOID Ruling: 19.Jan.10 A new RFPs to be announced shortly Updated 23.Jan.10 WIND OAXACA I [AWARDED] Project Capacity: 101.4 Mw Location: La Ventosa Oaxaca Term: 473 days from 14.Aug.09 to 30.Nov.10 Contract IPP 20yrs Selection basis: Lowest price bid amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $50m+ Local content: 25% Bid follow-up Ref: 18164093-031-08 Release: 02.Sep.08 Site visit: 09.Sep.08 1st Clarification meeting: 02.Oct.08 2nd Clarification meeting: 21.Nov.08 3rd Clarification meeting: 12.Feb.09 4th Clarification meeting: 11.Mar.09 5th Clarification meeting: 23.Mar.09 6th Clarification meeting: 26.Mar.09 (last) Closing: 16.Feb.09 Technical & economic proposal submission: 06.Apr.09 Technical proposal opening: 06.Apr.09 Economic proposal opening: 29.Apr.09 (next) Ruling: 11.May.09 Registered bidders 1.Iberdrola 2.Desarrollos Eolicos Mexicanos 3.ENHOL 4.Abengoa 5.Fenosa 6.Enerfin 7.Capital Energy 8.Prolec GE International 9.Suez Energia 10.Energia y Recursos Ambientales (EYRA) 11.Acciona 12.Leasing Operations Potential participants Enel, Mitsubishi, Gamesa Eolica, Endesa, EDF, Mitsui, Elecnor, Aldesa, Promotora Ambiental, Competitive Power Ventures Submitted proposals 1.Acciona Energia de Mexico 2.Energia y Recursos Ambientales (EYRA)- Energias Ambientales de Guadalajara 3.Enerfin - Elecnor Status AWARDED Energia y Recursos Ambientales (EYRA)- Energias Ambientales de Guadalajara: $0.0660 USD/kWh Updated 15.May.09 Previous tender ref: WIND LA VENTA III [VOID] Project Capacity: 101.4 Mw Location: Oaxaca Term: 456 days starting 31.Jan.08 Contract IPP 20yrs Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $45m+ Local content: 17% Subcontracts allowed: Bid follow-up Ref: 18164093-002-07 Release: 27.Feb.07 Site visit: 06.Mar.07 1st Clarification meeting: 30.Mar.07 2nd Clarification meeting: 14.May.07 3rd Clarification meeting: 13.Jun.07 4th Clarification meeting: 18.Jul.07 Closing: 11.Sep.07 Submission: 17.Sep.07 Offer disclosure: 09.Oct.07 Registered bidders 1.Iberdrola 2.Enel 3.Mitsubishi 4.GE 5.Fenosa Potential participants Gamesa Eolica, Endesa, EDF, Prolec GE, Mitsui, Elecnor, Aldesa, Enerfin, Promotora Ambiental, Abengoa, Competitive Power Ventures Status VOID Tender declared VOID on 24.Oct.07 A new RFPs to be announced shortly Updated 12.Dec.07 PREVIOUS TENDER REFERENCE La Venta II/ 83.3 Mw (98 units)/ 31.Aug.05/ Iberdrola - Gamesa Eolica/ $111.4million HYDROELECTRIC LA YESCA (2nd round) [AWARDED] Project Capacity: 2x375 MW Location: Jalisco-Nayarit Term: 1720 days starting 17.Sep.07 Scope: Construction & financing (100%) Contract: Mixed lump sum/unit prices Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $275m+ Local content: 5% Subcontracts allowed: Bid follow-up Ref: 18164093-001-07 Release: 27.Feb.07 Site visit: 06.Mar.07 1st Clarification meeting: 29.Mar.07 7th Clarification meeting: 31.Jul.07 Closing: 01.Aug.07 Submission & opening: 07.Aug.07 Registered bidders 1.ICA 2.CARSO-IDEAL 3.Techint 4.Gutsa 5.Grupo Mexico 6.Impregilo 7.Voith Siemens 8.Prolec GE 9.La Peninsular 10.Construcciones y Trituraciones 11.Alstom 12.Va Tech Escher Wyss 13.Power Machines Potential participants GPPP, Cemex, ISA Ingenieria, PCM Concreto, Andrade Gutierrez Actual proposals 1.ICA-Adisa-La Peninsular: $768million 2.CARSO-IDEAL: $808million 3.Impregilo-Techint: $856million Ruling: 06.Sep.07 ICA-Adisa-La Peninsular: $768million Status AWARDED Updated 07.Sep.07 ------------------------ 1st-round RECORD Registered bidders: 1.Mitsubishi 2.ISA 3.Gutsa 4.Power Machines de Mexico 5.Condux (Protexa) 6.ICA 7.GE 8.IDEAL 9.Techint 10.Sinohydro 11.Alstom 12.Mexico Constructora Industrial 13.Construcciones y Trituraciones 14.Obracon Huarte Lain 15.La Peninsular 16.Andrade Gutierrez 17.Tradeco 18.Va Tech Escher Wyss 19.Odebrecht 20.Carso Infraestructura Proposals: 1.Sinohydro-Gutsa: 1053+197=$1250million 2.ICA-Adisa-CPH-Peninsular: 764+145=$909million 3.Impregilo-Techint: 678+127=$805million Ruling: Offers 1 & 2 higher than approved budget: $837million Offer 3 did not comply with technical requirements Tender declared VOID on 01.Nov.06 CC-SOLAR POWER PLANT AGUA PRIETA II [VOID] Project Description: Combined cycle plant formed by 2/3 gas turbogenerators with steam generators and auxiliary systems, one steam turbogenerator with auxiliary systems, one air condensator and complementary equipment. Also a solar camp to generate steam for the combined cycle. And the interconnection with a 230 kV substation. Gas capacity: 535.64 MW +/- 15% (summer conditions) Solar capacity: 24 MW Scope: Design/ engineering/ procurement/ construction/ installation/ tests/ training/ commissioning Location: Sonora Contract Commissioner: CFE (Govt) Type: Lump sum Term: 859 days starting 26.Sep.07 Financing: 100% gas capacity by contractor Donation: $49.35million for 100% solar capacity by GEF-World Bank Payment/milestone: Bid offer/ Provisional acceptance by CFE: 01.Feb.10 Selection basis: Best qualified amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $100m+ Local content: 16% Subcontracts allowed: Design/ engineering/ construction/ commissioning Bid follow-up Ref: 18164093-022-06 Release: 29.Aug.06 Site visit: 06.Sep.06 1st clarification meeting: 04.Oct.06 12th clarification meeting: 05.Jul.07 13th clarification meeting: 19.Jul.07 14th clarification meeting: 31.Jul.07 (last) Closing: 02.Aug.07 Submission & opening: 08.Aug.07 Registered bidders 1.Iberdrola 2.Abener 3.Isolux 4.Dragados 5.Mitsubushi 6.Sener 7.Man Ferrostaal 8.Siemens 9.Socoin 10.Cobra 11.GE 12.El Paso 13.Techint 14.Itochu 15.ICA Fluor Daniel Status Tender declared VOID on 08.Aug.06 A new RFPs to be announced shortly Updated 10.Aug.07 NUCLEAR POWER PLANT LAGUNA VERDE (1st Fase) [AWARDED] Project Description: Renewal of units 1 & 2 (2x810 MW) Scope: Design/ engineering/ procurement/ dismantlement/ construction/ installation/ tests/ training/ commissioning Location: Veracruz Term: 1392 days starting 01.Mar.07 Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $130m+ Local content: 10% Subcontracting: Allowed Contract Type: Lump sum Financing: 100% by contractor Payments/milestones: Unit 1: Provisional acceptance by CFE scheduled for 05.Jul.10 Unit 1: Full acceptance by CFE Unit 2: Provisional acceptance by CFE scheduled for 20.Dec.10 Unit 2: Full acceptance by CFE Selection basis: Lowest price bid from compliant proposals Bid follow-up Ref: 18164093-013-06 Release: 25.May.06 Deadline for 6th-questioning: 17.Nov.06 6th clarification meeting: 30.Nov.06 (last) Closing: 13.Jan.07 Submission & opening: 19.Jan.07 Decision: 12.Feb.07 Finalizing: 28.Feb.07 Registered bidders 1.Siemens 2.Sener (es) 3.ICA Fluor Daniel 4.Techint 5.Alstom 6.GE 7.Iberdrola 8.Elecnor 9.Mitsubishi Proposals 1.GE-Diamante: $951.5million 2.Siemens-Techint-Sener: $695million 3.Iberdrola-Alstom: $605million Decision: 12.Feb.07 Finalizing: 28.Feb.07 (next) Status AWARDED Iberdrola Ingenieria y Consultoria Mexico - Iberdrola Ingenieria y Construccion - Alstom Mexicana: $605million Updated 12.Feb.07 CC POWER PLANT NORTE [AWARDED] Project Commissioner: CFE (Govt) Location: Durango Capacity: 333-450 Mw Scope: Engineering Construction Operation Financing & Owning Construction program: 739 days starting 24.May.07 Contract: External Power Producer Term: 25 years Local content: 25% Min Selection basis Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: US$92m+ (local currency 1b+) Bid follow-up Ref: 18164093-015-05 Release: 15.Nov.05 Register deadline: 17.Oct.06 Submission: 23.Oct.06 Offers opening: 19.Jan.07 Decision: 05.Mar.07 Registered bidders 1.Hitachi 2.GE 3.Techint 4.Chubu 5.Siemens 6.Transalta 7.Electricite de France 8.Constructora Andrade Gutierrez 9.Itochu 10.Petrobras 11.Mitsubishi 12.Fenosa 13.Valladolid International Investments 14.Energia Azteca (Intergen) 15.Iberdrola 16.Mitsui 17.Prolec GE 18.ICA Fluor Daniel 19.Energia Termodurango 20.ABB Status AWARDED Union Fenosa Internacional: 0.6294 Pesos/kWh (DOF 15.May.07) (Updated 09.Mar.07) HYDROELECTRIC LA YESCA (1st round) [VOID] Project Capacity: 2x375 MW Location: Jalisco-Nayarit Term: 1691 days Project start/finish: 13.Nov.06/30.Jun.11 Scope: Construction & financing (100%) Contract: Mixed lump sum/unit prices Bid follow-up Ref: 18164093-011-06 Release: 18.May.06 12th Clarification meeting: 06.Oct.06 (last) Submission & opening: 13.Oct.06 Registered bidders 1.Mitsubishi 2.ISA 3.Gutsa 4.Power Machines de Mexico 5.Condux (Protexa) 6.ICA 7.GE 8.IDEAL 9.Techint 10.Sinohydro 11.Alstom 12.Mexico Constructora Industrial 13.Construcciones y Trituraciones 14.Obracon Huarte Lain 15.La Peninsular 16.Andrade Gutierrez 17.Tradeco 18.Va Tech Escher Wyss 19.Odebrecht 20.Carso Infraestructura Proposals 1.Sinohydro-Gutsa: 1053+197=$1250million 2.ICA-Adisa-CPH-Peninsular: 764+145=$909million 3.Impregilo-Techint: 678+127=$805million Ruling Offers 1 & 2 higher than approved budget: $837million Offer 3 did not comply with technical requirements Status Tender declared VOID on 01.Nov.06 A new RFPs to be announced shortly (Updated 02.Nov.06) CC POWER PLANT BAJA CALIFORNIA (2nd round) [AWARDED] Project Capacity: 252.3 MW +/-15% Scope: Engineering Procurement Construction & Financing Construction program: 858 days starting 25.Oct.06 Location: Tijuana BC Contract Turn key-Lump sum Commissioner: CFE (Govt) Local content: +18% Selection basis: Lowest price bid from compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: US$55m+ Bid follow-up Ref: 18164093-017-06 Release: 18.Jul.06 Submission & opening: 29.Aug.06 Decision: 27.Sep.06 Bidders 1.Isolux 2.Abener 3.Dragados 4.Itochu 5.GE 6.Siemens 7.Techint 8.Socoin Winner Isolux-Techint: $174million (Updated 13.Oct.06) COAL POWER PLANT PACIFICO [AWARDED] Location: Lazaro Cardenas (Mexico West coast) Capacity: 648 MW Scope: Engineering Construction & Financing Construction program: 1342 days from 31.May.06 to 01.Feb.10 Contract: Turn key-Lump sum Local content: 15% Min Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: US$95m+ Bid follow-up: Ref: 18164093-003-03 Release: 22.Jul.03 Registered bidders (not comprehensive): 1.Techint 2.ICA Fluor Daniel 3.Alstom Power Mexico 4.Skanska Mexico 5.Mitsubishi Corporation 6.Mitsui & Co 7.Dragados Proyectos Industriales de Mexico 8.Hitachi 9.Soluziona Tecnologias de Informacion 10.Siemens 11.Itochu Corporation 12.Credit Agricole Indosuez 13.Skoda Export 14.GE International 15.ABB Utilities 16.Construtora Andrade Gutierrez 16.ABB Mexico Decision: 06.Dec.05 Mitsubishi Corporation - Carboelectrica Diamante: $611million (Updated 06.Dec.05) 2. CC Power plant Mexicali II Ref: 18164093-002-02/ Cancelled 3. CC Power plant Tamazunchale 18164093-001-03/ 30.Jun.04/ Iberdrola Mexico/ IPP/ 25yrs/ 839-1135 MW 5. CC Power plant Tuxpan V 18164093-013-02/ 17.Dec.03/ Mitsubishi Corporation-Kyushu Electric Power Co/ IPP/ 25yrs/ 431-527 MW 7. CC Power plant Valladolid III 18164093-032-02/ 14.Oct.03/ Mitsui & Co Ltd/ IPP/ 25yrs/ 430-525 MW 8. CC Power plant Altamira V 18164093-001-02/ 22.Oct.03/ Iberdrola Mexico/ IPP/ 25yrs/ 975 MW 9. Hydroelectric El Cajon 18164093-011-02/ 14.Mar.03/ Constructora Internacional de Infraestructura: ICA-Promotora e Inversora Adisa-La Peninsular Compania Constructora-EnergomachExport Power Machine/ $749.5million/ $0.0685/Kw-h/ 2x375 MW FEDERAL COMMISSION OF ELECTRICITY (CFE)
ENERGY SOURCES HISTORY LNG TRANSPORT [AWARDED] Project 30" Pipeline 304km long Contract Volume: up tp 500 mcfd Service location: 1. Manzanillo LNG terminal - Manzanillo thermo power plant 2. Manzanillo LNG terminal - Guadalajara thermo power plant 3. Manzanillo LNG terminal - Guadalajara Pemex LNG network Term: 25yrs starting on March 2011 Selection basis: Lowest price bid from compliant proposals Bidders profile Company/consortium from any country Combine equity: Bid follow-up Ref: 18164067-061-08 Release: 14.Oct.08 Site visit: 23-24.Oct.08 1st Clarification meeting: 11.Nov.08 10th Clarification meeting: 07.Apr.09 Closing: 08.Apr.09 Proposal submission & opening: 14.Apr.09 Registered bidders (not comprehensive): 1.Mitsubishi 2.Promotora del Desarrollo de America Latina (Ideal) 3.El Paso 4.ICA Fluor Daniel 5.ARB Arendal 6.Carso Infraestructura y Construccion 7.Bredero Shaw 8.Compania Mexicana de Gerencia y Operacion 9.EMS Energy Services Mexico 10.Mitsui 11.Techint 12.Energia Occidente de Mexico (Transcanada) 13.Fermaca Pipeline del Pacifico 14.Plantas y Lineas Industriales 15.Transportadora de Gas Natural La Huasteca 16.Isolux 17.Condux (Protexa) 18.Sempra Energy 19.GDF Suez 20.Temura 21.Cobra 22.Elecnor 23.Marubeni 24.Tubacero Potential participants Tejas Gas de Toluca, Promigas, Thales, Dennis, Tecgas, Itochu, Walworth, MI Servicios, MI Consultores, Plantas y Lineas Industriales, Tubesa, SK Engineering and Construction Submitted proposal 1.Energia Occidente de Mexico (Transcanada) 2.Fermaca Pipeline del Pacifico 3.EMS Energy Services de Mexico Status AWARDED Ruling: 06.May.09 Energia Occidente de Mexico (Transcanada): $294million (PV) Updated 08.May.09 LNG SUPPLY [AWARDED] Contract Volume: Up to 500 MCFD Term: 15yrs Delivery schedule: 2011: 90 MCFD 2012: 180 MCFD 2013: 360 MCFD 2014: 400 MCFD 2015-2025: 500 MCFD Location: Manzanillo, Colima (Pacific coast) Payments: 30 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile Company/consortium from any country Combine equity: $150million Bid follow-up Ref: 18164067-009-06 Release: 06.Jun.06 Closing: 30.Aug.07 Submission & opening: 04.Sep.07 Registered bidders (not comprehensive): 1.Techint 2.Transportacion Maritima Mexicana (TMM) 3.Fenosa 4.Marubeni 5.Sener 6.Sumitomo 7.El Paso 8.Mitsui 9.Repsol 10.Mitsubishi 11.Shell 12.IPD 13.Transcanada 14.Sempra 15.Transportaciones Maritimas Petroleras 16.La Huasteca 17.Tokio Gas Potential participants Chevron-Texaco, Gastream, Zeta Gas, Itochu, Anumen, Petrobras, Intergen, Protexa, Grupo R, Societe Generale, Skanska Actual proposals 1.Repsol: $0.03 below maximum set by CFE (0.91% Henry Hubb index) Ruling: 18.Sep.07 Status AWARDED Repsol Comercializadora de Gas: 0.91% Henry Hubb-0.03USD/MMBtu Updated 28.Sep.07 LNG TERMINAL [AWARDED] Contract Scope: Reception/ storage/ regasification/ delivery Volume: 500 mcfd (543 353.84 GJules/day) Location: Manzanillo, Colima (Pacific coast) Term: 20 yrs starting 01.Jul.11 Payments: 30 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile Company/consortium from any country Combine equity: $100million Bid follow-up Ref: 18164067-010-06 Release: 06.Jun.06 Site visit: 23.Jun.06 1st Clarification meeting: 30.Oct.06 2nd Clarification meeting: 14.Nov.06 3rd Clarification meeting & Issue of Bid Documentation Rev-1: 14.Dec.06 Bidders attendance: Iberdrola Energia, ICA Fluor Daniel, Union Fenosa Gas, Construcciones Protexa, Mitsubishi Corp, Sempra Energy, Tokio Gas Co, Mitsui & Co, Korea Gas Corp, Samsung Corp, Gastream Mexico, Itochu Corp, El Paso Energia Mexico, Techint, Marubeni Mexico, TransCanada (Transportadora de Gas Natural la Huasteca), Servicios Maritimos de Campeche, Sumitomo Corp Deadline for 4th-questioning: 05.Jan.07 4th Clarification meeting: 02.Feb.07 5th Clarification meeting: 22.Feb.07 6th Clarification meeting: 20.Mar.07 7th Clarification meeting: 07.Aug.07 8th Clarification meeting: 06.Sep.07 9th Clarification meeting: 20.Sep.07 10th Clarification meeting: 16.Oct.07 13th Clarification meeting: 31.Jan.08 14th Clarification meeting: 08.Feb.08 Closing: 19.Feb.08 Submission & opening: 25.Feb.08 Registered bidders (not comprehensive) 1.Transcanada 2.Swecomex 3.Shell 4.Marubeni 5.Sumitomo 6.Jantesa (ve) 7.Sener (es) 8.Samsung 9.Petrobras 10.Intergen 11.Protexa 12.El Paso 13.Societe Generale 14.Mitsui 15.Tokio Gas 16.Skanska 17.ABB 18.Great Lakes Dredge & Dock Company 19.Korea Gas Corp 20.ICA Fluor Daniel 21.Dragamex 22.Iberdrola 23.Zeta Gas 24.Mitsubishi 25.Dames & Moore 26.ITP Interpipe 27.Gastream 28.Itochu 29.Obrascon Huarte Lain 30.Fenosa 31.Sempra 32.Techint 33.IHI 34.TMM 35.Mexicana de Dragados 36.Servicios Maritimos de Campeche 37.SBM Offshore Group 38.Van Oord 39.La Huasteca 40.Cobra 41.Man Ferrostaal Potential participants IHI Corp, Flowserve Status AWARDED Proposals: 1.Terminal KMS de GNL (Mitsui - KOGAS - Samsung): $0.4044/million BTUs 2.Controladora LNG Manzanillo (Iberdrola - Tokio Gas - IHI - ICA): $0.5117/million BTUs 3.Energia Occidente de Mexico (Transcanada - Techint - Tractebel): $0.6484/million BTUs Ruling: 07.Mar.08 Terminal KMS de GNL (Mitsui - KOGAS - Samsung): $0.4044/million BTUs = $480million Updated 01.Apr.08 PREVIOUS TENDER REFERENCE 18164067-025-02/ 11.Sep.03/ Gas del Litoral (Terminal de LNG de Altamira) (Shell)/ Henry Hub+0.7142USD/GCal/ 15yrs __________________________________________________________________ ARAMONI Expert Services: TENDER OUTSOURCING
Expert assistance to reduce tendering costs secure compliance and improve bid results Based on a typical tender procedure we provide the following services: LOCAL SUPPORT 1. OPPORTUNITY ALERT • Secure RFPs monitoring • Project scope overview for entering decision (report) 2. TENDER REGISTER • Tender register procedure • Collection & sending of bid documents 3. BIDDERS MEETINGS • Attendance on behalf/accompanying • Meeting review (report) • PEMEX’s responses assessment (report) • Notes on contenders' concerns (report) EXPERT ASSISTANCE 4. TENDER/CONTRACT UNDERSTANDING • Clarifications online • Enquiries for PEMEX subsequent confirmations 5. PROJECT INSIGHT • Project scope discussion • Questions writing for PEMEX to clarify 6. COMPLIANCE • Technical proposal review: format/ completeness/ consistency In sum: • Our expertise covers the tender’s features foreign companies are not familiar with. • We offer the advantage of local presence and extensive experience as a complement to our client’s own capabilities. • We oversee, but do not participate in, clients’ sensitive issues such price bid offer. Additionally we act as representatives as follows: • BUSINESS/PROJECT DEVELOPMENT • CONTRACT PURSUIT • SPECIAL ASSIGNMENTS We hope some of these services be of interest and look forward to further dialogue. Contact: info@aramoni.com __________________________________________________________________ ARAMONI Expert Services: PROMPT MARKETING
Expert assistance designed for equipment producers to enter Mexico’s energy market This service concept is based on our standing as a reliable supplier to the energy contractors market. We maintain professional relationships with most of the companies participating in PEMEX major tenders/projects. And we have got open channels to market the products of the companies we represent. FYI we have started market actions towards the Tula refinery project. SERVICE SCOPE Marketing material & paperwork Setting up business relationships with potential/actual Pemex contractors RFQ securement Submission of offers/quotes Support for sales & deliveries TRIAL PERIOD: 9 month PRICE COMPONENTS 1. Planning & start-up 2. Retaining fee 3. Expenses: travel, bid docs, translation, etc 4. Sale commission: based on industry standards In sum: • Aramoni’s background and expertise position client’s products straight away in the spotlight of the Mexico’s energy market. • We offer the advantage of local presence, market knowledge and business understanding. • We select our clients based on a complementary portfolio and no (at all) conflict of interests. We hope this service be of interest and look forward to hearing from you. Contact: info@aramoni.com __________________________________________________________________
Previous
|