PROJECT TRACKER   (2 of 2)


IN CONSTRUCTION


ARAMONI SERVICES
1. REPORTING
Up-to-date tender information
2. OPPORTUNITY ALERT SUBSCRIPTION
We timely identify project opportunities for our clients
3. TENDER INTRODUCTION
We position our clients to apply for bid project opportunities
4. TENDER COMPLIANCE
We secure our clients' bid proposals
5. BID ASSISTANCE
Expert service to produce competitive compliant proposals
6. BUSINESS DEVELOPMENT
Consulting & assistance to accomplish corporate goals
7. TENDER OUTSOURCING
Expert assistance to reduce tendering costs secure compliance and improve bid results
8. PROMPT MARKETING
Expert assistance designed for equipment producers to enter Mexico’s energy market


INDUSTRY NEWS & OPPORTUNITIES

_______________________________

PEMEX MAJOR TENDERS COMING

Naphta desulphurization units
for Tula & Salamanca refinery complexes
First tender declared VOID on 28.May.09
A new RFPs to be announced shortly

Living quarter platform HA-LT-01
A section was opened below
it provides related current tenders
as well as project history

LNG transport
400 mcfd / 230 km / $600m+
San Luis Potosi / Guanajuato / Queretaro
We will timely report on this tender
and post further info as available

___________________________________

PEMEX 2010
INFRASTRUCTURE PORTFOLIO

(forward-looking statement by CEO)
• Lease Offshore Drilling Rigs: $1.77Billion
• Pipeline Maintenance: $1.17Billion
(Pol A - Nohoch A - Atasta - Cd Pemex)
• Well Drilling Contracts
South Division: $1.02Billion
North Division: $842million
• Offshore Drilling Rigs: $600million
• Heavy Crude Oil: $378million
(Dos Bocas, Tabasco)
• Pipeline Extension: $360million
(Dos Bocas Marine Terminal -
Tuzandepetl & Palomas)
• Lease Land Drilling Rigs: $274million
(South Division)
• Transportation: $250million
(5 Bids to Offshore Facilities)
• Building 35 Facilities: $237million
(South Region)
• Lease Land Drilling Rigs: $232million
(North Division)
• Refining Capacity Expansion: $9.00Billion
• Clean Fuel Project: $4.90Billion
(Diesel Phase)
• Salamanca Refinery Reconfig: $2.60Billion
• Refinery Maintenance Prog: $400-600million
• Reforming Unit in Minatitlán: $135million
• Natural Gas Pipeline Project: $632million
(Tamazunchale –San Luis de la Paz –
San Jose Iturbide)
_______________________________


PEMEX EXPLORATION & PRODUCTION (PEP)

MARINE EXPLORATION & PRODUCTION

DRILLING PACKAGES Lease Contracts for 2010
PEMEX UPMP: RFPs expected from March

1.North Division
Contract: Lease with no purchase option
Term: 1034d
Location: GOM
1000HP drawworks
Status [BUDGET APPROVED]

2.Marine Division
Contract: Lease with no purchase option
Term: 593d
Location: AIKMZ-UOKMZ ("D")
1000HP drawworks
Status [BUDGET APPROVED]

3.Marine Division
Contract: Lease with no purchase option
Term: 422d
Location: AIKMZ-UOKMZ ("B")
1000HP drawworks
Status [BUDGET APPROVED]

4.Marine Division
Contract: Lease with no purchase option
Term: 296d
Location: AIAPC-UOAPC ("1")-REMI
1000HP drawworks
Status [BUDGET APPROVED]

5.Marine Division
Contract: Lease with no purchase option
Term: 280d
Location: AIC-UOC ("A")
1000HP drawworks
Status [BUDGET APPROVED]
_______________________________

6.Marine Division
Contract: Lease with no purchase option
Term: 231d (15.May.10-31.Dec.10)
Location: Campeche basin
Platform: 8-L Manik-A
Well: Manik-12
Unit: Diesel electrical
Drilling depth: +20 000f
2000HP drawworks
Bid follow-up
Status [SUBMITTED]

7.Marine Division
Contract: Lease with no purchase option
Term: 396d
Location: AIC-UOC ("IV")
2000HP drawworks
Status [BUDGET APPROVED]

8.Marine Division
Contract: Lease with no purchase option
Term: 408d
Location: AIC-UOC ("I")
2000HP drawworks
Status [BUDGET APPROVED]

9.Marine Division
Contract: Lease with no purchase option
Term: 904d
Location: AIC-UOKMZ ("IX")
2000HP drawworks
Status [BUDGET APPROVED]

10.Marine Division
Contract: Lease with no purchase option
Term: 549d
Location: AIC-UOC ("E")
2000HP drawworks
Status [BUDGET APPROVED]

11.Marine Division
Contract: Lease with no purchase option
Term: 769d
Location: AIC-UOC ("N")
2000HP drawworks
Status [BUDGET APPROVED]

12.Marine Division
Contract: Lease with no purchase option
Term: 549d
Location: AIC-UOC ("E")
2000HP drawworks
Status [BUDGET APPROVED]

13.Marine Division
Contract: Lease with no purchase option
Term: 367d
Location: AIC-UOC ("F")
2000HP drawworks
Status [BUDGET APPROVED]

14.Marine Division
Contract: Lease with no purchase option
Term: 757d
Location: AIC-UOC ("H")
2000HP drawworks
Status [BUDGET APPROVED]

15.Marine Division
Contract: Lease with no purchase option
Term: 1478d
Location: AIC-UOC ("CI")
2000HP drawworks
Status [BUDGET APPROVED]
_______________________________

16.Marine Division
Contract: Lease with no purchase option
Location: AILT-UOLT ("W")-REMI-MIX
3000HP drawworks
Term: 760d
Status [BUDGET APPROVED]

17.Marine Division
Contract: Lease with no purchase option
Location: AIAPC-UOAPC ("XIII")-REMI
3000HP drawworks
Term: 1306d
Status [BUDGET APPROVED]

18.Marine Division
Contract: Lease with no purchase option
Location: AILT-UOLT ("X")-REMI
3000HP drawworks
Term: 1456d
Status [BUDGET APPROVED]

19.Marine Division
Contract: Lease with no purchase option
Location: AILT-UOLT ("V")-REMI
3000HP drawworks
Term: 1048d
Status [BUDGET APPROVED]

_______________________________

JACKUP Lease Contracts for 2010
PEMEX UPMP: RFPs expected from March

1.Marine Division
Contract: Lease with no purchase option
Term: 625d
Location: AILT-UOLT
A/E: V-REMI
Drilling depth: 250ft
Status [BUDGET APPROVED]
_______________________________

2.North Division
Contract: Lease with no purchase option
Term: 1034d
Location: GOM
Drilling depth: 300ft
Status [BUDGET APPROVED]

3.Marine Division
Contract: Lease with no purchase option
Term: 412d
Location: AILT-UOLT
A/E: XLVIII-REMI
Drilling depth: 300ft
Status [BUDGET APPROVED]

4.Marine Division
Contract: Lease with no purchase option
Term: 698d
Location: AIC-AIC-UOC
A/E: S
Drilling depth: 300ft
Status [BUDGET APPROVED]
_______________________________

5.Marine Division
Contract: Lease with no purchase option
Term: 715d
Location: AIKMZ-UOKMZ
A/E: XL
Drilling depth: 350ft
Status [BUDGET APPROVED]

6.Marine Division
Contract: Lease with no purchase option
Term: 531d
Location: AIC-UOKMZ
A/E: I
Drilling depth: 350ft
Status [BUDGET APPROVED]

7.Marine Division
Contract: Lease with no purchase option
Term: 630d
Location: AIC-AIKMZ-UOKMZ
A/E: F
Drilling depth: 350ft
Status [BUDGET APPROVED]

8.Marine Division
Contract: Lease with no purchase option
Term: 485d
Location: AIC-AIC-UOKMZ
A/E: S
Drilling depth: 350ft
Status [BUDGET APPROVED]
_______________________________

9.Marine Division
Contract: Lease with purchase option
Term: 3621d
Location: GOM
A/E: P
Drilling depth: 350ft
Drawworks: 3000HP
Status [BUDGET APPROVED]

10.Marine Division
Contract: Lease with purchase option
Term: 3621d
Location: GOM
A/E: P
Drilling depth: 350ft
Drawworks: 3000HP
Status [BUDGET APPROVED]

____________________________________

ONSHORE EXPLORATION & PRODUCTION

DRILLING RIG Lease Contracts for 2010
RFPs expected from March

1-3.South Division
Contract: 3 leases with no purchase option
Term: 730d
3 units
1000HP drawworks
Status [BUDGET APPROVED]

4-6.South Division
Contract: 3 leases with no purchase option
Term: 730d
3 units
1500HP drawworks
Status [BUDGET APPROVED]

7-9.South Division
Contract: 3 leases with no purchase option
Term: 730d
3 units
2000HP drawworks
Status [BUDGET APPROVED]

10-12.South Division
Contract: 3 leases with no purchase option
Term: 730d
3 units
3000HP drawworks
Status [BUDGET APPROVED]

_______________________________

13-17.North Division
Commissioner: UPMP
Contracts: Purchase
2 units/ 1000HP drawworks
1 unit / 1500HP drawworks
2 units/ 2000HP drawworks
Status [BUDGET APPROVED]

18-22.South Division
Commissioner: UPMP
Contracts: Purchase
2 units/ 2000HP drawworks
3 units/ 3000HP drawworks
Status [BUDGET APPROVED]

_______________________________


PEMEX EXPLORATION & PRODUCTION (PEP)

DEEPWATER CONSULTING
Current assignments:
1. Production systems: Scandpower
Petroleum Technology
2. Foundation design: Norweigan
Geotechnical Institute
3. Well drilling termination & maintenance:
Canadian Triton International
Coming opportunities will be
posted as soon as released

DEEPWATER PROSPECTING
Three projects defined in GOM deep basin:
1. GOM B
2. GOM South
3. Perdido Area
Based on seismic studies there would be
nine blocks with 29.5billion barrel reserves
So far prospecting wells in GOM B:
Nab-1 (oil) Noxal-1 (gas) Lakach-1 (gas)
Lalail-1 (gas) have incorporated
520million barrel as proven reserves
4. Deep-waters seismic exploration
over 75000km2 of the GOM
using 3D wide-azimuth technology: CGGVeritas
We will timely post coming RFPs

____________________________________

On a specialty basis we will consider
to provide expert representation services
to international companies pursuing work
in Mexico's deep-water development

Contact: info@aramoni.com

____________________________________

PEMEX EXPLORATION & PRODUCTION (PEP)

OFFSHORE PLATFORM HISTORY

50. Kab-B [AWARDED]
Project
Light structure platform
Scope: Engineering/ procurement/ construction/ tests/ loading/ fixing
Location: Contractor's yard
Term: 240 days starting 13.Oct.09
Mailstones:
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $5m+
Contract
Type: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-021-09
Release: 25.Jun.09
Site visit: n/a
1st clarification meeting: 14.Jul.09
2nd clarification meeting: 23.Jul.09
3rd clarification meeting: 31.Jul.09
4th clarification meeting & closing: 14.Aug.09
Submission & opening: 20.Aug.09
Registered bidders
1.Bosnor 2.CIT 3.Construcciones Mecanicas de Monclova 4.Construcciones y Equipos Latinoamericanos (Protexa) 5.Global Offshore 6.Industrias W 7.J Ray McDermott 8.Dragados 9.Cicsa 10.Dynamic Industries International 12.Industria del Hierro (ICA Fluor Daniel) 13.Surpetrol
Potential participants
Status AWARDED
Ruling: 21.Sep.09
Construcciones Mecanicas de Monclova: $13million
Updated 02.Oct.09

48. PG-ZAAP-C Power generation [AWARDED]
Project
Power generation platform and bridge
Scope: Engineering/ procurement/ construction/ loading/ fixing/ transport/ installation/ testing/ start-up
Location: Campeche basin GOM
Term: 660 days starting 30.Sep.09
Mailstones:
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $48m+
Contract
Type: Lump sum & unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-004-09
Release: 31.Mar.09
Site visit: n/a
1st clarification meeting: 14.Apr.09
2nd clarification meeting: 27.Apr.09
3rd clarification meeting: 12.May.09
4th clarification meeting: 26.May.09
5th clarification meeting: 10.Jun.09
6th clarification meeting: 23.Jun.09
7th clarification meeting: 02.Jul.09
8th clarification meeting: 17.Jul.09
9th clarification meeting: 22.Jul.09
10th clarification meeting: 28.Jul.09
Closing: 29.Jul.09
Submission & opening: 04.Aug.09
Registered bidders
1.ABB 2.Bosnor 3.Dragados 4.Heerema 5.J Ray McDermott 6.Turbinas Solar 7.Demar 8.Industria del Hierro (ICA Fluor Daniel) 9.Cicsa 10.Construcciones y Equipos Latinoamericanos (Protexa) 11.Construcciones Mecanicas de Monclova 12.Siemens 13.GE 14.Global Offshore 15.Technip 16.Elecnor 17.Saipem
Potential participants
Dresser Rand, Industrias W, Evya, Areche, Sentry, K Tronix, Areche, Especialidades en Turbomaquinaria, Rengen
Status AWARDED
Ruling: 11.Sep.09
Dragados Offshore de Mexico: $202million
Updated 11.Sep.09

49. Kambesah [AWARDED]
Project
Well recovery platform
Scope: Construction
Location: Campeche basin GOM
Term: 210 days starting 10.Aug.09
Mailstones:
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $6m+
Contract
Type: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-019-09
Release: 19.May.09
Site visit: n/a
1st clarification meeting: 29.May.09
2nd clarification meeting: 12.Jun.09
3rd clarification meeting: 18.Jun.09
4th clarification meeting: 25.Jun.09
Questioning dealine: 28.jun.09
5th clarification meeting: 30.Jun.09
Closing: 30.Jun.09
Submission & opening: 06.Jul.09
Registered bidders
1.Construcciones Mecanicas de Monclova 2.Construcciones y Equipos Latinoamericanos (Protexa) 3.Dragados 4.Industria del Hierro (ICA Fluor Daniel) 5.J Ray McDermott 6.Cicsa 7.CIT 8.Global Offshore
Potential participants
Surpetrol, Capstone Turbine, Collado, Evya, W, Udee
Status AWARDED
Ruling: 28.Jul.09
Construcciones Mecanicas de Monclova: $16million
Updated 28.Jul.09

40. HA-LT-01: Living quarter module [VOID]
Project
187 living quarter module & interconnection bridge
Scope: Engineering/ procurement/ construction/ loading/ fixing/ transport/ installation
Location: Campeche basin GOM
Term: 660 days starting 04.Sep.08
Mailstones:
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $20m+
Contract
Type: Lump sum & unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-004-08
Release: 20.Mar.08
1st clarification meeting: 07.Apr.08
2nd clarification meeting: 18.Apr.08
3rd clarification meeting: 06.May.08
10th clarification meeting & closing: 10.Jul.08
Submission & opening: 16.Jul.08
Registered bidders
1.Dragados 2.Industria del Hierro (ICA Fluor Daniel) 3.Swecomex 4.J Ray McDermott 5.Heerema Marine Contractors 5.Keppel SLP 6.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 7.Oceanografia
Potential participants
Grupo Constructor Global, JA Energy Fab, Tradeco, Evya, Ingelectric, SIDO E, GI, AILT, Industrias W, Alcatel, Swath, AVC, Sari, Thales, Udee, Rockwell, Dynamic Industries, Cygnus
Status VOID
Tender declared VOID (2nd round) on 11.Sep.08
A new RFPs to be announced shortly
Reference
1st-round tender ruled VOID on 19.Jul.07 (full report in next page)
Updated 12.Sep.08

47. Akal-Te [AWARDED]
Project
Thetrapode platform
Scope: Engineering/ procurement/ construction
Location: contractor's yard
Term: 240 days starting 28.Apr.08
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $6m+
Contract
Type: Lump sum & unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-005-08
Release: 07.Feb.08
Site visit: n/a
1st clarification meeting: 14.Feb.08
2nd clarification meeting: 25.Feb.08
3rd clarification meeting: 14.Mar.08 (last)
Closing: 19.Mar.08
Submission & opening: 25.Mar.08
Registered bidders
1.Construcciones y Equipos Latinoamericanos (Protexa) 2.Dragados 3.Industria del Hierro (ICA Fluor Daniel) 4.J Ray McDermott 5.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 6.Swecomex 7.EPI 8.CIT
Status AWARDED
Ruling: 09.May.08
Dragados Offshore de Mexico: $11.5million
Updated 16.May.08

46. Ixtal-B [AWARDED]
Project
Reinforced thetrapode platform
Scope: Engineering/ procurement/ construction/ loading/ fixing
Location: Campeche basin GOM
Term: 360 days starting 05.Mar.08
Mailstones:
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $7m+
Contract
Type: Lump sum & unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-035-07
Release: 11.Dec.07
Site visit: n/a
1st clarification meeting: 13.Dec.07
3rd clarification meeting: 15.Jan.08
Closing: 16.Jan.08
Submission & opening: 22.Jan.08
Registered bidders
1.Industria del Hierro (ICA Fluor Daniel) 2.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 3.Swecomex 4.J Ray McDermott 5.Dragados 6.Construcciones y Equipos Latinoamericanos (Protexa) 7.CIT 8.Shaw
Status AWARDED
Ruling: 11.Feb.08
Construcciones Mecanicas Monclova (COMMSA-GIMSA): $25million
Updated 29.Feb.08

45. Kab-A [AWARDED]
Project
Light structure platform
Scope: Engineering/ procurement/ construction/ loading/ fixing
Location: Campeche basin GOM
Term: 210 days starting 30.Aug.07
Mailstones:
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $3m+
Contract
Type: Lump sum & unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-022-07
Release: 31.May.07
Site visit: n/a
1st clarification meeting: 14.Jun.07
4th clarification meeting: 16.Jul.07 (last)
Closing: 18.Jul.07
Submission & opening: 24.Jul.07
Decision: 08.Aug.07
Registered bidders
1.Industria del Hierro (ICA Fluor Daniel) 2.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 3.Swecomex 4.J Ray McDermott 5.Dragados 6.Grupo Constructor Global 7.Construcciones y Equipos Latinoamericanos (Protexa) 8.CIT
Status AWARDED
Decision: 28.Aug.07
Industria del Hierro (ICA Fluor Daniel): $9.5million
Updated 07.Sep-07

44. Atun-D [AWARDED]
Project
Gathering platform
Scope: Construction
Location: Offshore Tuxpan Veracruz
Term: 329 days starting 10.Aug.07
Mailstones:
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $5.5m+
Contract
Type: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-010-07
Release: 10.May.07
Site visit: n/a
1st clarification meeting: 24.May.07
6th clarification meeting: 26.Jun.07 (last)
Closing: 29.Jun.07
Submission & opening: 05.Jul.07
Registered bidders
1.CIT 2.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 3.Construcciones y Equipos Latinoamericanos (Protexa) 4.Dragados 5.Industria del Hierro (ICA Fluor Daniel) 6.J Ray Mcdermott 7.Swecomex 8.Shaw 9.Oceanografia 10.ABB 11.Grupo Constructor Global
Potential participants
Status AWARDED
Decision: 20.Jul.07
Construcciones Mecanicas Monclova (COMMSA-GIMSA): $19million
Updated 31.Jul.07

43. Sinan-118 [AWARDED]
Project
Light structure platform
Scope: Engineering/ procurement/ construction/ loading/ fixing
Location: Campeche basin GOM
Term: 210 days starting 01.Aug.07
Mailstones:
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $3.25m+
Contract
Type: Lump sum & unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-020-07
Release: 26.Apr.07
Site visit: n/a
1st clarification meeting: 11.May.07
4th clarification meeting: 14.Jun.07 (last)
Closing: 14.Jun.07
Submission & opening: 20.Jun.07
Registered bidders
1.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 2.Industria del Hierro (ICA Fluor Daniel) 3.Dragados 4.Bosnor 5.Shaw 6.Swecomex 7.Construcciones y Equipos Latinoamericanos (Protexa) 8.ICS Triplex 9.JA Energy Fab
Potential participants
CIT. Evya
Status AWARDED
Decision: 20.Jul.07
Construcciones Mecanicas Monclova (COMMSA-GIMSA): $11million
Updated 31.Jul.07

42. Sinan-So [AWARDED]
Project
Light structure platform
Scope: Engineering/ procurement/ construction/ loading/ fixing
Location: Campeche basin GOM
Term: 210 days starting 30.Jul.07
Mailstones:
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $3.75m+
Contract
Type: Lump sum & unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-019-07
Release: 17.Apr.07
Site visit: n/a
1st clarification meeting: 30.Apr.07
6th clarification meeting: 05.Jun.07
Closing: 07.Jun.07
Submission & opening: 13.Jun.07
Registered bidders
1.Bosnor 2.Dragados 3.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 4.Construcciones y Equipos Latinoamericanos (Protexa) 5.Tradeco 6.Industria del Hierro (ICA Fluor Daniel) 7.Shaw 8.Swecomex 9.CIT 10.ICS Triplex
Potential participants
Grupo Constructor Global, INCYQ, Evya
Status AWARDED
Decision: 20.Jul.07
Swecomex: $12million
Updated 31.Jul.07

41. Yaxche-B [AWARDED]
Project
Light structure platform
Scope: Engineering/ procurement/ construction/ loading/ fixing
Location: Campeche basin GOM
Term: 210 days starting 17.Jul.07
Mailstones:
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $3.25m+
Contract
Type: Lump sum & unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-017-07
Release: 03.Apr.07
Site visit: n/a
1st clarification meeting: 23.Apr.07
4th clarification meeting: 28.May.07
Closing: 30.May.07
Submission & opening: 05.Jun.07
Registered bidders
1.Bosnor 2.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 3.Grupo Constructor Global 4.Industria del Hierro (ICA Fluor Daniel) 5.J Ray McDermott 6.Shaw 7.Dragados 8.CIT 9.Tradeco 10.Construcciones y Equipos Latinoamericanos (Protexa) 11.Swecomex 12.ICS Triplex
Potential participants
Industrias W, INCYQ
Status AWARDED
Decision: 19.Jul.07
Industria del Hierro (ICA Fluor Daniel): $11.5million
Updated 31.Jul.07

40. HA-LT-01: Living quarter module [VOID]
Project
187 living quarter module & interconnection bridge
Scope: Engineering/ procurement/ construction/ loading/ fixing/ transport/ installation
Location: Campeche basin GOM
Term: 660 days starting 01.Aug.07
Mailstones:
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $20m+
Contract
Type: Lump sum & unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-013-07
Release: 29.Mar.07
Site visit: 12.Apr.07
1st clarification meeting: 17.Apr.07
8th clarification meeting: 29.May.07
Closing: 29.May.07
Submission & opening: 04.Jun.07
Registered bidders
1.Dragados 2.Industria del Hierro (ICA Fluor Daniel) 3.Swecomex 4.Grupo Constructor Global 5.JA Energy Fab 6.Tradeco 7.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 8.Evya 9.Keppel SLP 10.Ingelectric
Potential participants
SIDO E, GI, AILT, Industrias W, Alcatel, Swath, AVC, Heerema
Status VOID
Tender ruled on 19.Jul.07
A new RFP to be released shortly
Updated 31.Jul.07

___________________________________

FYI, we have got a comprehensive
understanding of these tenders and
offer expert tailor-made assistance to
international companies pursuing projects in Mexico
A description of our services in the bottom page
Contact: mail@aramoni.com
____________________________________


39. Tumut-A: Tetrapod [AWARDED]
Project
Offshore terapod platform
Scope: Engineering/ procurement/ construction/ loading/ fixing
Location: Campeche basin GOM
Term: 330 days starting 13.Jul.07
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $9m+
Contract
Type: Lump sum & unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-009-07
Release: 27.Mar.07
Site visit: n/a
1st clarification meeting: 13.Apr.07
6th clarification meeting: 25.May.07
Closing: 26.May.07
Submission & opening: 01.Jun.07
Registered bidders
1.Swecomex 2.Industria del Hierro (ICA Fluor Daniel) 3.Dragados 4.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 5.Construcciones y Equipos Latinoamericanos (Protexa) 6.Bosnor 7.Shaw 8.J Ray Mcdermott
9.CIT 10.Grupo Constructor Global 11.Tradeco
Potential participants
Industrias W, INCYQ, Ardica
Status AWARDED
Decision: 12.Jul.07
Construcciones Mecanicas Monclova (COMMSA-GIMSA): $24million
Updated 31.Jul.07

38. HA-RE-01: LIVING QUARTER MODULE (2nd round) [VOID]
Project
150 living quarter module & interconnection bridge
Scope: Engineering/ procurement/ construction/ loading/ fixing/ transport/ installation/ interconnection/ testing/ commissioning/ start-up
Location: Rebombeo (re-pumping) complex
Field: Campeche basin GOM
Term: 570 days starting 21.Aug.07
Mailstones:
Living module 480 days
Transport 510 days
Start-up 570 days
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $9m+
Contract
Type: Lump sum & unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-036-06
Release: 26.Dec.06
Site visit: 03.Jan.07
1st clarification meeting: 04.Jan.07
15th clarification meeting: 25.May.07
Closing: 29.May.07
Submission & opening: 04.Jun.07
Decision: 22.Jun.07 (next)
Registered bidders
1.Construcciones Mecanicas de Monclova (GIMSA-COMMSA) 2.Bosnor 3.Swecomex 4.Grupo Constructor Global 5.CIT 6.Ingelectric Norteamerica 7.Industria del Hierro (ICA Fluor Daniel) 8.Dragados 9.CIMISA
Potential participants
Global Offshore, C&M Marine Services USA Heerema Marine Contractors, Teleconstrucciones Mexicanas, Alcatel
Bidders for 1st round
1.Construcciones Mecanicas de Monclova (GIMSA-COMMSA) 2.DMI International 3.Swecomex 4.AR del Golfo 5.Industria del Hierro (ICA Fluor Daniel) 6.CIMISA 7.Keppel SLP 8.Lonestar Marine Shelters 9.Dragados 10.Kepler Constructora
Status VOID
Tender ruled on 19.Jul.07
A new RFP to be released shortly
Updated 31.Jul.07

CHEMUL: Underwater Platform [VOID]
Project
Scope: Katrina’s damage repair & platform full refurbishment
Current location: Atlantic Marine dockyard, Mobile AL
Service location: Contractor’s facilities
Contract
Commissioner: Pemex (Govt)
Type: Unit prices
Term: 435 days
Payments: 30 days after invoice procedures
Selection basis: Best qualified amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Bid follow-up
Ref: 18575107-091-06
Release: 16.Nov.06
Site visit (Atlantic Marine dockyard, Mobile AL): 27.Nov.06
1st clarification meeting (Ciudad del Carmen Campeche): 05.Dec.06
7th meeting & closing: 02.Feb.07
Submission & opening: 08.Feb.07
Registered bidders (not comprehensive)
1.Cotemar 2.KSES USA 3.OIS
Potential participant
Halliburton
Status VOID
Tender ruled on 08.Feb.07
A new RFPs to be announced shortly
Updated 25.May.07

PLATFORM COMPLEMENTARY WORKS (2nd-round) [AWARDED]
Project
Term: 365 days starting 26.Jan.07
Local content: 30%
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Experience: 5 yrs
Combine equity: $45m+
Subcontracts allowed: Catering & accomodation/ X-rays/ ultrasonic inspection/ diving
Contract
Type: Unit prices
Down payment: n/a
Payments: 30 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bid follow-up
Ref: 18575108-084-06
Release: 26.Sep.06
Site visit: 09.Oct.06
8th clarification meeting: 08.Dec.06 (last)
Closing: 08.Dec.06
Submission & opening: 14.Dec.06
Registered bidders
1.Condux (Protexa) 2.Construcciones Integrales del Carmen 3.Diavaz 4.Cotemar 5.Global Offshore 6.Mantenimiento Marino de Mexico (Halliburton) 7.Oceanografia 8.Tradeco
Bidders in 1st round
Oceanografia, Condux (Protexa), Construcciones Integrales del Carmen, Cotemar, Tradeco
Decision: 15.Jan.07
Finalizing: 25.Jan.07
Status AWARDED
Oceanografia: $47million
(Updated 19.Jan.07)

37. HA-CA-01: LIVING QUARTER MODULE [AWARDED]
Project
1. Existing module uninstallation
Scope: Engineering/ dismantlement/ loading/
fixing/ maritime transport/ unloading in
Dos Bocas terminal (Tabasco)/ transport/
final disposition
2. New 150 living module
Scope: Engineering/ procurement/
construction/ testing/ loading/ fixing/
transport/ installation on existing structure
located in Cayo Arcas (Campeche basin)/
interconnection/ commissioning/ start-up
Field: Campeche basin
Term: 570 days starting 18.Oct.06
Bidders profile
Company/consortium from countries having a
free trade agreement with Mexico
Combine equity: $9m+
Subcontracts allowed:
Ships/ offshore catering/ accommodation/
X-rays/ NDT/ radio positioning
Contract
Type: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bid follow-up
Ref: 18575106-011-06
Release: 20.Apr.06
Submission & opening: 04.Sep.06
Decision: 25.Oct.06
Registered bidders: 1.Construcciones Mecanicas de Monclova (GIMSA-COMMSA) 2.Swecomex 3.Industria del Hierro (ICA Fluor Daniel) 4.Construccion Ingenieria y Montaje Integral (CIMISA) 5.Lonestar Marine Shelters 6.GOIMAR 7.Dragados Offshore de Mexico 8.Keppel-SLP 9.AR del Golfo
Status AWARDED
Industria del Hierro (ICA Fluor Daniel): $90million
(Updated 02.Nov.06)

LIVING QUARTER MODULE [CANCELED]
Project
151 living module
Scope: Civil & electromechanical works/ superstructure/ heliport/ interconnection bridge
Location: Rebombeo complex
Field: Campeche basin
Term: 600 days starting 18.Oct.06
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $6.5m+
Contract
Type: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Local content: 51%
Subcontracts allowed: X-rays/ NDT/ project certification
Bid follow-up
Ref: 18575108-039-06
Release: 20.Jun.06
Registered bidders: 1.Construcciones Mecanicas de Monclova (GIMSA-COMMSA) 2.DMI International 3.Swecomex 4.AR del Golfo 5.Industria del Hierro (ICA Fluor Daniel) 6.CIMISA 7.Keppel SLP 8.Lonestar Marine Shelters 9.Dragados 10.Kepler Constructora
Decision: 15.Aug.06: CANCELED
A 2nd-round tender to be announced next year
(Updated 19.Aug.06)

Platform conclusion [VOID]
Project
Equipment related assignments
Scope: EPC
Platforms: AKAL complex
Field: Campeche basin
Term: 452 days from 22.Jun.06 to 02.Sep.07
Bidders profile:
Company/consortium from countries having a
free trade agreement with Mexico
Combine equity: $12m+
Subcontracts allowed: Hot-tapping/ X-rays/
NDT/ PLC setting/ FM-200/ CO2/
offshore catering & accommodation/
satellite positioning/ diving/ risk analysis
Contract:
Type: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from
compliant proposals
Bid follow-up:
Ref: 18575106-008-06
Release: 23.Mar.06
Deadline: 18.May.06
Submission & opening: 24.May.06
Registered bidders: 1.Diavaz 2.Demar 3.Dragados 4.Construcciones Integrales del Carmen 5.Condux (Protexa) 6.Oceanografia 7.Lico Construcciones 8.AR del Golfo 9.GOIMSA
Decision: 08.Jun.06: VOID
A 2nd-round tender to be announced soon
(Updated 16.Jun.06)

Platform linking [AWARDED]
Project
Platform interconnections:
PB-KU-M & HA-KU-M
PB-KU-M & PP-KU-M
PB-KU-S & HA-KU-S
PB-KU-S & PP-KU-S
PP-KU-S & PP-KU-G
PP-KU-S & PP-KU-G
PP-KU-A2 & HA-ZAAP-C
PP-KU-A2 & PP-ZAAP-C
Pipes:
PP-ZAAP-B to PB-ZAAP-C: Oil 24” 2.4 Km
E-KU-A2 to CA-AC-2: Gas 36” 16.8 Km
PI-AC-1 A PP-KU-S: Nitrogen 36” 17.2 Km
PB-KU-S A PP-KU-M: Nitrogene 24” 6.4 Km
PB-KU-S A PP-ZAAP-C: Nitrogene 24” 14 Km
Scope: EPC
Field: Ku-Maloob-Zaap
Term: 270 days from 25.May.06 to 18.Feb.07
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $8.5m+
Subcontracts allowed: Ships/ hot-tapping/ X-rays/ NDT/ PLC setting/ FM-200/ CO2/ offshore catering & accommodation/ satellite positioning/ diving/ risk analysis
Contract
Type: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bid follow-up
Ref: 18575106-007-06
Release: 16.Mar.06
Submission & opening: 20.Apr.06
Registered bidders: 1.Diavaz 2.Demar 3.Oceanografia 4.Condux (Protexa) 5.Jantesa 6.ARB Arendal 7.GOIMSA 8.Construcciones Integrales del Carmen 9.Dragados
Decision: 10.May.06
Demar Instaladora y Constructora: $40million
(Updated 12.May.06)

36. HA-AJ-01:Living quarter module [AWARDED]
Project
1. Existing module uninstallation
Scope: Engineering/ dismantle/ loading/ fixing/ maritime transport/ unloading in Dos Bocas terminal (Tabasco)/ transport/ final disposition
2. New 84 living module
Scope: Engineering/ procurement/ construction/ testing/ loading/ fixing/ transport/ installation/ interconnection/ commissioning/ start-up
Field: Cantarell
Term: 570 days from 30.Jan.06 to 22.Aug.07
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $10m+
Subcontracts allowed: Ships/ offshore catering/ accommodation/ diving/ transport & crane in Dos Bocas terminal
Contract:
Type: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bid follow-up:
Ref: 18575106-027-05
Release: 30.Aug.05
Submission & opening: 14.Dec.05
Registered bidders (not comprehensive): 1.Construcciones y Equipos Latinoamericanos (CELASA-PROTEXA) 2.Swecomex 3.Dragados Offshore Mexico 4.Siemens 5.Construcciones Mecanicas de Monclova (GIMSA-COMMSA) 6.Bosnor 7.Lonestar Marine Shelters 8.Farmadule Emtunga AB 9.Bay Inelectra de Mexico 10.ESPL Optima 11.Delta Engineering Corp 12.Keppel SLP 13.CIMISA 14.Industria del Hierro (ICA Fluor Daniel)
Decision: 25.Jan.06
Swecomex: $60million
(Updated 09.Feb.06)

FPSO Supervision Service (2nd round) [AWARDED]
Scope:
Technical assistance & supervision for engineering/ procurement/ construction/ installation/ testing/ commissioning &
start-up of an FPSO in the GOM
Term: from Nov-05 to Jul-07
Working place: Norway, UAE, Singapore/ US/ Sweden/ Spain & China
Selection basis:
Lowest price bid from qualified proposals
Bid follow-up:
Ref: 18200002-020-05
Release: 24.Nov.05
Submission & offers disclosure: 21.Dec.05
Registered bidders: 1.Intec Engineering (US) 2.Global Project Consultants (US) 3.Cygnus Industrial 4.SGS 5.Bureau Veritas
Decision: 09.Jan.06
Cygnus Industrial: $3.64million
(Updated 20.Jan.06)

35. Carpa-B (Gathering) [AWARDED]
Project description
Technical: Gathering platform
Location: Poza Rica-Altamira
Scope: Engineering/ procurement/ fabrication/ installation
Term: 333 days from 21-Jul-05
Contracts: Unit prices
Down payment: n/a
Payments: 30 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $9m+
Subcontracts allowed: Engineering/ risk analysis/ certification/ sub-inspection/ non-destructive testing/ transport/ installation
Bid follow-up:
Ref: 18575008-012-05
Release: 10-Mar-05
Registration deadline: 20-May-05
Submission: 26-May-05
Registered bidders (not comprehensive): 1.Swecomex 2.Shaw Mexican Holdings 3.Construcciones y Equipos Latinoamericanos (PROTEXA) 4.Stolt Offshore 5.Evya 6.Industria del Hierro (ICA) 7.Construccion Ingenieria y Montaje Integral (CIMISA)
Offers disclosure: 10-Jun-05
Decision: 22-Jul-05
Shaw Mexican Holdings $23million

34. Bagre-C (Gathering) [AWARDED]
Project description
Technical: Gathering platform
Location: Poza Rica-Altamira
Scope: Engineering/ procurement/ fabrication/ installation
Term: 330 days from 09-May-05
Contracts: Unit prices
Down payment: n/a
Payments: 30 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $9m+
Subcontracts allowed: Engineering/ risk analysis/ certification/ sub-inspection/ non-destructive testing/ transport/ installation
82Bid follow-up:
Ref: 18575008-082-04
Release: 28-Dec-04
Submission: 15-Mar-05
Registered bidders: 1.Construcciones y Equipos Latinoamericanos (PROTEXA) 2.Industria del Hierro (ICA) 3.Evya 4.Shaw Mexican Holdings 5.COMINTER 6.CIMISA 7.Swecomex 8.Abengoa Mexico 9.Stolt Offshore
Offers disclosure: 30-Mar-05
Decision: 11-May-05
SIPHNOS $15.6million
(Updated 20-May-05)

a. Offshore transport & installation [VOID]
Project description
Scope/ location: Transport from fabrication yards/ installation in Campeche basin GOM
Platforms included:
Drill: PP-KU-S, PP-ZAAP-A/B/D, PP-CITAM-A, PP-SIHIL-A & PP-AKAL-Q/W
Production: PB-KU-M, PB-KU-S, PB-KU-A2 & PB-KU-H
Living quarters: HA-KU-M/S/H & HA-ZAAP-C
Term: 597 days from 07-May-05
Contracts: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $30m+
Subcontracts allowed: Ship services/ x-ray inspection/ non-destructive testing/ engineering/ diving/ satellite positioning/ ROV/ grommets-chackles-lift frames
Bid follow-up:
Ref: 18575106-047-04
Release: 30-Dec-04
Registration deadline: 11-Mar-05
Submission: 17-Mar-05
Registered bidders: 1.Heerema Marine Contractors Mexico 2.Condux (PROTEXA) 3.Cotemar 4.Servicios Maritimos de Campeche 5.Maritima Mexicana (TMM) 6.Oceanografia 7.Saipem 8.Global Offshore Mexico
Offers disclosure: 05-Apr-05
Decision: 22-Apr-05
VOID
(Updated 25-Apr-05)

33. PP-AKAL-W (Drill)
Project description
Technical: 8-leg drilling platform
Location: Field Cantarell Campeche basin
Scope: Procurement/ fabrication/ testing/ loading/ fixing
Term: 450 days from 20-Dec-04
Contracts: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $7.3m+
Subcontracts allowed:
Bid follow-up:
Ref: 18575106-042-04
Release: 05-Oct-04
Submission: 02-Dec-04
Registered bidders: 1.Industria del Hierro (ICA Fluor Daniel) 2.Dragados Offshore de Mexico 3.Berry Contracting 4.Shaw Mexican Holdings 5.Swecomex 6.Evya 7.Bosnor 8.Construcciones Mecanicas de Monclova (COMMSA) 9.Construcciones y Equipos Lationamericanos CELASA (Protexa) 10.COMINTER 11.Kiewit Offshore Services 12.Construccion Ingenieria y Montaje Integral (CIMISA) 13.Abengoa Mexico
Offers disclosure: 10-Dec-04
Decision: 10-Jan-05
Construcciones Mecanicas de Monclova (COMMSA-GIMSA): $39.5million
(Updated 28-Jan-05)

32. PP-AKAL-Q (Drill)
Project description
Technical: 8-leg drilling platform
Location: Field Cantarell Campeche basin
Scope: Procurement/ fabrication/ testing/ loading/ fixing
Term: 450 days from 20-Dec-04
Contracts: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $7.3m+
Subcontracts allowed:
Bid follow-up:
Ref: 18575106-041-04
Release: 05-Oct-04
Submission: 23-Nov-04
Registered bidders: 1.Industria del Hierro (ICA Fluor Daniel) 2.Dragados Offshore de Mexico 3.Berry Contracting 4.Shaw Mexican Holdings 5.Swecomex 6.Evya 7.Bosnor 8.Construcciones y Equipos Latinoamericanos CELASA (PROTEXA) 9.Construcciones Mecanicas de Monclova (COMMSA) 10.COMINTER 11.Kiewit Offshore Services 12.Abengoa Mexico 13.Delta Engineering Corp 14.Construccion Ingenieria y Montaje Integral (CIMISA)
Decision: 17-Dec-04
Construcciones Mecanicas de Monclova (COMMSA-GIMSA): $40million
(Updated 28-Jan-05)

31. PP-SIHIL-A (Drill)
Project description
Technical: 8-leg drilling platform
Location: Block Sihil Campeche basin
Scope: Procurement/ fabrication/ testing/ loading/ fixing
Term: 450 days from 20-Dec-04
Contracts: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $7.3m+
Subcontracts allowed:
Bid follow-up:
Ref: 18575106-040-04
Release: 05-Oct-04
Submission: 16-Nov-04
Registered bidders: 1.Industria del Hierro (ICA Fluor Daniel) 2.Dragados Offshore de Mexico 3.Berry Contracting 4.Shaw Mexican Holdings 5.Swecomex 6.Evya 7.Bosnor 8.Construcciones y Equipos Latinoamericanos CELASA (PROTEXA) 9.Construcciones Mecanicas de Monclova (COMMSA) 10.COMINTER 11.Kiewit Offshore Services 12.Obras Portuarias de Coatz 13.Nautica Saltamar
Decision: 14-Dec-04
Construcciones Mecanicas de Monclova (COMMSA-GIMSA): $36.5million
(Updated 28-Jan-05)

30. PB-KU-H (Production)
Project description
Field: Ku-Maloob-Zaap
Scope: Engineering/ procurement/ fabrication/ yard testing/ loading/ fixing/ technical assistance for installation/ testing/ commissioning/ start-up
Term: 790 days from 25-Nov-04
Contracts: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $22m+
Subcontracts allowed:
Bid follow-up:
Ref: 18575106-022-04
Release: 08-Jun-04
Submission: 06-Oct-04
Registered bidders: 1.Industria del Hierro (ICA Fluor Daniel) 2.Swecomex 3.Construcciones y Equipos Latinoamericanos (PROTEXA) 4.Maritima Petroleo e Ingenieria de Mexico 5.Turbinas Solar 6.Bosnor 7.Dynamic Industries 8.Odebrecht Oil & Gas Mexico 9.Kiewit Offshore Services 10.Dragados Offshore de Mexico
Decision: 24-Nov-04
Bosnor: $162million
(Updated 29-Nov-04)

28/29. HA-KU-H & ZAAP-C (Living quarters)
Project
Description: 2x220 offshore living quarters including piles sub/superstructures living modules heliport & operational systems
Field: Ku-Maloob-Zaap
Scope: Engineering/ procurement/ fabrication/ yard testing/ loading/ fixing/ technical assistance for installation/ interconnections/ commissioning/ start-up
Term: 663 days from 02-Dec-04
Contracts: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $21m+
Subcontracts allowed: HAZOP/ IPR/ marine services/ X-rays/ non-destructive testing/ engineering/ model/ weighing
Bid follow-up:
Ref: 18575106-027-04
Release: 17-Jun-04
Submission: 22-Oct-04
Registered bidders: 1.SLP Engineering 2.Alianz Petroleum 3.Swecomex 4.Delta Engineering Corporation 5.Construcciones y Equipos Latinoamericanos (PROTEXA) 6.Construcciones Mecanicas de Monclova (COMMSA) 7.Bam Steel Structures 8.Odebrecht Oil & Gas Mexico 9.Berry Contracting 10.Bosnor - Leirvik Module Technology 11.Dynamic Industries 12.Dragados Offshore de Mexico 13.Constructora Bay de Mexico 14.Emtunga 15.CELASA (PROTEXA) 16.Keppel Offshore & Marine 17.Swecomex 18.Technip Offshore 19.Maritima Petroleo e Ingenieria de Mexico
Decision: 10-Dec-04
Berry Contracting - Berry GP - Inelectra: $149million
(Updated 12-Dec-04)

26/27. HA-KU-S & M (Living quarters)
Project
Description: 2x220 offshore living quarters including piles sub/superstructures living modules heliport & operational systems
Field: Ku-Maloob-Zaap
Scope: Engineering/ procurement/ fabrication/ yard testing/ loading/ fixing/ technical assistance for installation/ interconnections/ commissioning/ start-up
Term: 663 days from 08-Nov-04
Contracts: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $25m+
Subcontracts allowed: HAZOP/ IPR/ marine services/ X-rays/ non-destructive testing/ engineering/ model/ weighing
Bid follow-up:
Ref: 18575106-025-04
Release: 03-Jun-04
Registration deadline: 16-Sep-04
Submission: 22-Sep-04
Registered bidders: 1.SLP Engineering 2.Technip Offshore 3.Dragados Offshore Mexico 4.Condux 5.Swecomex 6.Construcciones y Equipos Latinoamericanos (PROTEXA) 7.Alianz Petroleum 8.Delta Engineering Corporation 9.Bam Steel Structures 10.Bosnor 11.Dynamic Industries 12.Keppel Offshore & Marine USA 13.Emtunga 14.Construcciones Maritimas y Terrestres de Tabasco 15.Constructora Bay de Mexico 16.Leirvik Beacom Maritime 17.Maritima Petroleo e Ingenieria de Mexico 18.Odebrecht Oil & Gas Mexico 19.Berry Contracting
Offers disclosure: 07-Oct-04
Decision: 29.Oct.04
Keppel Offshore and Marine USA - SLP Engineering Limited - Anfels - Gulf Island: $164million

25. CITAM-A (4-legs)
Project
Scope: Engineering/ procurement/ fabrication/ loading/ fixing
Term: 365 days from 20-Sep-04
Contracts: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $2.5m+
Subcontracts allowed:
Bid follow-up:
Ref: 18575106-020-04
Release: 03-Jun-04
Submission: 29-Jul-04
Registered bidders (not comprehensive): 1.Constructora Bay de Mexico 2.Construcciones Mecanicas de Monclova (COMMSA) 3.Swecomex 4.Construcciones y Equipos Latinoamericanos (PROTEXA) 5.COMINTER 6.Shaw Global Energy Services-Shaw Mexican Holdings 7.Bosnor 8.Cominter 9.Berry Contracting
Offers disclosure: 13-Aug-04
Decision: 01-Sep-04
Construcciones y Equipos Latinoamericanos (PROTEXA) $24million

24. CB-ZAAP-C (Compression)
Project
Description: Compression platform/ bridge to production PB-ZAAP-C
Field: Ku-Maloob-Zaap
Scope: Engineering/ procurement/ fabrication/ loading/ fixing/ technical assistance for installation/ interconnections/ commissioning/ start-up
Term: 810 days from 05-Nov-04
Contracts: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $20.5m+
Subcontracts allowed:
Bid follow-up:
Ref: 18575106-017-04
Release: 06-May-04
Registration deadline: 17-Sep-04
Submission: 23-Sep-04
Registered bidders: 1.Construcciones y Equipos Latinoamericanos (PROTEXA) 2.Industria del Hierro (ICA Fluor Daniel) 3.Maritima Petroleo e Ingenieria de Mexico 4.Swecomex 5.Keppel Offshore & Marine USA 6.Kiewit Offshore Services 7.Nuovo Pignone 8.Bosnor 9.Tubinas Solar 10.Dragados Offshore Mexico
Offers disclosure: 05-Oct-04
Decision: Cancelled

23. PB-ZAAP-C (Link/production)
Project
Description: Link/production platform/ burner/ bridge to drilling PP-ZAAP-C/ bridge to new living-quarter HA-ZAAP-C/ bridge & 2 tripods to burner
Field: Ku-Maloob-Zaap
Scope: Engineering/ procurement/ fabrication/ loading/ fixing/ technical assistance for installation/ interconnections/ commissioning/ start-up
Term: 790 days from 01-Nov-04
Contracts: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $19.5m+
Subcontracts allowed:
Bid follow-up:
Ref: 18575106-016-04
Release: 06-May-04
Registration deadline: 08-Sep-04
Submission: 14-Sep-04
Registered bidders (not comprehensive): 1.Izar Construcciones 2.Construcciones y Equipos Latinoamericanos (PROTEXA) 3.Industria del Hierro (ICA Fluor Daniel) 4.Turbinas Solar 5.Constructora Bay de Mexico 6.Bosnor 7.Dragados Offshore de Mexico 8.Maritima Petroleo e Ingenieria de Mexico 9.Swecomex 10.Keppel Offshore & Marine USA 11.Kiewit Offshore Services 12.Nuovo Pignone
Offers disclosure: 24-Sep-04
Decision: Cancelled

22. PP-Zaap-A (Drill)
Project
Field: Ku-Maloob-Zaap
Scope: Engineering/ procurement/ fabrication/ loading/ fixing/ technical assistance for installation
Term: 450 days from 20-May-04
Contracts: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $6m+
Subcontracts allowed:
Bid follow-up:
Ref: 18575106-005-04
Release: 29-Jan-04
Submission: 29-Mar-04
Registered bidders (not comprehensive): 1.Industria del Hierro 2.Construcciones y Equipos Latinoamericanos (PROTEXA) 3.Constructora Bay de Mexico 4.Bosnor 5.Construccion Ingenieria y Montaje Integral (CIMISA) 6.Swecomex 7.Maritima Petroleo e Ingenieria de Mexico 8.Swath de Mexico
Offers disclosure: 19-Apr-04
Decision: 07.May.04
ICA Fluor Daniel: $43million

21. PP-Zaap-B (Drill)
Project
Field: Ku-Maloob-Zaap
Scope: Engineering/ procurement/ fabrication/ loading/ fixing/ technical assistance for installation
Term: 450 days from 21-May-04
Contracts: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $5.5m+
Subcontracts allowed:
Bid follow-up:
Ref: 18575106-006-04
Release: 29-Jan-04
Registration deadline: 25-Mar-04
Submission: 31-Mar-04
Registered bidders: 1.Industria del Hierro 2.Construcciones y Equipos Latinoamericanos (PROTEXA) 3.Bosnor 4.Construccion Ingenieria y Montaje Integral (CIMISA) 5.Swecomex 6.Maritima Petroleo e Ingenieria de Mexico 7.Swath de Mexico 8.Constructora Bay de Mexico
Offers disclosure: 20-Apr-04
Decision: 21.May.04
Industria del Hierro (ICA Fluor Daniel): $39million

20. PP-Zaap-D (Drill)
Project
Field: Ku-Maloob-Zaap
Scope: Engineering/ procurement/ fabrication/ loading/ fixing/ technical assistance for installation
Term: 450 days from 24-May-04
Contracts: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $5.7m+
Subcontracts allowed:
Bid follow-up:
Ref: 18575106-007-04
Release: 29-Jan-04
Registration deadline: 27-Mar-04
Submission: 02-Abr-04
Registered bidders: 1.Industria del Hierro 2.Construcciones y Equipos Latinoamericanos (PROTEXA) 3.Constructora Bay de Mexico 4.Dragados Offshore de Mexico 5.Bosnor 6.Swecomex 7.Construccion Ingenieria y Montaje Integral (CIMISA) 8.Maritima Petroleo e Ingenieria de Mexico 9.Swath de Mexico
Offers disclosure: 22-Apr-04
Decision: 21.May.04
Industria del Hierro (ICA Fluor Daniel): $42million

19. PP-KU-S (Drill)
Project
Field: Ku-Maloob-Zaap
Project: Drill platform/ bridge to PP-KU-G (in place)
Scope: Engineering/ procurement/ fabrication/ loading/ fixing/ technical assistance for installation
Term: 450 days from 08-May-04
Contracts: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $5.5m+
Subcontracts allowed:
Bid follow-up:
Ref: 18575106-002-04
Release: 22-Jan-04
Submission: 22-Mar-04
Registered bidders: 1.Dragados Offshore de Mexico 2.Industria del Hierro 3.Construcciones y Equipos Latinoamericanos (PROTEXA) 4.Bosnor 5.Constructora Bay de Mexico 6.Swecomex 7.Construccion Ingenieria y Montaje Integral (CIMISA) 8.Kiewit Offshore Services
Offers disclosure: 05-Apr-04
Decision: 07.May.04
Industria del Hierro (ICA Fluor Daniel): $45million

18. YAXCHE-A (8L-Drill) [AWARDED]
Scope: Engineering/ procurement/ construction/ loading/ fixing
Term/ field/ location: 300 days from 02-Apr-04/ Tabasco littoral/ Gulf of Mexico
Bid follow-up:
Ref: 18575106-010-03
Release: 30-Dec-03
Bidders:
1.Construcciones y Equipos Latinoamericanos (PROTEXA) 2.Bosnor 3.Construccion Ingenieria y Montaje Integral (CIMISA) 4.Swecomex 5.COMINTER
Decision: 22-Mar-04
COMINTER $22.5 million
(Updated 26-Mar-04)

17. PB-KU-M (Production)
Project: Production platform/ burner/ bridge to drilling PP-KU-M (in place)/ bridge to living-quarter HA-KU-M (to be tendered)/ bridge & tripod to burner in KMZ field
Original scope: Engineering/ procurement/ fabrication/ loading/ transport/ installation/ interconnection/ commissioning/ start-up
Actual scope: Engineering/ procurement/ fabrication/ loading/ technical assistance for installation/ interconnection/ commissioning/ start-up
Term: 760 days from 23-Jun-04
Contracts: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $18m+
Subcontracts allowed:
Bid follow-up:
Ref: 18575106-007-03
Release: 23-Dec-03
Registration deadline: 07-May-04
Submission: 13-May-04
Registered bidders: 1.Industria del Hierro (ICA Fluor Daniel) 2.J Ray McDermott 3.Bosnor 4.Swecomex 5.ABB Mexico 6.Construcciones y Equipos Latinoamericanos (PROTEXA) 7.IZAR Construcciones Navales 8.Kiewit Offshore Services 9.Odebrecht Oil & Gas Mexico 10.Shaw Mexican Holdings 11.Construccion Ingenieria y Montaje Integral (CIMISA) 12.Berry Contracting 13.Dragados Offshore 4.COMMISA 15.Evya 16.Technip Offshore 17.Turbinas Solar 18.Swath de Mexico 19.Siemens 20.CPI-Berwanger 21.Maritima Petroleo e Ingenieria de Mexico 22.Comfact Corporation
Offers disclosure: 21-May-04
Decision: 01-Jun-04
Swecomex-Condumex (parent company): $130million

16. PB-KU-S (Production)
Project: Production platform/ burner/ bridge to drilling PP-KU-S/ bridge to living-quarter HA-KU-S/ bridge & tripod to burner in KMZ field
Original scope: Engineering/ procurement/ fabrication/ loading/ transport/ installation/ interconnection/ commissioning/ start-up
Actual scope: Engineering/ procurement/ fabrication/ loading/ technical assistance for installation/ interconnection/ commissioning/ start-up
Term: 880 days from 12-Jul-04
Contracts: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $18m+
Subcontracts allowed:
Bid follow-up:
Ref: 18575106-008-03
Release: 23-Dec-03
Registration deadline: 28-May-04
Submission: 03-Jun-04
Registered bidders: 1.Swecomex 2.Bosnor 3.Dragados Offshore 4.Construccion Ingenieria y Montaje Integral (CIMISA) 5.Grupo Mexicano de Desarrollo (GMD) 6.ABB Mexico 7.Construcciones y Equipos Latinoamericanos (PROTEXA) 8.J Ray McDermott 9.Kiewit Offshore Services 10.Odebrecht Oil & Gas Mexico 11.Siemens 12.Shaw Mexican Holdings 13.Swath de Mexico 15.Dynamic Industries 16.Turbinas Solar 17.Constructora Bay de Mexico 18.Maritima Petroleo e Ingenieria de Mexico
Offers disclosure: 10-Jun-04
Decision: 01-Jul-04
Swecomex: $225million

15. PB-KU-A2 (Production)
Project: Production platform/ burner/ bridge to E-KU-A2 (to be tendered)/ bridge & tripod to burner in KMZ field
Original scope: Engineering/ procurement/ fabrication/ loading/ transport/ installation/ interconnection/ commissioning/ start-up
Actual scope: Engineering/ procurement/ fabrication/ loading/ technical assistance for installation/ interconnection/ commissioning/ start-up
Term: 760 days from 03-Aug-04
Contracts: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $18m+
Subcontracts allowed:
Bid follow-up:
Ref: 18575106-009-03
Release: 23-Dec-03
Registration deadline: 15-Jun-04
Submission: 21-Jun-04
Registered bidders: 1.Dragados Offshore 2.Swecomex 3.ABB Mexico 4.Construcciones y Equipos Latinoamericanos (PROTEXA) 5.J Ray McDermott 6.Kiewit Offshore Services 7.Odebrecht Oil & Gas Mexico 8.Construccion Ingenieria y Montaje Integral (CIMISA) 9.Shaw Mexican Holdings 10.Constructora Bay de Mexico 11.Siemens 12.Turbinas Solar 13.Bosnor 14.Swath de Mexico 15.Maritima Petroleo e Ingenieria de Mexico 16.GIMSA Construcciones Industriales (TRIBASA)
Offers disclosure: 29-Jun-04
Decision: 16-Jul-04
Dragados Offshore de Mexico $185million

13/14. SINAN-A/B (8L-Drill)
Scope: Engineering/ procurement/ construction/ loading
Term/ field/ location: 450 days from 11-Mar-04/ Ku-Maloob-Zaap/ Bay of Campeche
Contracts: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $5.5m+
Subcontracts allowed: Engineering/ rolling/ cranes/ weighing/ non destructive testing
Bid follow-up:
Ref: 18575106-006-03
Release: 02-Dec-03
Top bidders [Clarifications]{Attendances}:
1. Bay de Mexico [112]{2} 2.ICA Fluor Daniel [55]{1} 3.Bosnor [48]{2} 4.Evya [34]{2} 5.Construcciones y Equipos Latinoamericanos (PROTEXA) [39]{1} 6.Swecomex [25]{1} 7.Comercializacion Internacional de Tampico [19]{2} 8.Dragados Offshore Mexico [12]{2} 9.Construccion Ingenieria y Montaje Integral (CIMISA) [12]{2} 10.Construcciones Mecanicas de Monclova (COMMSA/GIMSA) [1]{0}
Submission: 30-Jan-04
Offers disclosure: 11-Feb-04
Decision: 23-Feb-04
Construccion Ingenieria y Montaje Integral (CIMISA) $43million
(Updated 27-Feb-04)

12. Lobina-1 (Gathering)
Scope: Engineering/ procurement/ construction/ installation
Term/ field/ location: 331 days from 22-Mar-04/ Lobina/ Bay of Campeche
Contracts: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $3m+
Subcontracts allowed: Engineering/ x-ray inspection/ transport/ installation/ certification
Bid follow-up:
Ref: 18575106-003-03
Release: 18-Nov-03
Registered bidders: 1.Construcciones Mecanicas de Monclova (COMMSA/GIMSA) 2.ICA Fluor Daniel 3.Shaw Mexican Holdings 4.ABB Mexico 5.Construcciones y Equipos Latinoamericanos (PROTEXA) 6.Evya 7.Industria del Hierro (ICA) 8.BBI 9.Stolt Offshore
Submission: 10-Feb-04
Offers disclosure: 20-Feb-04
Decision: 02-Apr-04
Shaw Mexican Holdings $15.5million
(Updated 02-Apr-04)

10/11. SINAN-C&D (8L-Drill)
Scope: Engineering/ procurement/ construction/ loading
Term/ field/ location: 450 days from 16-Jan-04/ Ku-Maloob-Zaap/ Bay of Campeche
Contracts: Unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $6.75m+
Subcontracts allowed:
Bid follow-up:
Ref: 18575087-017-03
Release: 02-Oct-03
Registered bidders: 1.Industria del Hierro (ICA) 2.Bosnor 3.Construcciones Mecanicas de Monclova (COMMSA/GIMSA) 4.Construcciones y Equipos Latinoamericanos (PROTEXA) 5.Swecomex 6.Comercializadora Internacional de Tampico 7.EVYA 8.Constructora Bay de Mexico 9.Siemens 10.Dragados Offshore de Mexico 11.Honeywell 12.CIGSA Fabricacion 13.Invensys Systems Mexico 14.Emerson Project Management 15.Smar Mexico 16.Construtora Andrade Gutierrez 17.Saw Mexican Holdings 18.Hanover Compression Ltd Partnership 19.ICA Fluor Daniel 20.Energy Land & Sea Projects 21.Construccion Ingenieria y Montaje Integral (CIMISA)
Submission: 04-Dec-03
Offers disclosure: 12-Dec-03
Decision: 16-Jan-04
WINNER: Construcciones Mecanicas de Monclova (COMMSA/GIMSA) $44million
(Updated 22-Jan-04)

9. PP-KU-C (Drill)
Scope: Engineering/ procurement/ construction/ loading/ technical assistance for installation
Term/ field/ location: 525 days from 04-Oct-03/ Ku-Maloob-Zaap/ Gulf of Mexico
Contracts: Unit prices
Down payment: N/A
Payments: 20 days after invoicing procedures
Selection basis: Least offer among technically approved proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $5m+
Subcontracts allowed:
Engineering/ model/ non destructive testing/ weighing/ x-rays/ HAZOP-IPR
Bid follow-up:
Ref: 18575087-015-03
Release: 24-Jul-03
Registered bidders: 1.Swecomex 2.Evya 3.Bosnor 4.Construcciones y Trituraciones 5.Smar Mexico 6.Industria del Hierro (ICA) 7.Comercializacion Internacional Tampico 8.Honeywell 9.CIGSA Fabricacion 10.Aasercath 11.Asociacion en Ingenieria Aplicada 12.ABC Ingenieria Integral 13.ACE Service 14.C-T CAD Ingenieria y Proyectos 15.Ingenieria Total y Construcciones 16.Bufete Constructor America 17.Emerson Process Management 18.Construcciones Mecanicas de Monclova (COMMSA)
Submission: 03-Sep-03
Offers disclosure: 11-Sep-03
Decision: 07-Oct-03
WINNER: Bosnor $37million
(Updated 09-Oct-03)

7/8. PP-Maloob-A&B (Drill)
Scope: Engineering/ procurement/ construction/ loading/ transport (CANCELED)/ technical assistance for installation
Name / term / field/ location:
1. PP-Maloob-A/ 560 days from 29-Sep-03/ Ku-Maloob-Zaap/ Gulf of Mexico
2. PP-Maloob-B/ 590 days from 29-Sep-03/ Ku-Maloob-Zaap/ Gulf of Mexico
Contracts: Unit prices
Payments: 20 days after invoicing procedures
Selection basis: Least offer among technically approved proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $5m+ per contract
Subcontracts allowed:
Engineering/ models/ non destructive testing/ XRays/ weighing/ transport (CANCELED)/ HAZOP/ IPR
Bid follow-up
Ref: 18575087-009-03
Release: 22-May-03
Registered bidders: 1.Swecomex 2.Bosnor 3.ICA Fluor Daniel 4.Emerson Process Management 5.Smar Mexico 6.Duro Felguera 7.Honeywell 8.Equipomex 9.Industria del Hierro 10.CIGSA Fabricacion 11.Promaquina 12.Sodes Mexico 13.Construcciones Mecanicas de Monclova (COMMSA) 14.Construcciones y Equipos Latinoamericanos 15.Constructora Bay de Mexico 16.Siemens 17.Izar Construcciones Navales 18.Invensys Systems Mexico 19.ABB Mexico
Submission: 21-Aug-03
Offers disclosure: 01-Sep-03
Decision: 12-Sep-03
WINNER: Swecomex $80.5million
(Updated 18-Sep-03)

6. Manik-A (Drill)
Scope: Engineering/ procurement/ construction/ loading/ transport (CANCELED)/ certification (CANCELED)
Term/ field/ location: 420 days from 22-Sep-03/ Abkatum/ Gulf of Mexico
Contracts: Unit prices
Payments: 20 days after invoicing procedures
Selection basis: Least offer among technically approved proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $5m+
Subcontracts allowed:
Engineering/ non destructive testing/ weighing/ transport (CANCELED)/ cerfification (CANCELED)
Bid follow-up:
Ref: 18575087-008-03
Release: 29-May-03
Registered bidders: 1.Swecomex 2.Bosnor 3.Smar Mexico 4.ICA Fluor Daniel 5.Duro Felguera 6.Honeywell 7.Industria del Hierro (ICA) 8.CIGSA Fabricacion 9.Constructora Bay de Mexico 10.Construcciones Mecanicas de Monclova 11.Construcciones y Equipos Latinoamericanos 12.Comercializacion Internacional de Tampico 13.Siemens 14.Izar Construcciones Navales
Submission: 06-Aug-03
Decision: 02-Sep-03
WINNER: Swecomex $33.5million
(Updated 03-Sep-03)

5. KU-A2 (Link)
Scope: Engineering/ procurement/ construction/ loading/ transport/ technical assistance for installation (Rev 12-Jun-03)/ testing/ start-up
Project: Ku-Maloob-Zaap
Location: Campeche/KUMAZA field/Gulf of Mexico
Term: 570 days from 20-Aug-03 (Rev 12-Jun-03)
Contract: Unit prices
Payments: 20 days after invoicing procedures
Selection basis: Least offer among technically approved proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $9.5m+ (Rev 12-Jun-03)
Subcontracts allowed: Engineering/ models/ testing/ XRays/ transport/ HAZOP/ IPR
Bid follow-up:
Ref: 18575087-002-03
Release: 10-Apr-03
Bidders: 1.Bufete Industrial 2.Detroit Diesel Allison de Mexico 3.ICA Fluor Daniel 4.Constructora Bay de Mexico 5.Emerson Process Management 6.Smar Mexico 7.Equipos y Servicios VICA 8.Dragados Offshore 9.Swecomex 10.Bosnor 11.Construcciones Mecanicas de Monclova 12.Odebrecht Oil & Gas Mexico 13.Trade Ingenieria y Proyectos 14.CIGSA Fabricacion 15.Honeywell Mexico 16.Invensys Systems Mexico 17.Construcciones y Equipos Latinoamericanos 18.Siemens
Decision: 08-Aug-03
WINNER: Construcciones Mecanicas de Monclova (COMMSA/GIMSA) $48million
(Updated 07-Aug-03)

3/4. MAY-A&B (Drill)
g. Drilling platforms MAY-A & B
Scope: Engineering/ procurement/ construction/ loading/ transport
Location: Campeche/Gulf of Mexico
Term: 462 days starting 18-Jul-03
Contract: Unit prices
Payments: 20 days after invoicing procedures
Selection basis: Least offer among technically approved proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $11m+
Subcontracts allowed: Engineering/ models/ testing/ weighing/ transport/ certification
Bid information
Ref: 18575087-001-03
Release: 12-Mar-03
Register deadline: 04-Jun-03 (Rev 20-May-03) (Done)
Site visit: N/A
1st Bidders meeting: 14-Apr-03 (Done)
2nd Bidders meeting: 23-Apr-03 (Done)
Submission: 10-Jun-03 (Rev 20-May-03) (Next event)
Offers disclosure: 17-Jun-03 (Rev 20-May-03)
Bid follow-up:
Registered bidders (not comprehensive):
1.Cigsa Fabricacion 2.Duro Felguera 3.ICA Fluor Daniel 4.Bosnor 5.Swecomex 6.Corporacion Janko 7.Edemtec 8.Odebrecht Oil & Gas Mexico 9.Trade Ingenieria y Proyectos 10.Integrated Power Systems 11.Equipos y Servicios Vica 12.Reymon de Mexico 13.Constructora Bay de Mexico 14.Construcciones Mecanicas Monclova 15.Dynamic Industries 16.Comercializadora Internacional de Tampico 17.Construcciones y Equipos Latinoamericanos 18.Talleres Navales del Golfo 19.J Ray McDermott
Decision: 01-Jul-03
WINNER: ICA Fluor Daniel $55million
(Updated 04-Jul-03)

2. Ixtal-A (8L-Gathering)
18575038-019-02/ Bay de Mexico

1. Lankahuasa-1 (Gathering)
d. Offshore well recovery platform Lankahuasa 1
Scope: Engineering-Procurement-Construction
Complex: Lankahuasa
Location: Offshore Poza Rica Veracruz
Term: 244 days
Selection basis: Least offer among technically approved proposals
Bidders profile:
Company/consortium
Combine equity: US$3.5m+
Bid information
Ref: 18575008-062-02
Release: 10-Oct-02
Site visit: 14-Oct-02
1st Bidders meeting: 16-Oct-02
2nd Bidders meeting: 23-Oct-02
Register by 06-Nov-02
Submission due: 12-Nov-02
Offers disclosure: 26-Nov-02
Bid follow-up:
Registered bidders (not comprehensive): 1.Bosnor 2.Construcciones Mecanicas Monclova 3.Promotora e Inversora ADISA 4.Comercializacion Internacional de Tampico 5.ICA Fluor Daniel 6.Constructora Bay de mexico 7.Construcciones y Equipos Latinoamericanos 8.Dragados Offshore 9.ABS Group Services Mexico
Decision:
WINNER: ICA Fluor Daniel
(Updated 31-Dec-02)


PEMEX EXPLORATION & PRODUCTION (PEP)

PLATFORM RELATED PROJECTS HISTORY

Offshore works [AWARDED]
Project
Existing offshore facilities
Scope: Engineering/ procurement/ fabrication/ interconnections
Location: Campeche basin GOM
Term: 330 days starting 15.Jul.09
Mailstones:
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $13m+ (175m+ local currency)
Contract
Type: unit prices
Down payment: n/a
Payments: 20 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575106-005-09
Release: 23.Apr.09
Site visit: 27.Apr.09
1st clarification meeting: 28.Apr.09
2nd clarification meeting: 06.May.09
3rd clarification meeting: 28.May.09
4th clarification meeting: 04.Jun.09
5th clarification meeting: 17.Jun.09
Questioning deadline: 25.Jun.09
6th clarification meeting: 26.Jun.09
Closing: 27.Jun.09
Submission & opening: 03.Jul.09
Registered bidders
1.Construcciones Integrales del Carmen 2.Construcciones Mecanicas de Monclova 3.Condux (Protexa) 4.Diavaz 5.Demar 6.Oceanografia 7.HOC Offshore
Potential participants
ARB Arendal
Status AWARDED
Ruling: 16.Jul.09
Demar Instaladora y Constructora: $55million
Updated 17.Jul.09

Offshore equipment recondition [VOID]
Project
Holkan jack-up platform & PM-4500 drilling rig
Scope: Transport & general recondition
Location: Contractor's shipyard
Term: 485 days
Mailstones:
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Contract
Type: Lump sum
Down payment: n/a
Payments: 30 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Local content:
Subcontracts allowed:
Bid follow-up
Ref: 18575107-038-08
Release: 03.Jun.08
Site visit: 23.Jun.08
1st clarification meeting: 24.Jun.08
10th clarification meeting: 30.Oct.08
Closing: 30.Oct.08
Submission & opening: 05.Nov.08
Registered bidders
1.Keppel Amfels 2.Third Ocean Vessel and Rig 3.Dragados Offshore 4.Protexa 5.Swecomex
Potential participants
Evya, Setena
Status VOID
Tender declared VOID on 15.Dec.08
A new RFPs to be announced shortly
Updated 19.Dec.08

Offshore transport & installation [AWARDED]
Project description
Scope: transport & installation of drilling platforms and related structures
Location: Campeche basin GOM
Term: 162 days starting 12.Jan.09
Contracts: Unit prices
Down payment: n/a
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $9m+
Subcontracts allowed:
Bid follow-up:
Ref: 18575106-035-08
Release: 16.Oct.08
Site visit: 24.Oct.08
1st clarification meeting: 29.Oct.08
2nd clarification meeting: 06.Nov.08
3rd clarification meeting: 19.Nov.08
4th clarification meeting: 25.Nov.08
Closing: 30.Nov.08
Submission & opening: 05.Dec.08
Registered bidders (not comprehensive)
1.Condux (Protexa) 2.Heerema 3.J Ray McDermott 4.Oceanografia 5.Saipem America
Status AWARDED
Decision: 18.Dec.08
J Ray McDermott de Mexico: $50million
Updated 20.Jan.09

Offshore maintenance works (3) [AWARDED]
Project description
Scope: Maintenance of offshore platforms with a subsea vessel (CA)
Locations: Campeche basin GOM
Term: 1583 days from 04.Jun.08-01.Sep.08 (window)
Contracts: Unit prices
Down payment: n/a
Local content: +10%
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $17m+
Subcontracts allowed: Inspection for non-destructive testing/ diving/ telecom/ satellite positioning
Bid follow-up:
Ref: 18575108-085-07
Release: 05.Feb.08
Site visit: n/a
1st clarification meeting: 11.Mar.08
2nd clarification meeting: 01.Apr.08
3rd clarification meeting: 09.Apr.08
Closing: 15.Apr.08
Submission & opening: 21.Apr.08
Registered bidders (not comprehensive)
1.Condux (Protexa) 2.Oceanografia 3.Construcciones Integrales del Carmen 4.ARB Arendal 5.Naviera Integral 6.Mantenimiento Marino de Mexico (Halliburton) 7.Subtec 8.Servicios Maritimos de Campeche 9.Cotemar 10.Naviera Petrolera Integral 11.Diavaz
Status AWARDED
Ruling: 09.May.08
Condux (Protexa): $259million
Updated 16.May.08

Offshore transport & installation [AWARDED]
Project description
Scope: transport & installation of light platforms, structures and equipment
Location: Campeche basin GOM
Term: 170 days starting 21.Feb.08
Contracts: Unit prices
Down payment: n/a
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $10m+
Subcontracts allowed:
Bid follow-up:
Ref: 18575106-031-07
Release: 13.Dec.07
Site visit: n/a
1st clarification meeting: 20.Dec.07
3rd clarification meeting: 18.Jan.08
Closing: 18.Jan.08
Submission & opening: 24.Jan.08
Registered bidders (not comprehensive)
1.Condux (Protexa) 2.J Ray McDermott 3.Global Offshore 4.Saipem America 5.Oceanografia 6.Servicios Maritimos de Campeche
Status AWARDED
Ruling: 05.Feb.08
Condux (Protexa): $49million
Updated 07.Feb.08

Liftboat leasing [AWARDED]
Project description
Scope: Support for termination, maintenance & data acquisition of marine wells/ Logistics, installation, dismantlement of modules, structures, units and equipment components for well dirilling & maintenance or for production facilities/ Depth of water 180'+/ Independent legs 250'+ no extensions allowed/ DGPS required
Location: GOM
Term: 548 days from 18.Feb.80 to 18.Aug.09
Contracts: Leasing
Down payment: n/a
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Bid follow-up:
Ref: 18575088-022-07
Release: 18.Oct.07
Site visit: n/a
1st clarification meeting: 05.Nov.07
2nd clarification meeting: 12.Nov.07
3rd clarification meeting: 16.Nov.07
4th clarification meeting: 21.Nov.07
Closing: 23.Nov.07
Submission & opening: 29.Nov.07
Ruling: 19.Dec.07
Finalizing: 08.Jan.07
Registered bidders (not comprehensive)
1.Third Ocean Vessel and Rig 2.Power Marine 3.Cotemar 4.Servicios Maritimos de Campeche 5.Iner Servicios 6. Nabors 7.Perforaciones Maritimas Mexicanas (Protexa) 8.Geomarex 9.Superior Energy Services 10.Todco
Status AWARDED
Ruling: 19.Dec.07
Atlantic Marine Services BV: $31million
Updated 19.Dec.07

Offshore recondition & maintenance (2) [AWARDED]
Project description
Scope: Recondition & maintenance of offshore platforms & process centers with a subsea vessel (CA)
Locations:
Office & yards in Ciudad del Carmen Campeche
Platforms: Campeche basin GOM
Term: 1826 days from 15.Jan.08
Contracts: Unit prices
Down payment: n/a
Local content: +10%
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $42m+
Subcontracts allowed: Inspection for non-destructive testing/ diving/ satellite positioning
Bid follow-up:
Ref: 18575108-052-07
Release: 09.Oct.07
Site visit: n/a
1st clarification meeting: 19.Oct.07
2nd clarification meeting: 09.Nov.07
3rd clarification meeting: 14.Nov.07
Deadline for questioning & 4th clarification meeting: 16.Nov.07
5th clarification meeting: 22.Nov.07
Closing: 22.Nov.07
Submission & opening: 28.Nov.07
Registered bidders (not comprehensive)
1.Servicios Maritimos de Campeche 2.Condux (Protexa) 3.Cotemar 4.Mantenimiento Marino de Mexico (Halliburton) 5.Oceanografia
Status AWARDED
Ruling: 18.Dec.07
Cotemar: $340million
Updated 19.Dec.07

Offshore recondition & maintenance (1) [AWARDED]
Project description
Scope: Recondition & maintenance of offshore platforms with a subsea vessel (SA)
Locations:
Office & yards in Ciudad del Carmen Campeche
Platforms: Campeche basin GOM
Term: 1826 days from 21.Dec.08
Contracts: Unit prices
Down payment: n/a
Local content: +10%
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $24m+
Subcontracts allowed: Inspection for non-destructive testing/ diving/ satellite positioning
Bid follow-up:
Ref: 18575108-057-07
Release: 18.Sep.07
Site visit: n/a
1st clarification meeting: 24.Sep.07
9th clarification meeting & closing: 31.Oct.07
Submission & opening: 06.Nov.07
Registered bidders (not comprehensive)
1.Cotemar 2.Mantenimiento Marino de Mexico (Halliburton) 3.Condux (Protexa) 4.Servicios Maritimos de Campeche 5.Subtec 6.Paredon 7.Oceanografia
Status AWARDED
Ruling: 23.Nov.07
Cotemar: $295million
Updated 07.Feb.08

Offshore maintenance works (5) [AWARDED]
Project description
Scope: Offshore maintenance work with a dynamic positioning vessel
Location: Campeche basin GOM
Term: 5yrs starting 01.Feb.08
Contracts: Unit prices
Down payment: n/a
Local content: +10%
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $21m+
Subcontracts allowed: Inspection for non-destructive testing/ diving/ satellite positioning
Bid follow-up:
Ref: 18575108-045-07
Release: 09.Oct.07
Site visit: n/a
1st clarification meeting: 22.Oct.07
2nd clarification meeting: 05.Nov.07
3rd clarification meeting: 13.Nov.07
4th clarification meeting: 23.Nov.07
5th clarification meeting & closing: 30.Nov.07
Submission & opening: 06.Dec.07
Ruling: 08.Jan.07
Finalizing: 01.Feb.07
Registered bidders (not comprehensive)
1.Condux (Protexa) 2.Servicios Maritimos de Campeche 3.Construcciones Integrales del Carmen 4.Oceanografia 5.Mantenimiento Marino de Mexico (Halliburton) 6.Diavaz 7.Cotemar 8.Subtec
Potential participants
CTM Campeche Construcciones
Status AWARDED
Ruling: 08.Jan.07
Oceanografia: $215million
Updated 18.Jan.08

Offshore maintenance works (4) [DECISION PENDING]
Project description
Scope: Offshore maintenance work with a dynamic positioning vessel
Location: Campeche basin GOM
Term: 5yrs starting 01.March.08
Contracts: Unit prices
Down payment: n/a
Local content: +10%
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $17m+
Subcontracts allowed: Inspection for non-destructive testing/ diving/ satellite positioning
Bid follow-up:
Ref: 18575108-044-07
Release: 21.Aug.07
Site visit: n/a
1st clarification meeting: 18.Sep.07
2nd clarification meeting: 26.Sep.07
5th clarification meeting: 16.Oct.07
6th clarification meeting: 25.Oct.07
7th clarification meeting: 07.Nov.07
8th clarification meeting: 16.Nov.07
9th clarification meeting & closing: 23.Nov.07
Submission & opening: 29.Nov.07
Registered bidders (not comprehensive)
1.Cotemar 2.CTM Campeche Construcciones 3.Servicios Maritimos de Campeche 4.Diavaz 5.Subtec 6.Condux (Protexa) 7.Global Offshore 8.Mexicana de Servicios Subacuaticos 9.Oceanografia 10.ARB Arendal 11.Construcciones Integrales del Carmen 12.TMM 13.CCC
Status SUBMITED
Updated 30.Nov.07/rev 18.Apr.08

Offshore installation works [AWARDED]
Project description
Scope: Installation & recovery of platforms/ installation of heavy equipment
Location: Campeche basin GOM
Term: 1826 days from 09.Apr.08 to 08.Apr.13
Contracts: Unit prices
Down payment: n/a
Local content: 10%
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $55m+
Subcontracts allowed: Inspection for non-destructive testing/ diving/ satellite positioning/ MEBI & METI
Bid follow-up:
Ref: 18575108-029-07
Release: 31.May.07
Site visit: n/a
1st clarification meeting: 29.Jun.07
5th clarification meeting: 31.Jul.07 (last)
Closing: 31.Jul.07
Submission & opening: 06.Aug.07
Registered bidders (not comprehensive)
1.Cotemar 2.Construcciones Integrales del Carmen 3.Global Offshore Mexico 4.Subtec 5.Diavaz 6.Oceanografia 8.Condux (Protexa)
Status AWARDED
Decision: 24.Jan.08
Oceanografia: $445million
Updated 25.Jan.08


PEMEX EXPLORATION & PRODUCTION (PEP)

MSC HISTORY

21. BURGOS VIII-C [CANCELED]
Project
Scope: Gas-field development (drilling/ infrastructure/ maintenance)
Location: Tamaulipas and Nuevo Leon (Burgos basin)
Contract
Commissioner: Pemex-PEP
Term: 1095 days
Type: Unit prices
Front payment: n/a
Local content (other than land material): 3%
Selection basis: Lowest price bid for compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $56+m (700m+ local currency)
Subcontracts allowed: Civil/ drilling/ compression works
Bid follow-up
Ref: 18575110-003-09
Release: 25.Jun.09
Site visit: 10.Jul.09
1st clarification meeting: 13.Jul.09
2nd clarification meeting: 24.Jul.09
3rd clarification meeting: 31.Jul.09
4th clarification meeting: 14.Aug.09
5th clarification meeting: 03.Sep.09
6th clarification meeting: 14.Sep.09
7th clarification meeting: 29.Sep.09
8th clarification meeting: 15.Oct.09
9th clarification meeting: 29.Oct.09
10th clarification meeting: 11.Nov.09
11th clarification meeting: 02.Dec.09
Registered bidders
1.Baker Hughes 2.BJ Services 3.Industrial Perforadora de Campeche (IPC) 4.Nabors 5.Dowell Schlumberger 6.Perforadora Mexico 7.Weatherford 8.Halliburton
Potential participants
ICA Fluor Daniel, H&L, Cameron, Merco, ESA, SAPI, CCC, Proyectos y Desarrollos de Infraestructura
Status CANCELED
Ruling: 02.Dec.09
A new RFPs to be announced early 2010
Updated 08.Dec.09

20. BURGOS VIII-B [CANCELED]
Project
Scope: Gas-field development (drilling/ infrastructure/ maintenance)
Location: Tamaulipas and Nuevo Leon (Burgos basin)
Contract
Commissioner: Pemex-PEP
Term: 1095 days
Type: Unit prices
Front payment: n/a
Local content (other than land material): 3%
Selection basis: Lowest price bid for compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $56+m (700m+ local currency)
Subcontracts allowed: Civil/ drilling/ compression works
Bid follow-up
Ref: 18575110-002-09
Release: 25.Jun.09
Site visit: 03.Jul.09
1st clarification meeting: 06.Jul.09
2nd clarification meeting: 14.Jul.09
3rd clarification meeting: 21.Jul.09
4th clarification meeting: 28.Jul.09
5th clarification meeting: 04.Aug.09
6th clarification meeting: 14.Aug.09
7th clarification meeting: 24.Aug.09
8th clarification meeting: 10.Sep.09
9th clarification meeting: 22.Sep.09
10th clarification meeting: 08.Oct.09
11th clarification meeting: 20.Oct.09
12th clarification meeting: 04.Nov.09
13th clarification meeting: 24.Nov.09
14th clarification meeting: 15.Dec.09
Registered bidders
1.Baker Hughes 2.BJ Services 3.CGGVeritas Services 4.Global Geophysical Services 5.Halliburton 6.Industrial Perforadora de Campeche (IPC) 7.Nabors 8.PGS 9.Servicios Integrales GSM (Carso) 10.Zapata Internacional 11.Perforadora Mexico 12.Weatherford 13.Dowell Schlumberger
Potential participants
Tubacero, Procarsa, Maquinaria Obra y Desarrollo, Tubos de Acero de Mexico, Cameron, Merco, H&L
Status CANCELED
Ruling: 15.Dec.09
A new RFPs to be announced early 2010
Updated 18.Dec.09

19. BURGOS VIII-A [AWARDED]
Project
Scope: Gas-field development (drilling/ infrastructure/ maintenance)
Location: Tamaulipas and Nuevo Leon (Burgos basin)
Contract
Commissioner: Pemex-PEP
Term: 1095 days from 14.Sep.09 to 12.Sep.12
Type: Unit prices
Front payment: n/a
Local content (other than land material): 3%
Selection basis: Lowest price bid for compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $56+m
Subcontracts allowed: Civil/ drilling/ compression works
Bid follow-up
Ref: 18575110-001-09
Release: 07.Apr.09
Site visit: 15.Apr.09
1st clarification meeting: 16.Apr.0913
2nd clarification meeting: 23.Apr.09
3rd clarification meeting: 30.Apr.09
4th clarification meeting: 08.May.09
5th clarification meeting: 15.May.09
6th clarification meeting: 22.May.09
2nd Site visit: 25.Apr.09
7th clarification meeting: 29.May.09
8th clarification meeting: 05.Jun.09
9th clarification meeting: 12.Jun.09
10th clarification meeting: 19.Jun.09 (last)
Closing: 26.Jun.09
Submission & opening: 02.Jul.09
Registered bidders
1.Industrial Perforadora de Campeche (IPC) 2.Techint 3.Iberoamericana de Hidrocarburos (Block Nejo) 4.Nabors 5.D&S Petroleum 6.Servicios Integrales GSM (Carso) 7.H&L 8.Halliburton 9.Weatherford 10.Dowell Schlumberger 11.Petrotec 12.Baker Hughes 13.BJ Services 14.Turbinas Solar 15.ICA Fluor Daniel 16.Cobra 17.Perforadora Mexico 18.Lewis Energy (Block Olmos)
Potential participants
Constructora y Perforadora Latina, Perforaciones Maritimas Mexicanas, Cameron, Wood Group Pressure, RAM-100 de Sureste, Vam, Premium, Mirsa, TS, CCC
Submitted proposals
1.Industrial Perforadora de Campeche (IPC)
2.CCC Frabricaciones y Construcciones
3.Halliburton - Grey Wolf International
4.Weatherford
5.Dowell Schlumberger - Ofs Servicios - Helmerich & Payne Rasco Inc - ICA Flour Daniel
Status AWARDED
Ruling: 17.Aug.09
Industrial Perforadora de Campeche (IPC): $578million
Updated 21.Aug.09

18. CHICONTEPEC V [VOID]
Project
Scope: Integrated works/services for drilling & termination of onshore oil fields
Location: Veracruz-Puebla
Contract
Commissioner: Pemex-PEP
Term: 1096 days
Type: Unit prices
Front payment: n/a
Local content (other than land material): 3%
Selection basis: Lowest price bid for compliant proposals
Bidders profile
Company/consortium
Combine equity: $18+m
Subcontracts allowed: n/a
Bid follow-up
Ref: 18575051-005-09
Release: 24.Feb.09
Site visit: n/a
1st clarification meeting: 27.Feb.09
2nd clarification meeting: 02.Mar.09
3rd clarification meeting: 06.Mar.09
Closing: 07.Apr.09
Preliminary revision of proposal packages: 08.Apr.09
Submission & opening: 13.Apr.09
Ruling: 11.May.09
Registered bidders
1.Servicios Integrales GSM (Carso) 2.Industrial Perforadora de Campeche (IPC) 3.BJ Services 4.D&S Petroleum 5.Halliburton 6.Baker Hughes 7.Sinopec 8.Constructora y Perforadora Latina 9.Perforaciones Maritimas Mexicanas 10.Weatherford
Potential participants
Cameron, Wood Group Pressure
Status VOID
Tender declared VOID on 11.May.09
A new RFPs to be announced shortly
Updated 15.May.09

17. CHICONTEPEC IV [AWARDED]
Project
Scope: Integrated works/services for drilling & termination of onshore oil fields
Location: Veracruz-Puebla
Contract
Commissioner: Pemex-PEP
Term: 1167day starting 08.Apr.09
Type: Unit prices
Front payment: n/a
Local content (other than land material): 3%
Selection basis: Lowest price bid for compliant proposals
Bidders profile
Company/consortium
Combine equity: $6+m
Subcontracts allowed: Road/platform construction/ infrastructure complementary works
Bid follow-up
Ref: 18575051-046-08
Release: 18.Dec.08
Site visit: 14.Jan.09
1st clarification meeting: 29.Dec.08
2nd clarification meeting: 12.Jan.09
3rd clarification meeting: 20.Jan.09
5th clarification meeting: 04.Feb.09
6th clarification meeting: 11.Feb.09 (last)
Closing: 20.Feb.09
Preliminary revision of proposal packages: 20.Feb.09
Submission & opening: 26.Feb.09
Ruling: 27.Mar.09
Finalizing: 08.Apr.09
Registered bidders
1.Servicios Integrales GSM (Carso) 2.Cryoinfra 3.Industrial Perforadora de Campeche (IPC) 4.BJ Services 5.Parker Drilling 6.D&S Petroleum 7.Nabors 8.Dowell Schlumberger 9.Halliburton 10.Baker Hughes 11.Petrotec 12.Sinopec 13.Wheaterford 14.MI Drilling Fluids 15.Constructora y Perforadora Latina
Potential participants
ICA Fluor Daniel, Tradeco, Cameron, Turbinas Solar, MI Drilling Fluids, Oilpatch Enterprises, Vetco Gray, ABB, Emerson Process Management
Submitted proposals
1.Constructora y Perforadora Latina
2.Halliburton de México
3.Baker Hughes de México - Baker Hughes Operations México - BH Services
4.Weatherford de México
5.PSI Logística y Servicios - Firstdrill Limited - Grupo Constructor Frasisa
6.World Wide Pico - Coastal Drilling Land Company LLC - JPT Consulting and Services
7.Industrial Perforadora de Campeche
Status AWARDED
Ruling: 27.Mar.09
WEATHERFORD DE MEXICO: $646million
Updated 30.Mar.09

16. CHICONTEPEC III [AWARDED]
Project
Scope: Integrated works/services for drilling & termination of onshore oil fields
Location: Veracruz-Puebla
Contract
Commissioner: Pemex-PEP
Term: 1187day
Type: Unit prices
Front payment: n/a
Local content (other than land material): 3%
Selection basis: Lowest price bid for compliant proposals
Bidders profile
Company/consortium
Combine equity: $6+m
Subcontracts allowed: Road/platform construction/ infrastructure complementary works
Bid follow-up
Ref: 18575051-044-08
Release: 11.Dec.08
Site visit: 14.Jan.09
1st clarification meeting: 18.Dec.08
2nd clarification meeting: 26.Dec.08
3rd clarification meeting: 09.Jan.09
4th clarification meeting: 16.Jan.09
5th clarification meeting: 23.Jan.09
6th clarification meeting: 30.Jan.09
7th clarification meeting: 09.Feb.09
Closing: 13.Feb.09
Preliminary revision of proposal packages: 13.Feb.09
Submission & opening: 19.Feb.09
Ruling: 10.Mar.09
Finalizing: 01.Apr.09
Registered bidders
1.Andrews Technologies-GWDC 2.D&S Petroleum 3.Industrial Perforadora de Campeche (IPC) 4.Nabors 5.Servicios Integrales GSM (Carso) 6.BJ Services 7.Dowell Schlumberger 8.Halliburton 9.Baker Hughes 10.Petrotec 11.MI Drilling Fluids 12.Constructora y Perforadora Latina 13.Perforaciones Maritimas Mexicanas 14.Zapata Internacional 15.JPT Consulting and Services 16.Wheaterford 17.GL del Centro de Panama 18.Parker Drilling
Potential participants
ICA Fluor Daniel, Tradeco, Turbinas Solar, Oilpatch Enterprises, Vetco Gray, ABB, Emerson Process Management, Grupo Administrador de Recursos Organizacionales, Cameron, Vetramex, PICO, Cryoinfra
Submitted proposals
1. Baker Hughes - B.H Services - Nabors - ARB Arendal
2. Dowell Schlumberger - OFS Servicios- Drillers Technology
3. Halliburton
4. Weatherford
Status AWARDED
Ruling: 10.Mar.09
Dowell Schlumberger - OFS Servicios - Drillers Technology: $687million
Updated 11.Mar.09

15. CHICONTEPEC II [AWARDED]
Project
Scope: Integrated works/services for expoitation of onshore oil fields
Location: Veracruz-Puebla
Contract
Commissioner: Pemex-PEP
Unit prices
Term: 4yrs
Selection basis: Lowest price bid for compliant proposals
Bidders profile
Company/consortium
Combine equity: $43+m
Subcontracts allowed:
Bid follow-up
Ref: 18575051-050-06
Release: 02.Jan.07
Site visit: 16.Jan.07
1st clarification meeting: 23.Jan.07
2nd clarification meeting: 02.Feb.07
3rd clarification meeting: 09.Feb.07
4th clarification meeting: 15.Feb.07
5th clarification meeting: 21.Feb.07
6th clarification meeting: 22.Feb.07
7th clarification meeting: 21.Mar.07
8th clarification meeting: 02.Apr.07 (last)
Closing: 02.May.07
Preliminary revision of proposal packages: 03.May.07
Submission & opening: 08.May.07
Registered bidders
1.D&S Petroleum 2.ICA Fluor Daniel 3.Industrial Perforadora de Campeche (IPC) 4.Servicios Integrales GSM (Carso) 5.Tradeco 6.Baker Hughes 7.Turbinas Solar 8.MI Drilling Fluids 9.Dowell Schlumberger 10.Halliburton 11.Oilpatch Enterprises
Potential participants
Vetco Gray, ABB, Emerson Process Management
Status AWARDED
Decision: 13.Jun.07
DOWELL SCHLUMBERGER DE MEXICO: $1395million
Updated 25.Jun.07

14. BLOCK EURO [VOID]
Project
Scope: Gas field development/ infrastructure/ maintenance
Location: Burgos basin
Contract
Commissioner: Pemex-PEP
Unit prices
Term: 15yrs starting 02.May.07
Selection basis: Lowest price bid for compliant proposals
Bidders profile
Company/consortium
Combine equity: $14+m
Subcontracts allowed:
Any activity but project management
Bid follow-up
Ref: 18575110-036-06
Release: 10.Aug.06
Site visit: 24.Aug.06
7th clarification meeting: 12.Jan.07
8th clarification meeting: 26.Jan.07
9th clarification meeting: 15.Feb.07
10th clarification meeting: 21.Feb.07
Deadline for registration: 28.Feb.07
Submission & opening: 06.Mar.07
Decision: 06.Mar.07
Registered bidders
1.Repsol 2.Swecomex 3.Tecpetrol (Techint) 4.PTD (Petrobras) 5.Creatica 6.Cobra 7.EnCana 8.Petrodomos 9.GOIMSA
Potential participants
Global Drilling Fluids
Status
Tender declared VOID on 06.Mar.07
A new RFPs to be announced shortly
Updated 09.Mar.07

13. BLOCK MONCLOVA [AWARDED]
Project
Scope: Gas field development/ infrastructure/ maintenance
Location: Burgos basin
Contract
Commissioner: Pemex-PEP
Unit prices
Term: 15yrs starting 02.May.07
Selection basis: Lowest price bid for compliant proposals
Bidders profile
Company/consortium
Combine equity: $14+m
Subcontracts allowed: Any activity but project management
Bid follow-up
Ref: 18575110-035-06
Release: 10.Aug.06
Site visit: 23.Aug.06
7th clarification meeting: 11.Jan.07
8th clarification meeting: 24.Jan.07
9th clarification meeting: 14.Feb.07
10th clarification meeting: 20.Feb.07
Deadline for registration: 07.Mar.07
Submission & opening: 13.Mar.07
Decision: 22.Mar.07
Registered bidders
1.Repsol 2.PTD (Petrobras) 3.Construcciones Mecanicas de Monclova (COMMSA) 4.Creatica 5.Lewis 6.Minera Carbonifera Rio Escondido (GAN) 7.Coahuila Industrial Minera (GAN) 8.Monclova Pirineos Gas 9.EnCana 10.Perforadora Central
Status AWARDED
Construcciones Mecanicas de Monclova (COMMSA): $440million
Updated 23.Mar.07

12 BLOCK NEJO [AWARDED]
Project
Scope: Gas field development/ infrastructure/ maintenance
Location: Burgos basin
Contract
Commissioner: Pemex-PEP
Unit prices
Term: 15yrs starting 02.May.07
Selection basis: Lowest price bid for compliant proposals
Bidders profile
Company/consortium
Combine equity: $14+m
Subcontracts allowed: Any activity but project management
Bid follow-up
Ref: 18575110-034-06
Release: 10.Aug.06
Site visit: 22.Aug.06
7th clarification meeting: 10.Jan.07
8th clarification meeting: 22.Jan.07
9th clarification meeting: 13.Feb.07
10th clarification meeting: 19.Feb.07
Deadline for registration: 21.Feb.07
Submission & opening: 27.Feb.07
Decision: 05.Mar.07
Registered bidders (not comprehensive)
1.Repsol 2.Cobra 3.PTD (Petrobras) 4.Tecpetrol (Techint) 5.Swecomex 6.EnCana 7.Perforadora Central
Status AWARDED
Grupo Cobra (es): $930million
Updated 09.Mar.07

11. PANDURA-ANAHUAC
Scope: Gas field development/ infrastructure/ maintenance
Location: Burgos basin
Term: 15yrs from 14.Jan.05
Contract: Unit prices
Down payment: n/a
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium
Combine equity: $10+m
Subcontracts allowed: Any activity but contract/project management
Bid follow-up:
Ref: 18575008-060-04
Release: 29.Jul.04
Submission: 26.Oct.04
Registered bidders: 1.Industrial Perforadora de Campeche (IPC) 2.CNPC Services Venezuela Ltd 3.Monterrey Services and Technology 4.Constructora y Perforadora Latina 5.Itera International Energy Corporation 6.Halliburton de Mexico
Decision: 26.Oct.04
WINNER: Industrial Perforadora de Campeche (Mx) - Desarrollo y Servicio Petrolero (Mx)/ $900million/ 15yrs
(Updated 27.Oct.04)

10. RICOS
Scope: Gas field development/ infrastructure/ maintenance
Location: Burgos basin
Term: 15yrs from 14.Jan.05
Contract: Unit prices
Down payment: n/a
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium
Combine equity: $10+m
Subcontracts allowed: Any activity but contract/project management
Bid follow-up:
Ref: 18575008-061-04
Release: 29.Jul.04
1st Bidders meeting: 07.Sep.04
2nd Bidders meeting: 22.Sep.04
3rd Bidders meeting: 05.Oct.04
4th Bidders meeting: 13.Oct.04
5th Bidders meeting: 25.Oct.04 (next event)
Registration deadline: 03.Nov.04
Submission: 09.Nov.04
Registered bidders: 1.Constructora y Perforadora Latina 2.Dowell Schlumberger de Mexico 3.Industrial Perforadora de Campeche (IPC) 4.Itera International Energy Corporation 5.Monterrey Services & Technology
Offers disclosure: 11.Nov.04
Decision: 08.Feb.05/ VOID
(Updated 14.Oct.04)

9. MONCLOVA
Scope: Gas field development/ infrastructure/ maintenance
Location: Burgos basin
Term: 15yrs from 21.Jan.05
Contract: Unit prices
Down payment: n/a
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium
Combine equity: $5+m
Subcontracts allowed: Any activity but contract/project management
Bid follow-up:
Ref: 18575008-064-04
Release: 17.Aug.04
1st Bidders meeting: 06.Oct.04
2nd Bidders meeting: 18.Oct.04 (next event)
Registration deadline: 01.Dec.04
Submission: 07.Dec.04
Registered bidders: 1.Hullera Mexicana
Potential bidders: 1.Hoper's 2.FIEMSA 3.Technopet 4.CORROSA 5.COIMSA 6.GIMSA Montajes 7.Vetra Group 8.Benchmark Pipeline 9.Cody E Oil
Offers disclosure: 09.Dec.04
Decision: 15.Feb.06
WINNER: Hullera Mexicana (Mx) - Energy Milenium (Mx) - Andrews Technologies de Mexico (Mx)- Yuma Exploration (US) - Aries Operating (US)/ $456million/ 15yrs
(Updated 16.Feb.05)

8. PIRINEO
Scope: Gas field development/ infrastructure/ maintenance
Location: Burgos basin
Term: 15yrs from 21.Jan.05
Contract: Unit prices
Down payment: n/a
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium
Combine equity: $5+m
Subcontracts allowed: Any activity but contract/project management
Bid follow-up:
Ref: 18575008-065-04
Release: 17.Aug.04
1st Bidders meeting: 07.Oct.04
2nd Bidders meeting: 19.Oct.04 (next event)
Registration deadline: 08.Dec.04
Submission: 14.Dec.04
Registered bidders: 1.Hullera Mexicana
Potential bidders: 1.Andrews Technologies 2.CNPC Services Venezuela Ltd 3.Technopet 4.Benchmark Pipeline International 5.COIMSA 6.GIMSA Montajes 7.Vetra Group
Offers disclosure: 16.Dec.04
Decision: 24.Feb.05
WINNER: Constructora Industrial Monclova (Mx) - Materiales La Gloria (Mx) - Alianz Petroleum (Mx) - Steel Serv (Mx) - Suelopetrol (Ve) - NCT (Ve) - Petrotesting Colombia (Co)/ $645million/ 15 yrs
(Updated 25.Feb.05)

7. OLMOS
Scope: Gas field development/ infrastructure/ maintenance
Location: Burgos basin
Term: 15yrs from 20.Feb.04
Contract: Unit prices
Down payment: n/a
Selection basis: Lowest price bid from qualified proposals
Bidders profile:
Company/consortium
Combine equity: $5+m
Subcontracts allowed: Any activity but contract/project management
Bid follow-up:
Ref: 18575008-138-03
Release: 29.Jul.03
Registered bidders: 1.Lewis Energy Group
Submission: 14.Jan.04
Offers disclosure/decision: 15.Jan.04
WINNER: Lewis Energy Group $343.6million for 15yrs
(Updated 16.Jan.04)

6. FRONTERIZO
Scope: Gas field development/ infrastructure/ maintenance
Location: Burgos Basin
Term: 15yrs from 09.Jan.04
Contract: Unit prices
Down payment: n/a
Selection basis: Least offer among technically approved proposals
Bidders profile:
Company/consortium
Combine equity: $4+m
Subcontracts allowed: Any activity but contract/project management
Bid follow-up:
Ref: 18575008-137-03
Release: 29.Jul.03
Registered bidders: 1.Skanska Mexico 2.D&S Petroleum (sole qualified bidder) 3.Nexen Petroleum International 4.Amistad Energy Corp (disqualified)
Submission: 18.Nov.03
Offers disclosure/decision: 19.Nov.03
WINNER: Petroleo Brasileiro Mexico: Petrobras-Teikoku Oil Co-D&S Petroleum (Diavaz) $265million for 15yrs
(Updated 19.Nov.03)

5. RICOS
Scope: Gas field development/ infrastructure/ maintenance
Location: Burgos Basin
Term: 20yrs from 09.Jan.04
Contract: Unit prices
Down payment: n/a
Selection basis: Least offer among technically approved proposals
Bidders profile:
Company/consortium
Combine equity: $32.5+m
Subcontracts allowed: Any activity but contract/project management
Bid follow-up:
Ref: 18575008-128-03
Release: 17.Jul.03
Registered bidders: 1.Exxon Mobil 2.Totalfina Oil & Gas Mexique 3.Obrascon Huarte Lain 4.Repsol Exploracion
Submission: 12.Nov.03
VOID: No proposals submitted
(Updated 13.Nov.03)

4. CORINDON-PANDURA
Scope: Gas field development/ infrastructure/ maintenance
Location: Burgos Basin
Term: 20yrs from 09.Jan.04
Contract: Unit prices
Down payment: n/a
Selection basis: Least offer among technically approved proposals
Bidders profile:
Company/consortium
Combine equity: $71.5+m
Subcontracts allowed: Any activity but contract/project management
Bid follow-up:
Ref: 18575008-131-03
Release: 17.Jul.03
Registered bidders:1.Totalfina Oil and Gas Mexique 2.Repsol Exploracion/YPS 3.D&S Petroleum 4.Halliburton de Mexico 5.Techint
Submission: 05.Nov.03
VOID: No proposals submitted
(Updated 05.Nov.03)

3. MISION
Scope: Gas field development/ infrastructure/ maintenance
Location: Burgos Basin
Term: 20yrs from 09.Jan.04
Contract: Unit prices
Down payment: n/a
Selection basis: Least offer among technically approved proposals
Bidders profile:
Company/consortium
Combine equity: $10.5+m
Subcontracts allowed: Any activity but contract/project management
Bid follow-up:
Ref: 18575008-130-03
Release: 17.Jul.03
Registered bidders (not comprehensive): 1.Techint (sole actual bidder) 2.Repsol Exploracion/YPS 3.D&S Petroleum 4.Exxon Mobil Mexico 5.Totalfina Oil and Gas Mexique
Submission: 29.Oct.03
Offers disclosure/decision: 30.Oct.03
WINNER: Elina del Bajio: Elina-Techint-Industrial Perforadora de Campeche (IPC) $1,036million for 20yrs
(Updated 30.Oct.03)

2. CUERVITO
Scope: Gas field development/ infrastructure/ maintenance
Location: Burgos Basin
Term: 15yrs from 09.Jan.04
Contract: Unit prices
Down payment: n/a
Selection basis: Least offer among technically approved proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $9+m
Subcontracts allowed: Any activity but contract/project management
Bid follow-up:
Ref: 18575008-136-03
Release: 29.Jul.03
Registered bidders (not comprehensive): 1.Techint 2.D&S Petroleum (sole actual bidder) 3.Nexen Petroleum International
Submission: 22.Oct.03
Offers disclosure/decision: 23.Oct.03
WINNER: Petrobras/Teikoku Oil Co/D&S Petroleum (Diavaz) $260million for 15yrs
(Updated 23.Oct.03)

1. REYNOSA-MONTERREY
Scope: Gas field development/ infrastructure/ maintenance
Location: Burgos Basin
Term: 20yrs from 09.Jan.04
Contract: Unit prices
Down payment: n/a
Selection basis: Least offer among technically approved proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $43+m
Subcontracts allowed: Any activity but contract/project management
Bid follow-up:
Ref: 18575008-129-03
Release: 17.Jul.03
Registered bidders: 1.Repsol Exploracion/YPS (sole actual bidder) 2.Exxon Mobil Mexico 3.Totalfina Oil and Gas Mexique 4.Halliburton Mexico
Submission: 15.Oct.03
Offers disclosure: 16.Oct.03
Decision: 16.Oct.03
WINNER: Repsol Exploracion/YPS $2,437million for 20yrs
(Updated 16.Oct.03)


PEMEX EXPLORATION & PRODUCTION (PEP)

PIPELINE INTEGRITY PROJECT
• System 3 [AWARDED: Norpower-Tecpetrol (Techint) $266million]
• System 1: 1500+ km [AWARDED: DMGP Servicios de Integridad (Diavaz - Mexub) $1.3billion for 10yrs]

PIPELINE INTEGRITY PROJECT-3 AWARDED
Project
Description:
Scope:
a.Network modernization & maintenance (pipeline & facilities)
b.Operational technical assistance
System 3:
Location: Tabasco Veracruz Chiapas Oaxaca
Contract
Commissioner: Pemex (PEP)
Type: MSC (unit prices)
Term: 10yrs starting 11.Jan.10
Payment/milestone:
Fronting:
Selection basis: Best qualified amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $13m+
Experience required:
Subcontracting: Everything allowed but project management
Bid follow-up
Ref: 18575111-003-09
Release: 21.May.09
Site visit: 09.Jun.09
1st clarification meeting: 16.Jun.09
2nd clarification meeting: 25.Jun.09
3rd clarification meeting: 09.Jul.09
2nd site visit: 13-17.Jul.09
4th clarification meeting: 30.Jul.09
5th clarification meeting: 13.Aug.09
6th clarification meeting: 03.Sep.09
Questioning deadline: 14.Oct.09
Closing: 16.Oct.09
Submission & opening: 22.Oct.09
Registered bidders (not comprehensive)
1.EMS Energy Services 2.Oceanografia 3.Techint 4.Fermaca Pipeline del Golfo 5.Promigas 6.ARB Arendal 7.ACS
Potential participants
Dresser, Gasintecsa, Gasoductos y Estructuras del Norte, Petrolera Mixcoac, Servicios Marinos y Terrestres, DMGP, Dragados, Grupo Olimpo, Diavaz, Siemens, Schrader Camargo, Condux (Protexa), Global Offshore, Itochu, Williams International Company, Construcciones Integrales del Carmen, Edison Chovest Offshore, Evya, Greystar, Penspen, Tecno R, Tenaris, Dica, Deep Ocean, Tradeco, Ecomex, Marcos y Asociados, Bureau Veritas
Status AWARDED
Ruling: 05.Nov.09
Norpower-Tecpetrol (Techint): $266million
Updated 10.Nov.09

PIPELINE INTEGRITY PROJECT-1 [AWARDED]
Project
Description:
Scope:
a.Network modernization & maintenance (pipeline & facilities)
b.Operational technical assistance
System 1: 1500+ km
Location: on/offshore Tabasco and Campeche
Contract
Commissioner: Pemex (PEP)
Type: MSC (unit prices)
Term: 10yrs starting 04.May.09
Payment/milestone:
Fronting:
Selection basis: Best qualified amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $55m+
Experience required:
Subcontracting: Everything allowed but project management
Bid follow-up
Ref: 18575111-002-08
Release: 06.Mar.08
Site visit: 25.Mar.08
1st clarification meeting: 01.Apr.08
11th clarification meeting: 04.Sep.08
Questioning deadline: 17.Feb.09
Closing: 19.Feb.09
Submission & opening: 25.Feb.09
Ruling: 11.Mar.09
Contract: 10.Apr.09
Registered bidders (not comprehensive)
1.Diavaz 2.Siemens 3.Oceanografia 4.Condux (Protexa) 5.Global Offshore 6.Itochu 7.Williams International Company 8.Construcciones Integrales del Carmen
Potential participants
Edison Chovest Offshore, Evya, Greystar, Penspen, Tecno R, Tenaris, Dica, Deep Ocean, Tradeco, Ecomex, Marcos y Asociados, Bureau Veritas
Status AWARDED
DMGP Servicios de Integridad [Grupo Diavaz (51%) - Mexub (47%) - Grey Star (1%) - Penspen Group (1%)]: $1.3billion for 10yrs
Updated 11.Mar.09


PEMEX GAS & BASIC PETROCHEMICAL (PGPB)

MODULAR CRYOGENIC PROJECT [AWARDED]
Project
Description: First of 3 modules that includes:
1.Recovery/ cracking (ISBL)
2.Integration/ auxiliary services/ product handling/ storage (OSBL)
Capacity: 200mcfd
Location: Gas process complex in Poza Rica, Veracruz
Contract
Commissioner: Pemex Gas PGPB (Govt)
Type: Mixed lump sum/unit prices
Term: 720 days starting 18.May.09
Project's budget for 2009: $58million
Down payment: 30% of annual budget
Selection basis: Best qualified amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Comprehensive experience (EPCC) in at least one oil/gas process plant
It should include processes for recovery and cracking of liquids from natural gas
Budget $200million+
Built within the last 5-year period and currently in operation
Combine equity: $11m+
Bid follow-up
Ref: 18572039-011-08
Release: 23.Dec.08
Site visit: 16.Jan.09
1st clarification meeting: 22.Jan.09
2nd clarification meeting: 28.Jan.09
3rd clarification meeting: 04.Feb.09
4th clarification meeting: 18.Feb.09
5th clarification meeting: 25.Feb.09
Questioning deadline: 04.Mar.09
6th clarification meeting: 06.Mar.09
7th clarification meeting: 13.Mar.09
8th clarification meeting & closing: 20.Mar.09
Submission & opening: 26.Mar.09
Ruling: 18.May.09
Registered bidders
1.ICA Fluor Daniel 2.Uhde 3.Cicsa 4.Tubinas Solar 5.Samsung 6.Saimex 7.Spisa 8.Sadeven 9.Exterran Energy 10.Siemens 11.Hegues 12.Techint
Potential co-bidders
Isolux, IEE, Senermex, Gutsa, Dragados, Lockwood Greene, Inelectra, Skanska, Jantesa, Areva T&D, Synercon, Elliot Co, Grupo R, ABB, Thales, Aritas, Automation & Control, Energy Connection, Yokogawa, Vica
Submitted proposal
1.ICA Fluor Daniel - Linde Process Plants
Status AWARDED
ICA Fluor Daniel - Linde Process Plants: $270million
Updated 19.May.09

MODULAR CRYOGENIC PROJECT [AWARDED]
Project
Description:
Modular cryogenic units 5 & 6, LPG/gasoline terminal, auxiliary services and integration to the gas process complex
Location: Burgos gas process complex in Reynosa, Tamaulipas
Scope: Basic & detailed engineering/ permitting/ procurement/ construction/ installation/ tests/ training/ commissioning/ As-built documentation
Contract
Commissioner: Pemex Gas PGPB (Govt)
Type: Mixed lump sum/unit prices
Term: 741 days starting 15.Jan.07
Selection basis: Best qualified amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Comprehensive experience in at least two similar projects
ISO 9001 certified
Combine equity: $50m+
Bid follow-up
Ref: 18572039-001-06
Release: 19.Sep.06
Site visit: 26.Sep.06
8th clarification meeting: 16.Nov.06 (last)
Deadline for registration: 24.Nov.06
Submission & opening: 30.Nov.06
Decision: 22.Dec.06
Finalizing: 12.Jan.07
Registered bidders
1.Gutsa 2.ICA Fluor Daniel 3.Dragados 4.Lockwood Greene 5.Techint 6.Tubinas Solar 7.Inelectra 8.Skanska 9.Jantesa 10.Siemens 11.Areva T&D 12.Synercon 13.Invensys 14.Alcatel
Potential co-bidders
Elliot Co, Grupo R, ABB, Aritas
Status AWARDED
ICA Fluor Daniel: $275million
(Updated 26.Jan.07)


PEMEX GAS & BASIC PETROCHEMICAL (PGPB)

COGENERATION PLANT NUEVO PEMEX [AWARDED]
Contract
Location: Gas processor complex: Nuevo Pemex, Tabasco
Commissioner: Pemex Gas & Basic Petrochemical (Govt)
Scope: Service contract for steam & power delivery out of water & gas supplied by Pemex
Pemex water supply: 800 m tons/hour +2.5%
Pemex gas supply: 110 mcfd (42kg/cm2)
Steam flow delivery: 550-800 m tons/hour
Power capacity (summer conditions): 300 Mw +/-15%
Construction term: 3yrs
Service term: 20yrs
Selection basis: Lowest price bid amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $50m+
Local content: 25%
Bid follow-up
Ref: 18577001-036-08
Release: 28.Aug.08
Site visit: 18-19.Sep.08
1st Clarification meeting: 16.Oct.08
2nd Clarification meeting (questioning): 12.Jan.09
2nd Clarification meeting (responses): 12.Feb.09
3rd Clarification meeting (questioning): 01.Apr.09
3rd Clarification meeting (responses): 20.May.09
4th Clarification meeting (questioning): 26.May.09
4th Clarification meeting (responses): 08.Jun.09
5th Clarification meeting (questioning): 16.Jul.09
5th Clarification meeting (responses): 30.Jul.09
6th Clarification meeting (questioning): 03.Aug.09
6th Clarification meeting (responses): 06.Aug.09
Closing: 06.Aug.09
Proposal submission & opening: 12.Aug.09
Registered bidders
1.ABB 2.Abengoa 3.Abener 4.ARB Arendal 5.Areva T&D 6.CEGELEC 7.Cobra 8.Dalkia 9.Dragados 10.Duke Energy 11.Endesa 12.GE 13.Iberdrola 14.ICA Fluor Daniel 15.Kepler Constructora 16.Marubeni 17.Mitsubishi 18.Mitsui 19.SAPI 20.Saveden 21.Siemens 22.Suez 23.Techint 24.Prolec 25.GE 26.Santander Bank 27.ContourGlobal
Potential participants
Fenosa, Sener, Elecnor, AES North America Development, AES Tamuin SLP, Isolux, Acciona, Idom Ingenieria, Socoin, Banamex, Quintana Capital, Honeywell, Emerson Process, Mexico Constructora Industrial, Tradeco, URS, Temura
Submitted proposals
1.Abengoa-Abener
2.Dragados-ACS-Cobra
Status AWARDED
Ruling: 31.Aug.09
Abengoa-Abener: $0.4225Kw/hr
Updated 01.Sep.09


PEMEX REFINATION (PR)

INTEGRAL PROGRAM FOR LOW-SULPHUR FUELS

CADEREYTA & MADERO UNITS [AWARDED]
Projects
Description: Naphta desulphurization units (2)
Location: Cadereyta & Madero refinery complexes
Scope: Engineering Procurement Construction Integration
Capacitiy
1.Cadereyta:
2.Madero:
Construction term: 1320 days starting 21.Sep.09
Selection basis: Lowest price bid amongst compliant proposals
Local content:
Contracts (2)
Commissioner: Pemex PR (Govt)
Type: Combined lump sum & unit prices
Payment/milestone:
Fronting: 30% annually budget every year
Selection basis: Lowest price bid amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Company/consortium from countries having a free trade agreement with Mexico
Experience required:
1.Successful EPC contracts for hydrocarbon process projects up to $200m+ in the last 5 years
2.It should include at least a catalitic reaction and/or a destilation process currently in operation
Combine equity: $75m+ (1 billion Pesos)
Bid follow-up
Ref: 18572039-001-09
Release: 12.Feb.09
Site visit: 23-24.Feb.09
1st Clarification meeting: 05.Mar.09
2nd Clarification meeting: 20.Mar.09
3rd Clarification meeting: 03.Apr.09
4th Clarification meeting: 17.Apr.09
5th Clarification meeting: 30.Apr.09
6th Clarification meeting: 15.May.09
7th Clarification meeting: 29.May.09
8th Clarification meeting: 12.Jun.09
9th Clarification meeting: 19.Jun.09
10th Clarification meeting: 26.Jun.09
11th Clarification meeting: 30.Jun.09
12th Clarification meeting: 07.Jul.09
Questioning deadline: 12.Jul.09
13th Clarification meeting & closing: 14.Jul.09
Proposal submission & opening: 20.Jul.09
Registered bidders
1.Inelectra North America 2.Technip 3.Saimex 4.Spisa 5.Cicsa 6.Sener 7.Sadeven 8.ICA Fluor Daniel 9.Jantesa 10.ABB 11.Tecnicas Reunidas 12.Hegues 13.Techint 14.Siemens 15.GS Engineering and Construction Corp 16.Prolec GE 17.ARB Arendal
Potential participants
Consutec, K Tronix, Samsung, Uhde, Dragados, Siemens, Isolux, SK Engineering & Construction, Termotecnia, Sojitz, OHL Industrial, Solucion, Emerson, Therom, Invensys, Automatizacion y Control, Peper LT Fuchs, Automation & Control, K Tronix, Reciptech, Rockwell, Vica, Analitica, Thales, Yokogawa, Sulzer Chemtech, Thales, Kentech ME&I, Setemi, Sapi, Idom, Galcor, Ruhrpumpen, GEA, Orben, Dupont
Status AWARDED
Ruling: 21.Aug.09
ICA Fluor Daniel: $638million (contact info by request)
Updated 21.Aug.09

TULA & SALAMANCA UNITS [VOID]
Projects
Description: Naphta desulphurization units (2)
Location: Tula & Salamanca refinery complexes
Scope: Engineering Procurement Construction Integration
Capacitiy
1.Tula:
2.Salamanca:
Construction term: 45 months (1350 days) starting 25.May.09
Selection basis: Lowest price bid amongst compliant proposals
Local content:
Contracts (2)
Commissioner: Pemex PR (Govt)
Type: Combined lump sum & unit prices
Payment/milestone:
Fronting: n/a
Selection basis: Lowest price bid amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $90m+ (1 billion Pesos)
Bid follow-up
Ref: 18572039-006-08
Release: 11.Sep.08
Site visit: 18-19.Sep.08
1st Clarification meeting: 25.Sep.08
16th Clarification meeting: 19.Mar.09
Questioning deadline: 22.Mar.09
17th Clarification meeting and closing: 24.Mar.09
Proposal submission & opening: 30.Mar.09
Ruling: 29.Apr.09
Registered bidders
1.Jantesa 2.Sadeven 3.Samsung 4.ABB 5.ICA Fluor Daniel 6.Hegues 7.Saimex 8.Sener 9.Dragados 10.Siemens 11.Isolux 12.SK Engineering & Construction 13.CICSA 14.Termotecnica 15.Techint 16.Sojitz 17.OHL Industrial 18.Inelectra North America 19.Prolec GE 20.SAPI
Potential participants
Solucion, Emerson, Therom, Invensys, Automatizacion y Control, Peper LT Fuchs, Automation & Control, K Tronix, Reciptech, Rockwell, Vica, Analitica, Thales, Yokogawa, Schrader Camargo
Submitted proposals
1.Samsung Engineering Co
2.Saimexicana - Saipem
3.ICA Fluor Daniel
4.Isolux - Jantesa
5.ACS Servicios Comunicaciones y Energía - Dragados Industrial - ASC Servicios Comunicaciones y Energía México - Senermex Ingeniería y Proyectos - Proyectos y Desarrollo de Infraestructura
Status VOID
Tender declared VOID on 28.May.09
A new RFPs to be announced shortly
Updated 29.May.09

SULPHUR RECOVERY PLANT SRU-2 (3rd round) [AWARDED]
Project
Description: 80 TPD for first line A & preparations for line B
Location: Salamanca refinery complex
Scope: Engineering Procurement Construction Integration
Construction term: 540 days starting 16.Mar.10
Selection basis: Lowest price bid amongst compliant proposals
Local content: 10%
Contracts (2)
Commissioner: Pemex PR (Govt)
Type: Combined lump sum & unit prices
Payment/milestone:
Fronting: 15.25% annually budget for 2010
Selection basis: Lowest price bid amongst compliant proposals
Bidders profile
Company/consortium from any country
Experience required: Design and construction of similar industrial plants
Combine equity: $25+ (330million local currency)
Bid follow-up
Ref: 18576173-044-09
Release: 10.Dec.09
Site visit: 17.Dec.09
1st Clarification meeting: 18.Dec.09
2nd Clarification meeting: 30.Dec.09
3rd Clarification meeting: 13.Jan.10
4th Clarification meeting & questioning deadline: 27.Jan.10
Closing: 29.Jan.10
Proposal submission & opening: 04.Feb.10
Registered bidders
1.Lipsa 2.SAPI 3.Conip 4.Linde 5.Synergy Baruk 6.Inelectra 7.Spisa 8.Jantesa 9.Techint 10.Abengoa 11.Coimsur 12.Isolux
Potential participants
See reference ternders below
Status AWARDED
Ruling: 16.Mar.10
Isolux de Mexico (Isolux Corsan): $47million
Updated 19.Mar.10

SULPHUR RECOVERY PLANT SRU-2 (2nd round) [VOID]
Projects
Description: 160 TPD in two lines
Location: Salamanca refinery complex
Scope: Engineering Procurement Construction Integration
Construction term: 540 days starting 26.Aug.09
Selection basis: Lowest price bid amongst compliant proposals
Local content: 10%
Contracts (2)
Commissioner: Pemex PR (Govt)
Type: Combined lump sum & unit prices
Payment/milestone:
Fronting: 15.25% annually budget every year
Selection basis: Lowest price bid amongst compliant proposals
Bidders profile
Company/consortium from any country
Experience required: Design and construction of similar industrial plants
Combine equity: $25+ (330million local currency)
Bid follow-up
Ref: 18576173-020-09
Release: 23.Apr.09
Site visit: 04.May.09
1st Clarification meeting: 07.May.09
2nd Clarification meeting: 12.May.09
2nd Site visit: 15.May.09
3rd Clarification meeting: 18.May.09
4th Clarification meeting: 25.May.09
5th Clarification meeting: 01.Jun.09
6th Clarification meeting: 06.Jun.09
7th Clarification meeting: 19.Jun.09
8th Clarification meeting: 03.Jul.09
Questioning deadline: 05.Jul.09
Closing: 07.Jul.09
Proposal submission & opening: 13.Jul.09
Registered bidders
1.Conip 2.ICA Fluor Daniel 3.Schrader Camargo 4.Coimsur 5.Inelectra North America 6.Samsung Engineering 7.ARB Arendal 8.Jantesa 9.Linde 10.Abengoa 11.Coopsa 12.Lipsa 13.Techint 14.OHL Industrial 15.Technip 16.Saimex 17.Spisa
Potential participants
Emerson, Man Ferrostaal, K Tronix, Siemens, Shands & Jurds, Areche, Tradeco, SK Engineering and Construction, Atzco, Automation and Control, Tyler, Peperl + Fuchs, Ingersoll Rand, Galcor, Vica, CDI
Status VOID
Tender declared void on 28.Aug.09
A new RFPs should be announced shortly
Updated 04.Sep.09

Ref: SULPHUR RECOVERY PLANT SRU-2 [CANCELED]
Projects
Description: 160 TPD in two lines
Location: Salamanca refinery complex
Scope: Engineering Procurement Construction Integration
Construction term: 589 days starting 06.Jul.09
Selection basis: Lowest price bid amongst compliant proposals
Local content: 10%
Contracts (2)
Commissioner: Pemex PR (Govt)
Type: Combined lump sum & unit prices
Payment/milestone:
Fronting: 15.25% annually budget every year
Selection basis: Lowest price bid amongst compliant proposals
Bidders profile
Company/consortium from any country
Experience required: Design and construction of similar industrial plants
Combine equity: $23+ (330million local currency)
Bid follow-up
Ref: 18576173-013-09
Release: 12.Mar.09
Site visit: 17.Mar.09
1st Clarification meeting: 19.Mar.09
Potential participants (for the record)
1.ICA Fluor Daniel 2.Samsung 3.ARB Arendal 4.Tradeco 5.Abengoa 6.Conip 7.OHL 8.Inelectra Noth America 9.SK Engineering and Construction 10.Techint 11.Inelectra 12.Linde 13.Jantesa
Status CANCELED
Tender declared CANCELED on 17.Mar.09
Normally a new RFPs should be announced later
Updated 20.Mar.09
____________________________________

MINATITLAN REFINERY EXPANSION

6. Alkylation plants (huels & hf) [AWARDED]
Project: Minatitlan refinery expansion (6)
Name: Lazaro Cardenas
Location: Minatitlan Veracruz
Scope: Engineering procurement construction
Subcontracts allowed: Civil works/ instrumentation & control/ electric works/ pipes
Term: 1002 days from 14-Feb-05 to 12-Nov-07
Contract: Mix lump sum/unit prices
Mexican content: 25%
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from any country
Combine equity: US$22m+
Previous contract: A US$35m+ industrial plant
Bid follow-up
Ref: 18572039-016-03
Release: 30-Dec-03
Submission: 15-Nov-04
Registered bidders: 1.SAMSUNG INGENIERIA Y CONSTRUCCIÓN 2.SK ENGINEERING & CONSTRUCTION CO 3.OBRAS PORTUARIAS DE COATZACOALCOS 4.ICA FLUOR DANIEL 5.EMERSON PROCESS MANAGEMENT 6.SIEMENS 7.TECNICAS REUNIDAS 8.SAMSUNG ENGINEERING CO 9.HONEYWELL 10.GUTSA INFRAESTRUCTURA 11.EARTH TECH MEXICO 12.CONSTRUTORA NORBERTO ODEBRECHT 14.FLOWSERVE 15.BOMBAS INTERNACIONALES MEXICANAS 16.SNAMPROGETTI 17.CONSTRUCTORA BAY DE MEXICO 18.INVENSYS SYSTEMS MEXICO 19.PROLEC GE 20.TECHNIP ITALY
Decision: 12-Jan-05
Samsung Engineering Co $154million
(Updated 21-Jan-05)

5. Fuel hydro-desulfuration/ Hydrogen/ Sulfur recovery plants [AWARDED]
Project: Minatitlan refinery expansion (5)
Name: Lazaro Cardenas
Location: Minatitlan Veracruz
Scope: Engineering procurement construction
Subcontracts allowed: Civil works/ instrumentation & control/ electric works/ pipes
Term: 1064 days from 08-Feb-05 to 07-Jan-08
Contract: Mix lump sum/unit prices
Mexican content: 25%
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from any country
Combine equity: US$45m+
Previous contract: A US$70m+ industrial plant
Bid follow-up
Ref: 18572039-015-03
Release: 30-Dec-03
Submission: 08-Nov-04
Registered bidders: 1.SAMSUNG INGENIERIA Y CONSTRUCCIÓN 2.SK ENGINEERING & CONSTRUCTION CO 3.OBRAS PORTUARIAS DE COATZACOALCOS 4.ICA FLUOR DANIEL 5.EMERSON PROCESS MANAGEMENT 6.UDHE DE MÉXICO 7.SIEMENS 8.FERROSTAAL MEXICO 9.LIPSA INDUSTRIAL 10.TECHINT 11.SKANSKA MEXICO 12.TECNICAS REUNIDAS 13.SAMSUNG ENGINEERING 14.DICA 15.KEPLER CONSTRUCTORA 16.HONEYWELL 17.TECHNIP ITALY 18.DRAGADOS PROYECTOS INDUSTRIALES DE MEXICO 19.EARTH TECH MEXICO 20.FLOWSERVE 21.CONSTRUTORA NORBERTO ODEBRECHT 22.BOMBAS INTERNACIONALES MEXICANAS 23.CONDUCTORES MONTERREY 24.SNAMPROGETTI 25.CONSTRUCTORA BAY DE MEXICO 26.PROLEC GE 27.INVENSYS SYSTEMS MEXICO 28.INGERSOLL RAND 29.INDUSTRIAS JOHN CRANE DE MÉXICO 30.LINDE BOC PROCESS PLANTS LLC 31.TVC NACIONAL DE MÉXICO 32.GUTSA INFRAESTRUCTURA 33.SMAR MEXICO
Decision: 05-Jan-05
Tecnicas Reunidas (Spain) - Construtora Norberto Odebrecht (Brazil) - Rio San Juan Construcciones (Grupo R) (Mexico) $317million
(Updated 21-Jan-05)

4. Coking/ Regeneration (DEA)/ Naphtha hydro-desulfuration plants
[AWARDED]
Project: Minatitlan refinery expansion (4)
Name: Lazaro Cardenas
Location: Minatitlan Veracruz
Scope: Engineering procurement construction
Term: 1128 days from 01-Feb-05 to 04-Mar-08
Contract: Mix lump sum/unit prices
Mexican content: 25%
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from any country
Combine equity: US$51m+
Subcontracts allowed: Civil works/ instrumentation & control/ electric works/ pipes
Bid follow-up
Ref: 18572039-012-03
Release: 25-Nov-03
Submission: 05-Nov-04
Registered bidders: 1.SK ENGINEERING AND CONSTRUCTION CO 2.DRAGADOS, PROYECTOS INDUSTRIALES DE MÉXICO 3.WORTHINGTON DE MÉXICO 4.FOSTER WHEELER USA 5.FLOWSERVE 6.EMERSON PROCESS MANAGEMENT 7.SIEMENS 8.GIMSA CONSTRUCCIONES INDUSTRIALES 9.MITSUBISHI HEAVY INDUSTRIES 10.AXIS INDUSTRIAL 11.HONEYWELL 13.ICA FLUOR DANIEL 14.SULZER CHEMTECH 15.NUOVO PIGNONE 16.TECNICAS REUNIDAS 17.INVENSYS SYSTEMS MEXICO 18.PROLEC GE 19.SMAR MEXICO 20.TECHNIP ITALY
Decision: 03-Jan-05
Tecnicas Reunidas (Spain) - Construtora Norberto Odebrecht (Brazil) - Rio San Juan Construcciones (Grupo R) (Mexico) $317million
(Updated 21-Jan-05)

3. Combine/Diesel hydro-desulfuration/FCC plants [AWARDED]
Project: Minatitlan refinery expansion (3)
Name: Lazaro Cardenas
Location: Minatitlan Veracruz
Scope: Engineering procurement construction
Term: 1128 days from 08-Nov-04 to 10-Dec-07
Contract: Mix lump sum/unit prices
Mexican content: 25%
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from any country
Combine equity: US$75m+
Subcontracts allowed: Civil works/ instrumentation & control/ electric works/ pipes
Bid follow-up
Ref: 18572039-011-03
Release: 21-Oct-03
Submission: 13-Aug-04
Registered bidders: 1.SK ENGINEERING & CONSTRUCTION CO 2.ICA FLUOR DANIEL 3.DRAGADOS PROYECTOS INDUSTRIALES DE MEXICO 4.OBRAS PORTUARIAS DE COATZACOALCOS 5.UHDE MÉXICO 6.CONSTRUTORA NORBERTO ODEBRECHT 7.TECHINT 8.GIMSA CONSTRUCCIONES INDUSTRIALES 9.FERROSTAAL MÉXICO 10.SNAMPROGETTI 11.TECHNIP FRANCE 12.EDEMTEC 13.LURGUI MEXICANA 14.INTERNOS Y EQUIPOS DE TRANSFERENCIA 15.GUTSA INFRAESTRUCTURA 16.EMERSON PROCESS MANAGEMENT 17.TOYO ENGINEERING CORPORATION 18.SULZER CHEMTECH 19.SHAW MEXICAN HOLDINGS 20.DURO FELGUERA 21.TECNICAS REUNIDAS 22.AUTOMATIZACIÓN Y MODERNIZACIÓN INDUSTRIAL 23.FLOWSERVE 24.INGENIERÍA Y PROYECTOS DE CONTROL DE MONTERREY 25.SCHNEIDER ELECTRIC MÉXICO 26.KEPLER CONSTRUCTORA 27.WORTHINGTON DE MÉXICO 28.FOSTER WHEELER IBERIA 29.SAMSUNG INGENIERÍA Y CONSTRUCCIÓN 30.FOSTER WHEELER MEXICANA 31.HONEYWELL 32.NOUVO PIGNONE 33.SIEMENS 34.LIPSA INDUSTRIAL 35.GBC INGENIEROS Y CONTRATISTAS 36.CONDUCTORES MONTERREY 37.DICA 38.PROLEC GE 39.INVENSYS SYSTEMS MEXICO 40.THERMON LATINOAMERICANA
Decision: 22-Sep-04
Dragados Proyectos Industriales de Mexico-Dragados Industrial (Spain) $534million
(Updated 24-Sep-04)

2. Auxiliary services & sour water plants and integration works [AWARDED]
Project: Minatitlan refinery expansion (2)
Name: Lazaro Cardenas
Location: Minatitlan Veracruz
Scope: Engineering procurement construction
Term: 1290 days from 27-Sep-04 to 08-Apr-08
Contract: Mix lump sum/unit prices
Mexican content: 25%
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from any country
Combine equity: US$69.5m+
Subcontracts allowed: CFE link substation/ distribuited control system/ deep foundations/ telecommunication systems/ cooling towers/ railroads/ 3-D electronic simulation/ turbogenerator/ engineering
Bid follow-up
Ref: 18572039-007-03
Release: 18-Sep-03
Submission: 28-Jul-04
Registered bidders: 1.ICA FLUOR DANIEL 2.DURO FELGUERA 3.SIEMENS 4.TECHINT 5.SK ENGINEERING & CONSTRUCTION CO 6.ABENGOA MÉXICO 7.ALSTOM T&D 8.CONSTRUCTORA EVEREST 9.HONEYWELL 10.CONSTRUCTORA BAY DE MÉXICO 11.CERREY 12.CONSTRUCCIONES Y TRITURACIONES 13.CONDUCTORES MONTERREY 14.SULZER PUMPS MÉXICO 15.EMERSON PROCESS MANAGEMENT 16.ABB MÉXICO 17.EARTH TECH MÉXICO 18.SKANSKA MÉXICO 19.CHINA HUANQIU CONTRACTING & ENGINEERING CORPORATION 20.GUTSA INMOBILIARIA 21.GIMSA CONSTRUCCIONES INDUSTRIALES 22.ELECNOR 23.VATECH TRANSMISIÓN Y DISTRIBUCIÓN 24.OBRAS PORTUARIAS DE COATZACOALCOS 25.UDRA INDUSTRIAL 26.SADEVEN INDUSTRIAS 27.SHAW MEXICAN HOLDINGS 28.PROLEC GE 29.AUTOMATIZACIÓN Y MODERNIZACIÓN INDUSTRIAL 30.TECHNIP ITALY 31.INVENSYS SYSTEMS MÉXICO 32.INGENIERÍA Y PROYECTOS DE CONTROL DE MONTERREY 33.SINERGIA SOLUCIONES INTEGRALES PARA LA CONSTRUCCIÓN 34.MITSUBISHI CORPORATION 35.EDEMTEC 36.FLOWSERVE 37.TELVENT MÉXICO 38.COMPANÍA CONTRATISTA NACIONAL 39.KEPLER CONSTRUCTORA 40.NOUVO PIGNONE 41.EQUIPOMEX 42.KELLER CIMENTACIONES DE LATINOAMÉRICA 43.SMAR MÉXICO 44.THERMON LATINOAMERICANA 45.BOMBAS CONSTRUCCIONES Y EQUIPOS DEL CENTRO 46.INGERSOLL RAND 47.SIMPSA INGENIERIA 48.3M MEXICO
Decision: 14-Sep-04
ICA Fluor Daniel $684million
(Updated 17-Sep-04)

1. Access road & site civil works
Project: Minatitlan refinery expansion (1)
Name: Lazaro Cardenas
Location: Minatitlan Veracruz
Scope: Engineering procurement construction
Term: 600 days from 08-Dec-03 to 29-Jul-05
Contract: Unit prices
Selection basis: Least offer among technically approved proposals
Bidders profile:
Company/consortium
Combine equity: US$15m+
Subcontracts allowed: Pile driving and dredging
Bid follow-up
Ref: 18572039-003-03
Release: 29-May-03
Submission: 03-Sep-03
Offers disclosure: 03-Oct-03
Decision: 22-Oct-03
WINNER: Tradeco Infraestructura $34million
(Updated 01-Nov-03)


PEMEX PETROCHEMICAL (PP)
ETHYLENE PLANT EXPANSION

ETHYLENE PLANT EXPANSION (2nd phase) (2nd round) [VOID]
Project
Description:
Scope: EPC
Petrochemical complex: Morelos
Location: Coatz, Veracruz
Contract
Commissioner: Pemex Petrochemical (Govt)
Type: Combined lump sum & unit prices
Term: 1016 days starting 07.Jul.08
Payment/milestone:
Fronting: 30% of yearly budget
Selection basis: Best qualified amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $70m+
Experience required: Successful EPC contracts for hydrocarbon process projects up to $70m+ in the last 5 years
Bid follow-up
Ref: 18572039-003-08
Release: 18.Mar.08
Site visit: 26.Mar.08
1st clarification meeting: 28.Mar.08
8th clarification meeting: 16.May.08
Closing: 17.May.08
Submission & opening: 23.May.08
Ruling: 06.Jun.08 (next)
Finalizing: 23.Jun.08
Registered bidders (not comprehensive)
1.Swecomex 2.ICA Fluor Daniel 3.Proyectos y Desarrollos de Infraestructura 4.Saimexicana
Potential participants
Techint, Dragados, CIMISA, Gutsa, Abengoa, Tradeco, Siemens, Conip, Jantesa, Senermex, Skanska, Koch-Glitsch, Sener, ARB Arendal, Chemisa, Areva, Elliot, Vica, Flowserve, Silzer Chemtech
Status VOID
Tender declared VOID (2nd round) on 28.May.08
A new RFPs to be announced shortly
Updated 06.Jun.08

ETHYLENE PLANT EXPANSION (2nd phase) [TERM EXPANDED & EXPERIENCE MODIFIED] [VOID]
Project
Description: (to be posted)
Scope: EPC
Petrochemical complex: Morelos
Location: Coatz, Veracruz
Contract
Commissioner: Pemex Petrochemical (Govt)
Type: Combined lump sum & unit prices
Term: 1016 days
Payment/milestone:
Fronting: 30% of yearly budget
Selection basis: Best qualified amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $70m+
Experience required: Successful EPC contracts for hydrocarbon process projects up to $70m+ in the last 5 years
Bid follow-up
Ref: 18572039-004-06
Release: 07.Dec.06
Site visit: 14.Dec.06
1st clarification meeting: 10.Jan.07
14th clarification meeting: 14.Dec.07
Deadline for questioning: 04.Jan.08
Closing: 08.Jan.08
Submission & opening: 14.Jan.08
Registered bidders (not comprehensive)
1.Techint 2.Swecomex 3.Dragados 4.CIMISA 5.Gutsa 6.Abengoa 7.Tradeco 8.ICA Fluor Daniel 9.Siemens 10.Conip 11.Jantesa 12.Senermex
Potential participants
Skanska, Koch-Glitsch, Sener, ARB Arendal, Chemisa, Areva, Elliot, Vica, Flowserve
Status VOID
Tender declared VOID on 14.Jan.08
A new RFPs to be announced shortly
Updated 07.Feb.08

ETHYLENE PLANT EXPANSION (1st phase) [TERM EXPANDED & EXPERIENCE MODIFIED] [AWARDED]
Project
Description: (to be posted)
Scope: EPC
Petrochemical complex: Morelos
Location: Coatz, Veracruz
Contract
Commissioner: Pemex Petrochemical (Govt)
Type: Unit prices
Term: 485 days
Payment/milestone:
Fronting: 30% of yearly budget
Selection basis: Best qualified amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $11m+
Experience required: Successful EPC contracts for hydrocarbon process projects up to $50m+ (including one of 30m+) in the last 5 years
Bid follow-up
Ref: 18572039-003-06
Release: 05.Dec.06
Site visit: 14.Dec.06
1st clarification meeting: 03.Jan.07
14th clarification meeting: 28.Jun.07
Closing: 29.Jun.07
Submission & opening: 05.Jul.07
Registered bidders
1.ICA Fluor Daniel 2.Techint 3.Conip 4.Dragados 5.Swecomex 6.Jantesa 7.Tradeco 8.CIMISA 9.Abengoa 10.OPC 11.ARB Arendal 12.Gutsa 14.Lipsa Industrial 15.Sener 16.Industrias Derivadas de Etileno 17.Isolux 18.Skanska 19.Kentech ME&I
Potential participants
CHEMISA, COMIMSA, ABB, Sulzer Chemtech, Obras Portuarias de Coatz, Schneider Electric, Siemens, Flowserve, Invensys, Atica, Vica, Duro Felguera
Status AWARDED
Decision: 31.Aug.07
Swecomex: $45million
Updated 07.Sep.07


FEDERAL COMMISSION OF ELECTRICITY (CFE)

POWER PLANT HISTORY

Geothermo Los Humeros II phase B [AWARDED]
Project
Commissioner: CFE (Govt)
Location: Puebla
Capacity: 25 Mw
Scope: EPC
Construction program:
Term: 886 days
Contract: Lump sum
Front payment: n/a
Local content: 16% Min
Subcontracting: n/a
Selection basis
Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $12m+ (local currency 154million+)
Bid follow-up
Ref: 18164093-031-09
Release: 03.Sep.09
Site visit: 10.Sep.09
1st Clarification meeting: 06.Oct.09
2nd Clarification meeting: 23.Oct.09
Closing: 11.Nov.09
Proposal submission & opening: 17.Nov.09
Registered bidders
1.Elecnor 2.GE 3.Camher 4.Alstom 5.Aldesem 6.Sumitomo
Potential bidders
Status AWARDED
Ruling: 04.Dec.09
Alstom Mexicana: $3.7million
Updated 12.Dec.09

Geothermo Cerro Prieto V [VOID]
Project
Commissioner: CFE (Govt)
Location: Baja California
Capacity: 100 Mw (2x50)
Scope: EPC
Construction program:
Term: 934 days
Contract: Lump sum
Local content: 16% Min
Selection basis
Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $45m+ (local currency 585million+)
Bid follow-up
Ref: 18164093-009-09
Release: 16.Apr.09
Site visit: 28.Apr.09
1st Clarification meeting: 26.May.09
2nd Clarification meeting: 23.Jun.09
3rd Clarification meeting: 21.Aug.09
4th Clarification meeting: 11.Sep.09
5th Clarification meeting: 02.Oct.09
6th Clarification meeting: 21.Oct.09
7th Clarification meeting: 26.Oct.09
Closing: 26.Nov.09
Proposal submission & opening: 02.Dec.09
Registered bidders
1.Itochu 2.Isolux 3.Iberdrola 4.Alston 5.ICA Fluor Daniel 6.Prolec GE 7.Sumitomo 8.Elecnor 9.Acciona
Potential bidders
Toshiba, Cegelec, Sadeven, Mitsubishi, Tritanium, Jantesa, Consorcio K, Equipos Indutriales de BC, Tritanium
Status VOID
Ruling: 19.Jan.10
A new RFPs to be announced shortly
Updated 23.Jan.10

WIND OAXACA I [AWARDED]
Project
Capacity: 101.4 Mw
Location: La Ventosa Oaxaca
Term: 473 days from 14.Aug.09 to 30.Nov.10
Contract
IPP 20yrs
Selection basis: Lowest price bid amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $50m+
Local content: 25%
Bid follow-up
Ref: 18164093-031-08
Release: 02.Sep.08
Site visit: 09.Sep.08
1st Clarification meeting: 02.Oct.08
2nd Clarification meeting: 21.Nov.08
3rd Clarification meeting: 12.Feb.09
4th Clarification meeting: 11.Mar.09
5th Clarification meeting: 23.Mar.09
6th Clarification meeting: 26.Mar.09 (last)
Closing: 16.Feb.09
Technical & economic proposal submission: 06.Apr.09
Technical proposal opening: 06.Apr.09
Economic proposal opening: 29.Apr.09 (next)
Ruling: 11.May.09
Registered bidders
1.Iberdrola 2.Desarrollos Eolicos Mexicanos 3.ENHOL 4.Abengoa 5.Fenosa 6.Enerfin 7.Capital Energy 8.Prolec GE International 9.Suez Energia 10.Energia y Recursos Ambientales (EYRA) 11.Acciona 12.Leasing Operations
Potential participants
Enel, Mitsubishi, Gamesa Eolica, Endesa, EDF, Mitsui, Elecnor, Aldesa, Promotora Ambiental, Competitive Power Ventures
Submitted proposals
1.Acciona Energia de Mexico
2.Energia y Recursos Ambientales (EYRA)- Energias Ambientales de Guadalajara
3.Enerfin - Elecnor
Status AWARDED
Energia y Recursos Ambientales (EYRA)- Energias Ambientales de Guadalajara: $0.0660 USD/kWh
Updated 15.May.09

Previous tender ref: WIND LA VENTA III [VOID]
Project
Capacity: 101.4 Mw
Location: Oaxaca
Term: 456 days starting 31.Jan.08
Contract
IPP 20yrs
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $45m+
Local content: 17%
Subcontracts allowed:
Bid follow-up
Ref: 18164093-002-07
Release: 27.Feb.07
Site visit: 06.Mar.07
1st Clarification meeting: 30.Mar.07
2nd Clarification meeting: 14.May.07
3rd Clarification meeting: 13.Jun.07
4th Clarification meeting: 18.Jul.07
Closing: 11.Sep.07
Submission: 17.Sep.07
Offer disclosure: 09.Oct.07
Registered bidders
1.Iberdrola 2.Enel 3.Mitsubishi 4.GE 5.Fenosa
Potential participants
Gamesa Eolica, Endesa, EDF, Prolec GE, Mitsui, Elecnor, Aldesa, Enerfin, Promotora Ambiental, Abengoa, Competitive Power Ventures
Status VOID
Tender declared VOID on 24.Oct.07
A new RFPs to be announced shortly
Updated 12.Dec.07

PREVIOUS TENDER REFERENCE
La Venta II/ 83.3 Mw (98 units)/ 31.Aug.05/ Iberdrola - Gamesa Eolica/ $111.4million

HYDROELECTRIC LA YESCA (2nd round) [AWARDED]
Project
Capacity: 2x375 MW
Location: Jalisco-Nayarit
Term: 1720 days starting 17.Sep.07
Scope: Construction & financing (100%)
Contract: Mixed lump sum/unit prices
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $275m+
Local content: 5%
Subcontracts allowed:
Bid follow-up
Ref: 18164093-001-07
Release: 27.Feb.07
Site visit: 06.Mar.07
1st Clarification meeting: 29.Mar.07
7th Clarification meeting: 31.Jul.07
Closing: 01.Aug.07
Submission & opening: 07.Aug.07
Registered bidders
1.ICA 2.CARSO-IDEAL 3.Techint 4.Gutsa 5.Grupo Mexico 6.Impregilo 7.Voith Siemens 8.Prolec GE 9.La Peninsular 10.Construcciones y Trituraciones 11.Alstom 12.Va Tech Escher Wyss 13.Power Machines
Potential participants
GPPP, Cemex, ISA Ingenieria, PCM Concreto, Andrade Gutierrez
Actual proposals
1.ICA-Adisa-La Peninsular: $768million
2.CARSO-IDEAL: $808million
3.Impregilo-Techint: $856million
Ruling: 06.Sep.07
ICA-Adisa-La Peninsular: $768million
Status AWARDED
Updated 07.Sep.07
------------------------
1st-round RECORD
Registered bidders: 1.Mitsubishi 2.ISA 3.Gutsa 4.Power Machines de Mexico 5.Condux (Protexa) 6.ICA 7.GE 8.IDEAL 9.Techint 10.Sinohydro 11.Alstom 12.Mexico Constructora Industrial 13.Construcciones y Trituraciones 14.Obracon Huarte Lain 15.La Peninsular 16.Andrade Gutierrez 17.Tradeco 18.Va Tech Escher Wyss 19.Odebrecht 20.Carso Infraestructura
Proposals:
1.Sinohydro-Gutsa: 1053+197=$1250million
2.ICA-Adisa-CPH-Peninsular: 764+145=$909million
3.Impregilo-Techint: 678+127=$805million
Ruling:
Offers 1 & 2 higher than approved budget: $837million
Offer 3 did not comply with technical requirements
Tender declared VOID on 01.Nov.06

CC-SOLAR POWER PLANT AGUA PRIETA II [VOID]
Project
Description: Combined cycle plant formed by 2/3 gas turbogenerators with steam generators and auxiliary systems, one steam turbogenerator with auxiliary systems, one air condensator and complementary equipment. Also a solar camp to generate steam for the combined cycle. And the interconnection with a 230 kV substation.
Gas capacity: 535.64 MW +/- 15% (summer conditions)
Solar capacity: 24 MW
Scope: Design/ engineering/ procurement/ construction/ installation/ tests/ training/ commissioning
Location: Sonora
Contract
Commissioner: CFE (Govt)
Type: Lump sum
Term: 859 days starting 26.Sep.07
Financing: 100% gas capacity by contractor
Donation: $49.35million for 100% solar capacity by GEF-World Bank
Payment/milestone: Bid offer/ Provisional acceptance by CFE: 01.Feb.10
Selection basis: Best qualified amongst compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $100m+
Local content: 16%
Subcontracts allowed: Design/ engineering/ construction/ commissioning
Bid follow-up
Ref: 18164093-022-06
Release: 29.Aug.06
Site visit: 06.Sep.06
1st clarification meeting: 04.Oct.06
12th clarification meeting: 05.Jul.07
13th clarification meeting: 19.Jul.07
14th clarification meeting: 31.Jul.07 (last)
Closing: 02.Aug.07
Submission & opening: 08.Aug.07
Registered bidders
1.Iberdrola 2.Abener 3.Isolux 4.Dragados 5.Mitsubushi 6.Sener 7.Man Ferrostaal 8.Siemens 9.Socoin 10.Cobra 11.GE 12.El Paso 13.Techint 14.Itochu 15.ICA Fluor Daniel
Status
Tender declared VOID on 08.Aug.06
A new RFPs to be announced shortly
Updated 10.Aug.07

NUCLEAR POWER PLANT LAGUNA VERDE (1st Fase) [AWARDED]
Project
Description: Renewal of units 1 & 2 (2x810 MW)
Scope: Design/ engineering/ procurement/ dismantlement/ construction/ installation/ tests/ training/ commissioning
Location: Veracruz
Term: 1392 days starting 01.Mar.07
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: $130m+
Local content: 10%
Subcontracting: Allowed
Contract
Type: Lump sum
Financing: 100% by contractor
Payments/milestones:
Unit 1: Provisional acceptance by CFE scheduled for 05.Jul.10
Unit 1: Full acceptance by CFE
Unit 2: Provisional acceptance by CFE scheduled for 20.Dec.10
Unit 2: Full acceptance by CFE
Selection basis: Lowest price bid from compliant proposals
Bid follow-up
Ref: 18164093-013-06
Release: 25.May.06
Deadline for 6th-questioning: 17.Nov.06
6th clarification meeting: 30.Nov.06 (last)
Closing: 13.Jan.07
Submission & opening: 19.Jan.07
Decision: 12.Feb.07
Finalizing: 28.Feb.07
Registered bidders
1.Siemens 2.Sener (es) 3.ICA Fluor Daniel 4.Techint 5.Alstom 6.GE 7.Iberdrola 8.Elecnor 9.Mitsubishi
Proposals
1.GE-Diamante: $951.5million
2.Siemens-Techint-Sener: $695million
3.Iberdrola-Alstom: $605million
Decision: 12.Feb.07
Finalizing: 28.Feb.07 (next)
Status AWARDED
Iberdrola Ingenieria y Consultoria Mexico - Iberdrola Ingenieria y Construccion - Alstom Mexicana: $605million
Updated 12.Feb.07

CC POWER PLANT NORTE [AWARDED]
Project
Commissioner: CFE (Govt)
Location: Durango
Capacity: 333-450 Mw
Scope: Engineering Construction Operation
Financing & Owning
Construction program:
739 days starting 24.May.07
Contract: External Power Producer
Term: 25 years
Local content: 25% Min
Selection basis
Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having
a free trade agreement with Mexico
Combine equity:
US$92m+ (local currency 1b+)
Bid follow-up
Ref: 18164093-015-05
Release: 15.Nov.05
Register deadline: 17.Oct.06
Submission: 23.Oct.06
Offers opening: 19.Jan.07
Decision: 05.Mar.07
Registered bidders
1.Hitachi 2.GE 3.Techint 4.Chubu 5.Siemens 6.Transalta 7.Electricite de France 8.Constructora Andrade Gutierrez 9.Itochu 10.Petrobras 11.Mitsubishi 12.Fenosa 13.Valladolid International Investments 14.Energia Azteca (Intergen) 15.Iberdrola 16.Mitsui 17.Prolec GE 18.ICA Fluor Daniel 19.Energia Termodurango 20.ABB
Status AWARDED
Union Fenosa Internacional: 0.6294 Pesos/kWh (DOF 15.May.07)
(Updated 09.Mar.07)

HYDROELECTRIC LA YESCA (1st round) [VOID]
Project
Capacity: 2x375 MW
Location: Jalisco-Nayarit
Term: 1691 days
Project start/finish: 13.Nov.06/30.Jun.11
Scope: Construction & financing (100%)
Contract: Mixed lump sum/unit prices
Bid follow-up
Ref: 18164093-011-06
Release: 18.May.06
12th Clarification meeting: 06.Oct.06 (last)
Submission & opening: 13.Oct.06
Registered bidders
1.Mitsubishi 2.ISA 3.Gutsa 4.Power Machines de Mexico 5.Condux (Protexa) 6.ICA 7.GE 8.IDEAL 9.Techint 10.Sinohydro 11.Alstom 12.Mexico Constructora Industrial 13.Construcciones y Trituraciones 14.Obracon Huarte Lain 15.La Peninsular 16.Andrade Gutierrez 17.Tradeco 18.Va Tech Escher Wyss 19.Odebrecht 20.Carso Infraestructura
Proposals
1.Sinohydro-Gutsa: 1053+197=$1250million
2.ICA-Adisa-CPH-Peninsular: 764+145=$909million
3.Impregilo-Techint: 678+127=$805million
Ruling
Offers 1 & 2 higher than approved budget: $837million
Offer 3 did not comply with technical requirements
Status
Tender declared VOID on 01.Nov.06
A new RFPs to be announced shortly
(Updated 02.Nov.06)

CC POWER PLANT BAJA CALIFORNIA (2nd round) [AWARDED]
Project
Capacity: 252.3 MW +/-15%
Scope: Engineering Procurement Construction & Financing
Construction program: 858 days starting 25.Oct.06
Location: Tijuana BC
Contract
Turn key-Lump sum
Commissioner: CFE (Govt)
Local content: +18%
Selection basis: Lowest price bid from compliant proposals
Bidders profile
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: US$55m+
Bid follow-up
Ref: 18164093-017-06
Release: 18.Jul.06
Submission & opening: 29.Aug.06
Decision: 27.Sep.06
Bidders
1.Isolux 2.Abener 3.Dragados 4.Itochu 5.GE 6.Siemens 7.Techint 8.Socoin
Winner
Isolux-Techint: $174million
(Updated 13.Oct.06)

COAL POWER PLANT PACIFICO [AWARDED]
Location: Lazaro Cardenas (Mexico West coast)
Capacity: 648 MW
Scope: Engineering Construction & Financing
Construction program: 1342 days from 31.May.06 to 01.Feb.10
Contract: Turn key-Lump sum
Local content: 15% Min
Selection basis: Lowest price bid from compliant proposals
Bidders profile:
Company/consortium from countries having a free trade agreement with Mexico
Combine equity: US$95m+
Bid follow-up:
Ref: 18164093-003-03
Release: 22.Jul.03
Registered bidders (not comprehensive): 1.Techint 2.ICA Fluor Daniel 3.Alstom Power Mexico 4.Skanska Mexico 5.Mitsubishi Corporation 6.Mitsui & Co 7.Dragados Proyectos Industriales de Mexico 8.Hitachi 9.Soluziona Tecnologias de Informacion 10.Siemens 11.Itochu Corporation 12.Credit Agricole Indosuez 13.Skoda Export 14.GE International 15.ABB Utilities 16.Construtora Andrade Gutierrez 16.ABB Mexico
Decision: 06.Dec.05
Mitsubishi Corporation - Carboelectrica Diamante: $611million
(Updated 06.Dec.05)

2. CC Power plant Mexicali II
Ref: 18164093-002-02/ Cancelled
3. CC Power plant Tamazunchale
18164093-001-03/ 30.Jun.04/ Iberdrola Mexico/ IPP/ 25yrs/ 839-1135 MW
5. CC Power plant Tuxpan V
18164093-013-02/ 17.Dec.03/ Mitsubishi Corporation-Kyushu Electric Power Co/ IPP/ 25yrs/ 431-527 MW
7. CC Power plant Valladolid III
18164093-032-02/ 14.Oct.03/ Mitsui & Co Ltd/ IPP/ 25yrs/ 430-525 MW
8. CC Power plant Altamira V
18164093-001-02/ 22.Oct.03/ Iberdrola Mexico/ IPP/ 25yrs/ 975 MW
9. Hydroelectric El Cajon
18164093-011-02/ 14.Mar.03/ Constructora Internacional de Infraestructura: ICA-Promotora e Inversora Adisa-La Peninsular Compania Constructora-EnergomachExport Power Machine/ $749.5million/ $0.0685/Kw-h/ 2x375 MW


FEDERAL COMMISSION OF ELECTRICITY (CFE)

ENERGY SOURCES HISTORY

LNG TRANSPORT [AWARDED]
Project
30" Pipeline 304km long
Contract
Volume: up tp 500 mcfd
Service location:
1. Manzanillo LNG terminal - Manzanillo thermo power plant
2. Manzanillo LNG terminal - Guadalajara thermo power plant
3. Manzanillo LNG terminal - Guadalajara Pemex LNG network
Term: 25yrs starting on March 2011
Selection basis: Lowest price bid from compliant proposals
Bidders profile
Company/consortium from any country
Combine equity:
Bid follow-up
Ref: 18164067-061-08
Release: 14.Oct.08
Site visit: 23-24.Oct.08
1st Clarification meeting: 11.Nov.08
10th Clarification meeting: 07.Apr.09
Closing: 08.Apr.09
Proposal submission & opening: 14.Apr.09
Registered bidders (not comprehensive):
1.Mitsubishi 2.Promotora del Desarrollo de America Latina (Ideal) 3.El Paso 4.ICA Fluor Daniel 5.ARB Arendal 6.Carso Infraestructura y Construccion 7.Bredero Shaw 8.Compania Mexicana de Gerencia y Operacion 9.EMS Energy Services Mexico 10.Mitsui 11.Techint 12.Energia Occidente de Mexico (Transcanada) 13.Fermaca Pipeline del Pacifico 14.Plantas y Lineas Industriales 15.Transportadora de Gas Natural La Huasteca 16.Isolux 17.Condux (Protexa) 18.Sempra Energy 19.GDF Suez 20.Temura 21.Cobra 22.Elecnor 23.Marubeni 24.Tubacero
Potential participants
Tejas Gas de Toluca, Promigas, Thales, Dennis, Tecgas, Itochu, Walworth, MI Servicios, MI Consultores, Plantas y Lineas Industriales, Tubesa, SK Engineering and Construction
Submitted proposal
1.Energia Occidente de Mexico (Transcanada)
2.Fermaca Pipeline del Pacifico
3.EMS Energy Services de Mexico
Status AWARDED
Ruling: 06.May.09
Energia Occidente de Mexico (Transcanada): $294million (PV)
Updated 08.May.09

LNG SUPPLY [AWARDED]
Contract
Volume: Up to 500 MCFD
Term: 15yrs
Delivery schedule:
2011: 90 MCFD
2012: 180 MCFD
2013: 360 MCFD
2014: 400 MCFD
2015-2025: 500 MCFD
Location: Manzanillo, Colima (Pacific coast)
Payments: 30 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile
Company/consortium from any country
Combine equity: $150million
Bid follow-up
Ref: 18164067-009-06
Release: 06.Jun.06
Closing: 30.Aug.07
Submission & opening: 04.Sep.07
Registered bidders (not comprehensive):
1.Techint 2.Transportacion Maritima Mexicana (TMM) 3.Fenosa 4.Marubeni 5.Sener 6.Sumitomo 7.El Paso 8.Mitsui 9.Repsol 10.Mitsubishi 11.Shell 12.IPD 13.Transcanada 14.Sempra 15.Transportaciones Maritimas Petroleras 16.La Huasteca 17.Tokio Gas
Potential participants
Chevron-Texaco, Gastream, Zeta Gas, Itochu, Anumen, Petrobras, Intergen, Protexa, Grupo R, Societe Generale, Skanska
Actual proposals
1.Repsol: $0.03 below maximum set by CFE (0.91% Henry Hubb index)
Ruling: 18.Sep.07
Status AWARDED
Repsol Comercializadora de Gas: 0.91% Henry Hubb-0.03USD/MMBtu
Updated 28.Sep.07

LNG TERMINAL [AWARDED]
Contract
Scope: Reception/ storage/ regasification/ delivery
Volume: 500 mcfd (543 353.84 GJules/day)
Location: Manzanillo, Colima (Pacific coast)
Term: 20 yrs starting 01.Jul.11
Payments: 30 days after invoicing procedures
Selection basis: Lowest price bid from compliant proposals
Bidders profile
Company/consortium from any country
Combine equity: $100million
Bid follow-up
Ref: 18164067-010-06
Release: 06.Jun.06
Site visit: 23.Jun.06
1st Clarification meeting: 30.Oct.06
2nd Clarification meeting: 14.Nov.06
3rd Clarification meeting & Issue of Bid Documentation Rev-1: 14.Dec.06
Bidders attendance: Iberdrola Energia, ICA Fluor Daniel, Union Fenosa Gas, Construcciones Protexa, Mitsubishi Corp, Sempra Energy, Tokio Gas Co, Mitsui & Co, Korea Gas Corp, Samsung Corp, Gastream Mexico, Itochu Corp, El Paso Energia Mexico, Techint, Marubeni Mexico, TransCanada (Transportadora de Gas Natural la Huasteca), Servicios Maritimos de Campeche, Sumitomo Corp
Deadline for 4th-questioning: 05.Jan.07
4th Clarification meeting: 02.Feb.07
5th Clarification meeting: 22.Feb.07
6th Clarification meeting: 20.Mar.07
7th Clarification meeting: 07.Aug.07
8th Clarification meeting: 06.Sep.07
9th Clarification meeting: 20.Sep.07
10th Clarification meeting: 16.Oct.07
13th Clarification meeting: 31.Jan.08
14th Clarification meeting: 08.Feb.08
Closing: 19.Feb.08
Submission & opening: 25.Feb.08
Registered bidders (not comprehensive)
1.Transcanada 2.Swecomex 3.Shell 4.Marubeni 5.Sumitomo 6.Jantesa (ve) 7.Sener (es) 8.Samsung 9.Petrobras 10.Intergen 11.Protexa 12.El Paso 13.Societe Generale 14.Mitsui 15.Tokio Gas 16.Skanska 17.ABB 18.Great Lakes Dredge & Dock Company 19.Korea Gas Corp 20.ICA Fluor Daniel 21.Dragamex 22.Iberdrola 23.Zeta Gas 24.Mitsubishi 25.Dames & Moore 26.ITP Interpipe 27.Gastream 28.Itochu 29.Obrascon Huarte Lain 30.Fenosa 31.Sempra 32.Techint 33.IHI 34.TMM 35.Mexicana de Dragados
36.Servicios Maritimos de Campeche 37.SBM Offshore Group 38.Van Oord 39.La Huasteca 40.Cobra 41.Man Ferrostaal
Potential participants
IHI Corp, Flowserve
Status AWARDED
Proposals:
1.Terminal KMS de GNL (Mitsui - KOGAS - Samsung): $0.4044/million BTUs
2.Controladora LNG Manzanillo (Iberdrola - Tokio Gas - IHI - ICA): $0.5117/million BTUs
3.Energia Occidente de Mexico (Transcanada - Techint - Tractebel): $0.6484/million BTUs
Ruling: 07.Mar.08
Terminal KMS de GNL (Mitsui - KOGAS - Samsung): $0.4044/million BTUs = $480million
Updated 01.Apr.08

PREVIOUS TENDER REFERENCE
18164067-025-02/ 11.Sep.03/ Gas del Litoral (Terminal de LNG de Altamira) (Shell)/ Henry Hub+0.7142USD/GCal/ 15yrs

__________________________________________________________________


ARAMONI Expert Services: TENDER OUTSOURCING

Expert assistance to reduce tendering costs secure compliance and improve bid results

Based on a typical tender procedure we provide the following services:

LOCAL SUPPORT
1. OPPORTUNITY ALERT
• Secure RFPs monitoring
• Project scope overview for entering decision (report)
2. TENDER REGISTER
• Tender register procedure
• Collection & sending of bid documents
3. BIDDERS MEETINGS
• Attendance on behalf/accompanying
• Meeting review (report)
• PEMEX’s responses assessment (report)
• Notes on contenders' concerns (report)

EXPERT ASSISTANCE
4. TENDER/CONTRACT UNDERSTANDING
• Clarifications online
• Enquiries for PEMEX subsequent confirmations
5. PROJECT INSIGHT
• Project scope discussion
• Questions writing for PEMEX to clarify
6. COMPLIANCE
• Technical proposal review: format/ completeness/ consistency

In sum:
• Our expertise covers the tender’s features foreign companies are not familiar with.
• We offer the advantage of local presence and extensive experience as a complement to our client’s own capabilities.
• We oversee, but do not participate in, clients’ sensitive issues such price bid offer.

Additionally we act as representatives as follows:
• BUSINESS/PROJECT DEVELOPMENT
• CONTRACT PURSUIT
• SPECIAL ASSIGNMENTS

We hope some of these services be of interest and look forward to further dialogue.

Contact: info@aramoni.com
__________________________________________________________________


ARAMONI Expert Services: PROMPT MARKETING

Expert assistance designed for equipment producers to enter Mexico’s energy market

This service concept is based on our standing as a reliable supplier to the energy contractors market. We maintain professional relationships with most of the companies participating in PEMEX major tenders/projects. And we have got open channels to market the products of the companies we represent. FYI we have started market actions towards the Tula refinery project.

SERVICE SCOPE
Marketing material & paperwork
Setting up business relationships with potential/actual Pemex contractors
RFQ securement
Submission of offers/quotes
Support for sales & deliveries

TRIAL PERIOD: 9 month

PRICE COMPONENTS
1. Planning & start-up
2. Retaining fee
3. Expenses: travel, bid docs, translation, etc
4. Sale commission: based on industry standards

In sum:
• Aramoni’s background and expertise position client’s products straight away in the spotlight of the Mexico’s energy market.
• We offer the advantage of local presence, market knowledge and business understanding.
• We select our clients based on a complementary portfolio and no (at all) conflict of interests.

We hope this service be of interest and look forward to hearing from you.