| PROJECT
TRACKER (2
of 2)
IN CONSTRUCTION PEMEX EXPLORATION & PRODUCTION (PEP)
OFFSHORE PLATFORM HISTORY 45. Kab-A [AWARDED] Project Light structure platform Scope: Engineering/ procurement/ construction/ loading/ fixing Location: Campeche basin GOM Term: 210 days starting 30.Aug.07 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $3m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-022-07 Release: 31.May.07 Site visit: n/a 1st clarification meeting: 14.Jun.07 4th clarification meeting: 16.Jul.07 (last) Closing: 18.Jul.07 Submission & opening: 24.Jul.07 Decision: 08.Aug.07 Registered bidders 1.Industria del Hierro (ICA Fluor Daniel) 2.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 3.Swecomex 4.J Ray McDermott 5.Dragados 6.Grupo Constructor Global 7.Construcciones y Equipos Latinoamericanos (Protexa) 8.CIT Status AWARDED Decision: 28.Aug.07 Industria del Hierro (ICA Fluor Daniel): $9.5million Updated 07.Sep-07 44. Atun-D [AWARDED] Project Gathering platform Scope: Construction Location: Offshore Tuxpan Veracruz Term: 329 days starting 10.Aug.07 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $5.5m+ Contract Type: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-010-07 Release: 10.May.07 Site visit: n/a 1st clarification meeting: 24.May.07 6th clarification meeting: 26.Jun.07 (last) Closing: 29.Jun.07 Submission & opening: 05.Jul.07 Registered bidders 1.CIT 2.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 3.Construcciones y Equipos Latinoamericanos (Protexa) 4.Dragados 5.Industria del Hierro (ICA Fluor Daniel) 6.J Ray Mcdermott 7.Swecomex 8.Shaw 9.Oceanografia 10.ABB 11.Grupo Constructor Global Potential participants Status AWARDED Decision: 20.Jul.07 Construcciones Mecanicas Monclova (COMMSA-GIMSA): $19million Updated 31.Jul.07 43. Sinan-118 [AWARDED] Project Light structure platform Scope: Engineering/ procurement/ construction/ loading/ fixing Location: Campeche basin GOM Term: 210 days starting 01.Aug.07 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $3.25m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-020-07 Release: 26.Apr.07 Site visit: n/a 1st clarification meeting: 11.May.07 4th clarification meeting: 14.Jun.07 (last) Closing: 14.Jun.07 Submission & opening: 20.Jun.07 Registered bidders 1.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 2.Industria del Hierro (ICA Fluor Daniel) 3.Dragados 4.Bosnor 5.Shaw 6.Swecomex 7.Construcciones y Equipos Latinoamericanos (Protexa) 8.ICS Triplex 9.JA Energy Fab Potential participants CIT. Evya Status AWARDED Decision: 20.Jul.07 Construcciones Mecanicas Monclova (COMMSA-GIMSA): $11million Updated 31.Jul.07 42. Sinan-So [AWARDED] Project Light structure platform Scope: Engineering/ procurement/ construction/ loading/ fixing Location: Campeche basin GOM Term: 210 days starting 30.Jul.07 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $3.75m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-019-07 Release: 17.Apr.07 Site visit: n/a 1st clarification meeting: 30.Apr.07 6th clarification meeting: 05.Jun.07 Closing: 07.Jun.07 Submission & opening: 13.Jun.07 Registered bidders 1.Bosnor 2.Dragados 3.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 4.Construcciones y Equipos Latinoamericanos (Protexa) 5.Tradeco 6.Industria del Hierro (ICA Fluor Daniel) 7.Shaw 8.Swecomex 9.CIT 10.ICS Triplex Potential participants Grupo Constructor Global, INCYQ, Evya Status AWARDED Decision: 20.Jul.07 Swecomex: $12million Updated 31.Jul.07 41. Yaxche-B [AWARDED] Project Light structure platform Scope: Engineering/ procurement/ construction/ loading/ fixing Location: Campeche basin GOM Term: 210 days starting 17.Jul.07 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $3.25m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-017-07 Release: 03.Apr.07 Site visit: n/a 1st clarification meeting: 23.Apr.07 4th clarification meeting: 28.May.07 Closing: 30.May.07 Submission & opening: 05.Jun.07 Registered bidders 1.Bosnor 2.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 3.Grupo Constructor Global 4.Industria del Hierro (ICA Fluor Daniel) 5.J Ray McDermott 6.Shaw 7.Dragados 8.CIT 9.Tradeco 10.Construcciones y Equipos Latinoamericanos (Protexa) 11.Swecomex 12.ICS Triplex Potential participants Industrias W, INCYQ Status AWARDED Decision: 19.Jul.07 Industria del Hierro (ICA Fluor Daniel): $11.5million Updated 31.Jul.07 40. HA-LT-01: Living quarter module [VOID] Project 187 living quarter module & interconnection bridge Scope: Engineering/ procurement/ construction/ loading/ fixing/ transport/ installation Location: Campeche basin GOM Term: 660 days starting 01.Aug.07 Mailstones: Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $20m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-013-07 Release: 29.Mar.07 Site visit: 12.Apr.07 1st clarification meeting: 17.Apr.07 8th clarification meeting: 29.May.07 Closing: 29.May.07 Submission & opening: 04.Jun.07 Registered bidders 1.Dragados 2.Industria del Hierro (ICA Fluor Daniel) 3.Swecomex 4.Grupo Constructor Global 5.JA Energy Fab 6.Tradeco 7.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 8.Evya 9.Keppel SLP 10.Ingelectric Potential participants SIDO E, GI, AILT, Industrias W, Alcatel, Swath, AVC, Heerema Status VOID Tender ruled on 19.Jul.07 A new RFP to be released shortly Updated 31.Jul.07 ___________________________________ FYI, we have got a comprehensive understanding of these tenders and offer expert tailor-made assistance to international companies pursuing projects in Mexico A description of our services in the bottom page Contact: mail@aramoni.com ____________________________________ 39. Tumut-A: Tetrapod [AWARDED] Project Offshore terapod platform Scope: Engineering/ procurement/ construction/ loading/ fixing Location: Campeche basin GOM Term: 330 days starting 13.Jul.07 Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $9m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-009-07 Release: 27.Mar.07 Site visit: n/a 1st clarification meeting: 13.Apr.07 6th clarification meeting: 25.May.07 Closing: 26.May.07 Submission & opening: 01.Jun.07 Registered bidders 1.Swecomex 2.Industria del Hierro (ICA Fluor Daniel) 3.Dragados 4.Construcciones Mecanicas Monclova (COMMSA-GIMSA) 5.Construcciones y Equipos Latinoamericanos (Protexa) 6.Bosnor 7.Shaw 8.J Ray Mcdermott 9.CIT 10.Grupo Constructor Global 11.Tradeco Potential participants Industrias W, INCYQ, Ardica Status AWARDED Decision: 12.Jul.07 Construcciones Mecanicas Monclova (COMMSA-GIMSA): $24million Updated 31.Jul.07
38. HA-RE-01: LIVING QUARTER MODULE (2nd round) [VOID] Project 150 living quarter module & interconnection bridge Scope: Engineering/ procurement/ construction/ loading/ fixing/ transport/ installation/ interconnection/ testing/ commissioning/ start-up Location: Rebombeo (re-pumping) complex Field: Campeche basin GOM Term: 570 days starting 21.Aug.07 Mailstones: Living module 480 days Transport 510 days Start-up 570 days Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $9m+ Contract Type: Lump sum & unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: Subcontracts allowed: Bid follow-up Ref: 18575106-036-06 Release: 26.Dec.06 Site visit: 03.Jan.07 1st clarification meeting: 04.Jan.07 15th clarification meeting: 25.May.07 Closing: 29.May.07 Submission & opening: 04.Jun.07 Decision: 22.Jun.07 (next) Registered bidders 1.Construcciones Mecanicas de Monclova (GIMSA-COMMSA) 2.Bosnor 3.Swecomex 4.Grupo Constructor Global 5.CIT 6.Ingelectric Norteamerica 7.Industria del Hierro (ICA Fluor Daniel) 8.Dragados 9.CIMISA Potential participants Global Offshore, C&M Marine Services USA Heerema Marine Contractors, Teleconstrucciones Mexicanas, Alcatel Bidders for 1st round 1.Construcciones Mecanicas de Monclova (GIMSA-COMMSA) 2.DMI International 3.Swecomex 4.AR del Golfo 5.Industria del Hierro (ICA Fluor Daniel) 6.CIMISA 7.Keppel SLP 8.Lonestar Marine Shelters 9.Dragados 10.Kepler Constructora Status VOID Tender ruled on 19.Jul.07 A new RFP to be released shortly Updated 31.Jul.07 CHEMUL: Underwater Platform [VOID] Project Scope: Katrina’s damage repair & platform full refurbishment Current location: Atlantic Marine dockyard, Mobile AL Service location: Contractor’s facilities Contract Commissioner: Pemex (Govt) Type: Unit prices Term: 435 days Payments: 30 days after invoice procedures Selection basis: Best qualified amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Bid follow-up Ref: 18575107-091-06 Release: 16.Nov.06 Site visit (Atlantic Marine dockyard, Mobile AL): 27.Nov.06 1st clarification meeting (Ciudad del Carmen Campeche): 05.Dec.06 7th meeting & closing: 02.Feb.07 Submission & opening: 08.Feb.07 Registered bidders (not comprehensive) 1.Cotemar 2.KSES USA 3.OIS Potential participant Halliburton Status VOID Tender ruled on 08.Feb.07 A new RFPs to be announced shortly Updated 25.May.07 PLATFORM COMPLEMENTARY WORKS (2nd-round) [AWARDED] Project Term: 365 days starting 26.Jan.07 Local content: 30% Bidders profile Company/consortium from countries having a free trade agreement with Mexico Experience: 5 yrs Combine equity: $45m+ Subcontracts allowed: Catering & accomodation/ X-rays/ ultrasonic inspection/ diving Contract Type: Unit prices Down payment: n/a Payments: 30 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bid follow-up Ref: 18575108-084-06 Release: 26.Sep.06 Site visit: 09.Oct.06 8th clarification meeting: 08.Dec.06 (last) Closing: 08.Dec.06 Submission & opening: 14.Dec.06 Registered bidders 1.Condux (Protexa) 2.Construcciones Integrales del Carmen 3.Diavaz 4.Cotemar 5.Global Offshore 6.Mantenimiento Marino de Mexico (Halliburton) 7.Oceanografia 8.Tradeco Bidders in 1st round Oceanografia, Condux (Protexa), Construcciones Integrales del Carmen, Cotemar, Tradeco Decision: 15.Jan.07 Finalizing: 25.Jan.07 Status AWARDED Oceanografia: $47million (Updated 19.Jan.07) 37. HA-CA-01: LIVING QUARTER MODULE [AWARDED] Project 1. Existing module uninstallation Scope: Engineering/ dismantlement/ loading/ fixing/ maritime transport/ unloading in Dos Bocas terminal (Tabasco)/ transport/ final disposition 2. New 150 living module Scope: Engineering/ procurement/ construction/ testing/ loading/ fixing/ transport/ installation on existing structure located in Cayo Arcas (Campeche basin)/ interconnection/ commissioning/ start-up Field: Campeche basin Term: 570 days starting 18.Oct.06 Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $9m+ Subcontracts allowed: Ships/ offshore catering/ accommodation/ X-rays/ NDT/ radio positioning Contract Type: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bid follow-up Ref: 18575106-011-06 Release: 20.Apr.06 Submission & opening: 04.Sep.06 Decision: 25.Oct.06 Registered bidders: 1.Construcciones Mecanicas de Monclova (GIMSA-COMMSA) 2.Swecomex 3.Industria del Hierro (ICA Fluor Daniel) 4.Construccion Ingenieria y Montaje Integral (CIMISA) 5.Lonestar Marine Shelters 6.GOIMAR 7.Dragados Offshore de Mexico 8.Keppel-SLP 9.AR del Golfo Status AWARDED Industria del Hierro (ICA Fluor Daniel): $90million (Updated 02.Nov.06) LIVING QUARTER MODULE [CANCELED] Project 151 living module Scope: Civil & electromechanical works/ superstructure/ heliport/ interconnection bridge Location: Rebombeo complex Field: Campeche basin Term: 600 days starting 18.Oct.06 Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $6.5m+ Contract Type: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Local content: 51% Subcontracts allowed: X-rays/ NDT/ project certification Bid follow-up Ref: 18575108-039-06 Release: 20.Jun.06 Registered bidders: 1.Construcciones Mecanicas de Monclova (GIMSA-COMMSA) 2.DMI International 3.Swecomex 4.AR del Golfo 5.Industria del Hierro (ICA Fluor Daniel) 6.CIMISA 7.Keppel SLP 8.Lonestar Marine Shelters 9.Dragados 10.Kepler Constructora Decision: 15.Aug.06: CANCELED A 2nd-round tender to be announced next year (Updated 19.Aug.06) Platform conclusion [VOID] Project Equipment related assignments Scope: EPC Platforms: AKAL complex Field: Campeche basin Term: 452 days from 22.Jun.06 to 02.Sep.07 Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $12m+ Subcontracts allowed: Hot-tapping/ X-rays/ NDT/ PLC setting/ FM-200/ CO2/ offshore catering & accommodation/ satellite positioning/ diving/ risk analysis Contract: Type: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bid follow-up: Ref: 18575106-008-06 Release: 23.Mar.06 Deadline: 18.May.06 Submission & opening: 24.May.06 Registered bidders: 1.Diavaz 2.Demar 3.Dragados 4.Construcciones Integrales del Carmen 5.Condux (Protexa) 6.Oceanografia 7.Lico Construcciones 8.AR del Golfo 9.GOIMSA Decision: 08.Jun.06: VOID A 2nd-round tender to be announced soon (Updated 16.Jun.06) Platform linking [AWARDED] Project Platform interconnections: PB-KU-M & HA-KU-M PB-KU-M & PP-KU-M PB-KU-S & HA-KU-S PB-KU-S & PP-KU-S PP-KU-S & PP-KU-G PP-KU-S & PP-KU-G PP-KU-A2 & HA-ZAAP-C PP-KU-A2 & PP-ZAAP-C Pipes: PP-ZAAP-B to PB-ZAAP-C: Oil 24” 2.4 Km E-KU-A2 to CA-AC-2: Gas 36” 16.8 Km PI-AC-1 A PP-KU-S: Nitrogen 36” 17.2 Km PB-KU-S A PP-KU-M: Nitrogene 24” 6.4 Km PB-KU-S A PP-ZAAP-C: Nitrogene 24” 14 Km Scope: EPC Field: Ku-Maloob-Zaap Term: 270 days from 25.May.06 to 18.Feb.07 Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $8.5m+ Subcontracts allowed: Ships/ hot-tapping/ X-rays/ NDT/ PLC setting/ FM-200/ CO2/ offshore catering & accommodation/ satellite positioning/ diving/ risk analysis Contract Type: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bid follow-up Ref: 18575106-007-06 Release: 16.Mar.06 Submission & opening: 20.Apr.06 Registered bidders: 1.Diavaz 2.Demar 3.Oceanografia 4.Condux (Protexa) 5.Jantesa 6.ARB Arendal 7.GOIMSA 8.Construcciones Integrales del Carmen 9.Dragados Decision: 10.May.06 Demar Instaladora y Constructora: $40million (Updated 12.May.06) 36. HA-AJ-01:Living quarter module [AWARDED] Project 1. Existing module uninstallation Scope: Engineering/ dismantle/ loading/ fixing/ maritime transport/ unloading in Dos Bocas terminal (Tabasco)/ transport/ final disposition 2. New 84 living module Scope: Engineering/ procurement/ construction/ testing/ loading/ fixing/ transport/ installation/ interconnection/ commissioning/ start-up Field: Cantarell Term: 570 days from 30.Jan.06 to 22.Aug.07 Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $10m+ Subcontracts allowed: Ships/ offshore catering/ accommodation/ diving/ transport & crane in Dos Bocas terminal Contract: Type: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bid follow-up: Ref: 18575106-027-05 Release: 30.Aug.05 Submission & opening: 14.Dec.05 Registered bidders (not comprehensive): 1.Construcciones y Equipos Latinoamericanos (CELASA-PROTEXA) 2.Swecomex 3.Dragados Offshore Mexico 4.Siemens 5.Construcciones Mecanicas de Monclova (GIMSA-COMMSA) 6.Bosnor 7.Lonestar Marine Shelters 8.Farmadule Emtunga AB 9.Bay Inelectra de Mexico 10.ESPL Optima 11.Delta Engineering Corp 12.Keppel SLP 13.CIMISA 14.Industria del Hierro (ICA Fluor Daniel) Decision: 25.Jan.06 Swecomex: $60million (Updated 09.Feb.06) FPSO Supervision Service (2nd round) [AWARDED] Scope: Technical assistance & supervision for engineering/ procurement/ construction/ installation/ testing/ commissioning & start-up of an FPSO in the GOM Term: from Nov-05 to Jul-07 Working place: Norway, UAE, Singapore/ US/ Sweden/ Spain & China Selection basis: Lowest price bid from qualified proposals Bid follow-up: Ref: 18200002-020-05 Release: 24.Nov.05 Submission & offers disclosure: 21.Dec.05 Registered bidders: 1.Intec Engineering (US) 2.Global Project Consultants (US) 3.Cygnus Industrial 4.SGS 5.Bureau Veritas Decision: 09.Jan.06 Cygnus Industrial: $3.64million (Updated 20.Jan.06) 35. Carpa-B (Gathering) [AWARDED] Project description Technical: Gathering platform Location: Poza Rica-Altamira Scope: Engineering/ procurement/ fabrication/ installation Term: 333 days from 21-Jul-05 Contracts: Unit prices Down payment: n/a Payments: 30 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $9m+ Subcontracts allowed: Engineering/ risk analysis/ certification/ sub-inspection/ non-destructive testing/ transport/ installation Bid follow-up: Ref: 18575008-012-05 Release: 10-Mar-05 Registration deadline: 20-May-05 Submission: 26-May-05 Registered bidders (not comprehensive): 1.Swecomex 2.Shaw Mexican Holdings 3.Construcciones y Equipos Latinoamericanos (PROTEXA) 4.Stolt Offshore 5.Evya 6.Industria del Hierro (ICA) 7.Construccion Ingenieria y Montaje Integral (CIMISA) Offers disclosure: 10-Jun-05 Decision: 22-Jul-05 Shaw Mexican Holdings $23million 34. Bagre-C (Gathering) [AWARDED] Project description Technical: Gathering platform Location: Poza Rica-Altamira Scope: Engineering/ procurement/ fabrication/ installation Term: 330 days from 09-May-05 Contracts: Unit prices Down payment: n/a Payments: 30 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $9m+ Subcontracts allowed: Engineering/ risk analysis/ certification/ sub-inspection/ non-destructive testing/ transport/ installation 82Bid follow-up: Ref: 18575008-082-04 Release: 28-Dec-04 Submission: 15-Mar-05 Registered bidders: 1.Construcciones y Equipos Latinoamericanos (PROTEXA) 2.Industria del Hierro (ICA) 3.Evya 4.Shaw Mexican Holdings 5.COMINTER 6.CIMISA 7.Swecomex 8.Abengoa Mexico 9.Stolt Offshore Offers disclosure: 30-Mar-05 Decision: 11-May-05 SIPHNOS $15.6million (Updated 20-May-05) a. Offshore transport & installation [VOID] Project description Scope/ location: Transport from fabrication yards/ installation in Campeche basin GOM Platforms included: Drill: PP-KU-S, PP-ZAAP-A/B/D, PP-CITAM-A, PP-SIHIL-A & PP-AKAL-Q/W Production: PB-KU-M, PB-KU-S, PB-KU-A2 & PB-KU-H Living quarters: HA-KU-M/S/H & HA-ZAAP-C Term: 597 days from 07-May-05 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $30m+ Subcontracts allowed: Ship services/ x-ray inspection/ non-destructive testing/ engineering/ diving/ satellite positioning/ ROV/ grommets-chackles-lift frames Bid follow-up: Ref: 18575106-047-04 Release: 30-Dec-04 Registration deadline: 11-Mar-05 Submission: 17-Mar-05 Registered bidders: 1.Heerema Marine Contractors Mexico 2.Condux (PROTEXA) 3.Cotemar 4.Servicios Maritimos de Campeche 5.Maritima Mexicana (TMM) 6.Oceanografia 7.Saipem 8.Global Offshore Mexico Offers disclosure: 05-Apr-05 Decision: 22-Apr-05 VOID (Updated 25-Apr-05) 33. PP-AKAL-W (Drill) Project description Technical: 8-leg drilling platform Location: Field Cantarell Campeche basin Scope: Procurement/ fabrication/ testing/ loading/ fixing Term: 450 days from 20-Dec-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $7.3m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-042-04 Release: 05-Oct-04 Submission: 02-Dec-04 Registered bidders: 1.Industria del Hierro (ICA Fluor Daniel) 2.Dragados Offshore de Mexico 3.Berry Contracting 4.Shaw Mexican Holdings 5.Swecomex 6.Evya 7.Bosnor 8.Construcciones Mecanicas de Monclova (COMMSA) 9.Construcciones y Equipos Lationamericanos CELASA (Protexa) 10.COMINTER 11.Kiewit Offshore Services 12.Construccion Ingenieria y Montaje Integral (CIMISA) 13.Abengoa Mexico Offers disclosure: 10-Dec-04 Decision: 10-Jan-05 Construcciones Mecanicas de Monclova (COMMSA-GIMSA): $39.5million (Updated 28-Jan-05) 32. PP-AKAL-Q (Drill) Project description Technical: 8-leg drilling platform Location: Field Cantarell Campeche basin Scope: Procurement/ fabrication/ testing/ loading/ fixing Term: 450 days from 20-Dec-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $7.3m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-041-04 Release: 05-Oct-04 Submission: 23-Nov-04 Registered bidders: 1.Industria del Hierro (ICA Fluor Daniel) 2.Dragados Offshore de Mexico 3.Berry Contracting 4.Shaw Mexican Holdings 5.Swecomex 6.Evya 7.Bosnor 8.Construcciones y Equipos Latinoamericanos CELASA (PROTEXA) 9.Construcciones Mecanicas de Monclova (COMMSA) 10.COMINTER 11.Kiewit Offshore Services 12.Abengoa Mexico 13.Delta Engineering Corp 14.Construccion Ingenieria y Montaje Integral (CIMISA) Decision: 17-Dec-04 Construcciones Mecanicas de Monclova (COMMSA-GIMSA): $40million (Updated 28-Jan-05) 31. PP-SIHIL-A (Drill) Project description Technical: 8-leg drilling platform Location: Block Sihil Campeche basin Scope: Procurement/ fabrication/ testing/ loading/ fixing Term: 450 days from 20-Dec-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $7.3m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-040-04 Release: 05-Oct-04 Submission: 16-Nov-04 Registered bidders: 1.Industria del Hierro (ICA Fluor Daniel) 2.Dragados Offshore de Mexico 3.Berry Contracting 4.Shaw Mexican Holdings 5.Swecomex 6.Evya 7.Bosnor 8.Construcciones y Equipos Latinoamericanos CELASA (PROTEXA) 9.Construcciones Mecanicas de Monclova (COMMSA) 10.COMINTER 11.Kiewit Offshore Services 12.Obras Portuarias de Coatz 13.Nautica Saltamar Decision: 14-Dec-04 Construcciones Mecanicas de Monclova (COMMSA-GIMSA): $36.5million (Updated 28-Jan-05) 30. PB-KU-H (Production) Project description Field: Ku-Maloob-Zaap Scope: Engineering/ procurement/ fabrication/ yard testing/ loading/ fixing/ technical assistance for installation/ testing/ commissioning/ start-up Term: 790 days from 25-Nov-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $22m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-022-04 Release: 08-Jun-04 Submission: 06-Oct-04 Registered bidders: 1.Industria del Hierro (ICA Fluor Daniel) 2.Swecomex 3.Construcciones y Equipos Latinoamericanos (PROTEXA) 4.Maritima Petroleo e Ingenieria de Mexico 5.Turbinas Solar 6.Bosnor 7.Dynamic Industries 8.Odebrecht Oil & Gas Mexico 9.Kiewit Offshore Services 10.Dragados Offshore de Mexico Decision: 24-Nov-04 Bosnor: $162million (Updated 29-Nov-04) 28/29. HA-KU-H & ZAAP-C (Living quarters) Project Description: 2x220 offshore living quarters including piles sub/superstructures living modules heliport & operational systems Field: Ku-Maloob-Zaap Scope: Engineering/ procurement/ fabrication/ yard testing/ loading/ fixing/ technical assistance for installation/ interconnections/ commissioning/ start-up Term: 663 days from 02-Dec-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $21m+ Subcontracts allowed: HAZOP/ IPR/ marine services/ X-rays/ non-destructive testing/ engineering/ model/ weighing Bid follow-up: Ref: 18575106-027-04 Release: 17-Jun-04 Submission: 22-Oct-04 Registered bidders: 1.SLP Engineering 2.Alianz Petroleum 3.Swecomex 4.Delta Engineering Corporation 5.Construcciones y Equipos Latinoamericanos (PROTEXA) 6.Construcciones Mecanicas de Monclova (COMMSA) 7.Bam Steel Structures 8.Odebrecht Oil & Gas Mexico 9.Berry Contracting 10.Bosnor - Leirvik Module Technology 11.Dynamic Industries 12.Dragados Offshore de Mexico 13.Constructora Bay de Mexico 14.Emtunga 15.CELASA (PROTEXA) 16.Keppel Offshore & Marine 17.Swecomex 18.Technip Offshore 19.Maritima Petroleo e Ingenieria de Mexico Decision: 10-Dec-04 Berry Contracting - Berry GP - Inelectra: $149million (Updated 12-Dec-04) 26/27. HA-KU-S & M (Living quarters) Project Description: 2x220 offshore living quarters including piles sub/superstructures living modules heliport & operational systems Field: Ku-Maloob-Zaap Scope: Engineering/ procurement/ fabrication/ yard testing/ loading/ fixing/ technical assistance for installation/ interconnections/ commissioning/ start-up Term: 663 days from 08-Nov-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $25m+ Subcontracts allowed: HAZOP/ IPR/ marine services/ X-rays/ non-destructive testing/ engineering/ model/ weighing Bid follow-up: Ref: 18575106-025-04 Release: 03-Jun-04 Registration deadline: 16-Sep-04 Submission: 22-Sep-04 Registered bidders: 1.SLP Engineering 2.Technip Offshore 3.Dragados Offshore Mexico 4.Condux 5.Swecomex 6.Construcciones y Equipos Latinoamericanos (PROTEXA) 7.Alianz Petroleum 8.Delta Engineering Corporation 9.Bam Steel Structures 10.Bosnor 11.Dynamic Industries 12.Keppel Offshore & Marine USA 13.Emtunga 14.Construcciones Maritimas y Terrestres de Tabasco 15.Constructora Bay de Mexico 16.Leirvik Beacom Maritime 17.Maritima Petroleo e Ingenieria de Mexico 18.Odebrecht Oil & Gas Mexico 19.Berry Contracting Offers disclosure: 07-Oct-04 Decision: 29.Oct.04 Keppel Offshore and Marine USA - SLP Engineering Limited - Anfels - Gulf Island: $164million 25. CITAM-A (4-legs) Project Scope: Engineering/ procurement/ fabrication/ loading/ fixing Term: 365 days from 20-Sep-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $2.5m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-020-04 Release: 03-Jun-04 Submission: 29-Jul-04 Registered bidders (not comprehensive): 1.Constructora Bay de Mexico 2.Construcciones Mecanicas de Monclova (COMMSA) 3.Swecomex 4.Construcciones y Equipos Latinoamericanos (PROTEXA) 5.COMINTER 6.Shaw Global Energy Services-Shaw Mexican Holdings 7.Bosnor 8.Cominter 9.Berry Contracting Offers disclosure: 13-Aug-04 Decision: 01-Sep-04 Construcciones y Equipos Latinoamericanos (PROTEXA) $24million 24. CB-ZAAP-C (Compression) Project Description: Compression platform/ bridge to production PB-ZAAP-C Field: Ku-Maloob-Zaap Scope: Engineering/ procurement/ fabrication/ loading/ fixing/ technical assistance for installation/ interconnections/ commissioning/ start-up Term: 810 days from 05-Nov-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $20.5m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-017-04 Release: 06-May-04 Registration deadline: 17-Sep-04 Submission: 23-Sep-04 Registered bidders: 1.Construcciones y Equipos Latinoamericanos (PROTEXA) 2.Industria del Hierro (ICA Fluor Daniel) 3.Maritima Petroleo e Ingenieria de Mexico 4.Swecomex 5.Keppel Offshore & Marine USA 6.Kiewit Offshore Services 7.Nuovo Pignone 8.Bosnor 9.Tubinas Solar 10.Dragados Offshore Mexico Offers disclosure: 05-Oct-04 Decision: Cancelled 23. PB-ZAAP-C (Link/production) Project Description: Link/production platform/ burner/ bridge to drilling PP-ZAAP-C/ bridge to new living-quarter HA-ZAAP-C/ bridge & 2 tripods to burner Field: Ku-Maloob-Zaap Scope: Engineering/ procurement/ fabrication/ loading/ fixing/ technical assistance for installation/ interconnections/ commissioning/ start-up Term: 790 days from 01-Nov-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $19.5m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-016-04 Release: 06-May-04 Registration deadline: 08-Sep-04 Submission: 14-Sep-04 Registered bidders (not comprehensive): 1.Izar Construcciones 2.Construcciones y Equipos Latinoamericanos (PROTEXA) 3.Industria del Hierro (ICA Fluor Daniel) 4.Turbinas Solar 5.Constructora Bay de Mexico 6.Bosnor 7.Dragados Offshore de Mexico 8.Maritima Petroleo e Ingenieria de Mexico 9.Swecomex 10.Keppel Offshore & Marine USA 11.Kiewit Offshore Services 12.Nuovo Pignone Offers disclosure: 24-Sep-04 Decision: Cancelled 22. PP-Zaap-A (Drill) Project Field: Ku-Maloob-Zaap Scope: Engineering/ procurement/ fabrication/ loading/ fixing/ technical assistance for installation Term: 450 days from 20-May-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $6m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-005-04 Release: 29-Jan-04 Submission: 29-Mar-04 Registered bidders (not comprehensive): 1.Industria del Hierro 2.Construcciones y Equipos Latinoamericanos (PROTEXA) 3.Constructora Bay de Mexico 4.Bosnor 5.Construccion Ingenieria y Montaje Integral (CIMISA) 6.Swecomex 7.Maritima Petroleo e Ingenieria de Mexico 8.Swath de Mexico Offers disclosure: 19-Apr-04 Decision: 07.May.04 ICA Fluor Daniel: $43million 21. PP-Zaap-B (Drill) Project Field: Ku-Maloob-Zaap Scope: Engineering/ procurement/ fabrication/ loading/ fixing/ technical assistance for installation Term: 450 days from 21-May-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $5.5m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-006-04 Release: 29-Jan-04 Registration deadline: 25-Mar-04 Submission: 31-Mar-04 Registered bidders: 1.Industria del Hierro 2.Construcciones y Equipos Latinoamericanos (PROTEXA) 3.Bosnor 4.Construccion Ingenieria y Montaje Integral (CIMISA) 5.Swecomex 6.Maritima Petroleo e Ingenieria de Mexico 7.Swath de Mexico 8.Constructora Bay de Mexico Offers disclosure: 20-Apr-04 Decision: 21.May.04 Industria del Hierro (ICA Fluor Daniel): $39million 20. PP-Zaap-D (Drill) Project Field: Ku-Maloob-Zaap Scope: Engineering/ procurement/ fabrication/ loading/ fixing/ technical assistance for installation Term: 450 days from 24-May-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $5.7m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-007-04 Release: 29-Jan-04 Registration deadline: 27-Mar-04 Submission: 02-Abr-04 Registered bidders: 1.Industria del Hierro 2.Construcciones y Equipos Latinoamericanos (PROTEXA) 3.Constructora Bay de Mexico 4.Dragados Offshore de Mexico 5.Bosnor 6.Swecomex 7.Construccion Ingenieria y Montaje Integral (CIMISA) 8.Maritima Petroleo e Ingenieria de Mexico 9.Swath de Mexico Offers disclosure: 22-Apr-04 Decision: 21.May.04 Industria del Hierro (ICA Fluor Daniel): $42million 19. PP-KU-S (Drill) Project Field: Ku-Maloob-Zaap Project: Drill platform/ bridge to PP-KU-G (in place) Scope: Engineering/ procurement/ fabrication/ loading/ fixing/ technical assistance for installation Term: 450 days from 08-May-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $5.5m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-002-04 Release: 22-Jan-04 Submission: 22-Mar-04 Registered bidders: 1.Dragados Offshore de Mexico 2.Industria del Hierro 3.Construcciones y Equipos Latinoamericanos (PROTEXA) 4.Bosnor 5.Constructora Bay de Mexico 6.Swecomex 7.Construccion Ingenieria y Montaje Integral (CIMISA) 8.Kiewit Offshore Services Offers disclosure: 05-Apr-04 Decision: 07.May.04 Industria del Hierro (ICA Fluor Daniel): $45million 18. YAXCHE-A (8L-Drill) [AWARDED] Scope: Engineering/ procurement/ construction/ loading/ fixing Term/ field/ location: 300 days from 02-Apr-04/ Tabasco littoral/ Gulf of Mexico Bid follow-up: Ref: 18575106-010-03 Release: 30-Dec-03 Bidders: 1.Construcciones y Equipos Latinoamericanos (PROTEXA) 2.Bosnor 3.Construccion Ingenieria y Montaje Integral (CIMISA) 4.Swecomex 5.COMINTER Decision: 22-Mar-04 COMINTER $22.5 million (Updated 26-Mar-04) 17. PB-KU-M (Production) Project: Production platform/ burner/ bridge to drilling PP-KU-M (in place)/ bridge to living-quarter HA-KU-M (to be tendered)/ bridge & tripod to burner in KMZ field Original scope: Engineering/ procurement/ fabrication/ loading/ transport/ installation/ interconnection/ commissioning/ start-up Actual scope: Engineering/ procurement/ fabrication/ loading/ technical assistance for installation/ interconnection/ commissioning/ start-up Term: 760 days from 23-Jun-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $18m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-007-03 Release: 23-Dec-03 Registration deadline: 07-May-04 Submission: 13-May-04 Registered bidders: 1.Industria del Hierro (ICA Fluor Daniel) 2.J Ray McDermott 3.Bosnor 4.Swecomex 5.ABB Mexico 6.Construcciones y Equipos Latinoamericanos (PROTEXA) 7.IZAR Construcciones Navales 8.Kiewit Offshore Services 9.Odebrecht Oil & Gas Mexico 10.Shaw Mexican Holdings 11.Construccion Ingenieria y Montaje Integral (CIMISA) 12.Berry Contracting 13.Dragados Offshore 4.COMMISA 15.Evya 16.Technip Offshore 17.Turbinas Solar 18.Swath de Mexico 19.Siemens 20.CPI-Berwanger 21.Maritima Petroleo e Ingenieria de Mexico 22.Comfact Corporation Offers disclosure: 21-May-04 Decision: 01-Jun-04 Swecomex-Condumex (parent company): $130million 16. PB-KU-S (Production) Project: Production platform/ burner/ bridge to drilling PP-KU-S/ bridge to living-quarter HA-KU-S/ bridge & tripod to burner in KMZ field Original scope: Engineering/ procurement/ fabrication/ loading/ transport/ installation/ interconnection/ commissioning/ start-up Actual scope: Engineering/ procurement/ fabrication/ loading/ technical assistance for installation/ interconnection/ commissioning/ start-up Term: 880 days from 12-Jul-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $18m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-008-03 Release: 23-Dec-03 Registration deadline: 28-May-04 Submission: 03-Jun-04 Registered bidders: 1.Swecomex 2.Bosnor 3.Dragados Offshore 4.Construccion Ingenieria y Montaje Integral (CIMISA) 5.Grupo Mexicano de Desarrollo (GMD) 6.ABB Mexico 7.Construcciones y Equipos Latinoamericanos (PROTEXA) 8.J Ray McDermott 9.Kiewit Offshore Services 10.Odebrecht Oil & Gas Mexico 11.Siemens 12.Shaw Mexican Holdings 13.Swath de Mexico 15.Dynamic Industries 16.Turbinas Solar 17.Constructora Bay de Mexico 18.Maritima Petroleo e Ingenieria de Mexico Offers disclosure: 10-Jun-04 Decision: 01-Jul-04 Swecomex: $225million 15. PB-KU-A2 (Production) Project: Production platform/ burner/ bridge to E-KU-A2 (to be tendered)/ bridge & tripod to burner in KMZ field Original scope: Engineering/ procurement/ fabrication/ loading/ transport/ installation/ interconnection/ commissioning/ start-up Actual scope: Engineering/ procurement/ fabrication/ loading/ technical assistance for installation/ interconnection/ commissioning/ start-up Term: 760 days from 03-Aug-04 Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $18m+ Subcontracts allowed: Bid follow-up: Ref: 18575106-009-03 Release: 23-Dec-03 Registration deadline: 15-Jun-04 Submission: 21-Jun-04 Registered bidders: 1.Dragados Offshore 2.Swecomex 3.ABB Mexico 4.Construcciones y Equipos Latinoamericanos (PROTEXA) 5.J Ray McDermott 6.Kiewit Offshore Services 7.Odebrecht Oil & Gas Mexico 8.Construccion Ingenieria y Montaje Integral (CIMISA) 9.Shaw Mexican Holdings 10.Constructora Bay de Mexico 11.Siemens 12.Turbinas Solar 13.Bosnor 14.Swath de Mexico 15.Maritima Petroleo e Ingenieria de Mexico 16.GIMSA Construcciones Industriales (TRIBASA) Offers disclosure: 29-Jun-04 Decision: 16-Jul-04 Dragados Offshore de Mexico $185million 13/14. SINAN-A/B (8L-Drill) Scope: Engineering/ procurement/ construction/ loading Term/ field/ location: 450 days from 11-Mar-04/ Ku-Maloob-Zaap/ Bay of Campeche Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $5.5m+ Subcontracts allowed: Engineering/ rolling/ cranes/ weighing/ non destructive testing Bid follow-up: Ref: 18575106-006-03 Release: 02-Dec-03 Top bidders [Clarifications]{Attendances}: 1. Bay de Mexico [112]{2} 2.ICA Fluor Daniel [55]{1} 3.Bosnor [48]{2} 4.Evya [34]{2} 5.Construcciones y Equipos Latinoamericanos (PROTEXA) [39]{1} 6.Swecomex [25]{1} 7.Comercializacion Internacional de Tampico [19]{2} 8.Dragados Offshore Mexico [12]{2} 9.Construccion Ingenieria y Montaje Integral (CIMISA) [12]{2} 10.Construcciones Mecanicas de Monclova (COMMSA/GIMSA) [1]{0} Submission: 30-Jan-04 Offers disclosure: 11-Feb-04 Decision: 23-Feb-04 Construccion Ingenieria y Montaje Integral (CIMISA) $43million (Updated 27-Feb-04) 12. Lobina-1 (Gathering) Scope: Engineering/ procurement/ construction/ installation Term/ field/ location: 331 days from 22-Mar-04/ Lobina/ Bay of Campeche Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $3m+ Subcontracts allowed: Engineering/ x-ray inspection/ transport/ installation/ certification Bid follow-up: Ref: 18575106-003-03 Release: 18-Nov-03 Registered bidders: 1.Construcciones Mecanicas de Monclova (COMMSA/GIMSA) 2.ICA Fluor Daniel 3.Shaw Mexican Holdings 4.ABB Mexico 5.Construcciones y Equipos Latinoamericanos (PROTEXA) 6.Evya 7.Industria del Hierro (ICA) 8.BBI 9.Stolt Offshore Submission: 10-Feb-04 Offers disclosure: 20-Feb-04 Decision: 02-Apr-04 Shaw Mexican Holdings $15.5million (Updated 02-Apr-04) 10/11. SINAN-C&D (8L-Drill) Scope: Engineering/ procurement/ construction/ loading Term/ field/ location: 450 days from 16-Jan-04/ Ku-Maloob-Zaap/ Bay of Campeche Contracts: Unit prices Down payment: n/a Payments: 20 days after invoicing procedures Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $6.75m+ Subcontracts allowed: Bid follow-up: Ref: 18575087-017-03 Release: 02-Oct-03 Registered bidders: 1.Industria del Hierro (ICA) 2.Bosnor 3.Construcciones Mecanicas de Monclova (COMMSA/GIMSA) 4.Construcciones y Equipos Latinoamericanos (PROTEXA) 5.Swecomex 6.Comercializadora Internacional de Tampico 7.EVYA 8.Constructora Bay de Mexico 9.Siemens 10.Dragados Offshore de Mexico 11.Honeywell 12.CIGSA Fabricacion 13.Invensys Systems Mexico 14.Emerson Project Management 15.Smar Mexico 16.Construtora Andrade Gutierrez 17.Saw Mexican Holdings 18.Hanover Compression Ltd Partnership 19.ICA Fluor Daniel 20.Energy Land & Sea Projects 21.Construccion Ingenieria y Montaje Integral (CIMISA) Submission: 04-Dec-03 Offers disclosure: 12-Dec-03 Decision: 16-Jan-04 WINNER: Construcciones Mecanicas de Monclova (COMMSA/GIMSA) $44million (Updated 22-Jan-04) 9. PP-KU-C (Drill) Scope: Engineering/ procurement/ construction/ loading/ technical assistance for installation Term/ field/ location: 525 days from 04-Oct-03/ Ku-Maloob-Zaap/ Gulf of Mexico Contracts: Unit prices Down payment: N/A Payments: 20 days after invoicing procedures Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $5m+ Subcontracts allowed: Engineering/ model/ non destructive testing/ weighing/ x-rays/ HAZOP-IPR Bid follow-up: Ref: 18575087-015-03 Release: 24-Jul-03 Registered bidders: 1.Swecomex 2.Evya 3.Bosnor 4.Construcciones y Trituraciones 5.Smar Mexico 6.Industria del Hierro (ICA) 7.Comercializacion Internacional Tampico 8.Honeywell 9.CIGSA Fabricacion 10.Aasercath 11.Asociacion en Ingenieria Aplicada 12.ABC Ingenieria Integral 13.ACE Service 14.C-T CAD Ingenieria y Proyectos 15.Ingenieria Total y Construcciones 16.Bufete Constructor America 17.Emerson Process Management 18.Construcciones Mecanicas de Monclova (COMMSA) Submission: 03-Sep-03 Offers disclosure: 11-Sep-03 Decision: 07-Oct-03 WINNER: Bosnor $37million (Updated 09-Oct-03) 7/8. PP-Maloob-A&B (Drill) Scope: Engineering/ procurement/ construction/ loading/ transport (CANCELED)/ technical assistance for installation Name / term / field/ location: 1. PP-Maloob-A/ 560 days from 29-Sep-03/ Ku-Maloob-Zaap/ Gulf of Mexico 2. PP-Maloob-B/ 590 days from 29-Sep-03/ Ku-Maloob-Zaap/ Gulf of Mexico Contracts: Unit prices Payments: 20 days after invoicing procedures Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $5m+ per contract Subcontracts allowed: Engineering/ models/ non destructive testing/ XRays/ weighing/ transport (CANCELED)/ HAZOP/ IPR Bid follow-up Ref: 18575087-009-03 Release: 22-May-03 Registered bidders: 1.Swecomex 2.Bosnor 3.ICA Fluor Daniel 4.Emerson Process Management 5.Smar Mexico 6.Duro Felguera 7.Honeywell 8.Equipomex 9.Industria del Hierro 10.CIGSA Fabricacion 11.Promaquina 12.Sodes Mexico 13.Construcciones Mecanicas de Monclova (COMMSA) 14.Construcciones y Equipos Latinoamericanos 15.Constructora Bay de Mexico 16.Siemens 17.Izar Construcciones Navales 18.Invensys Systems Mexico 19.ABB Mexico Submission: 21-Aug-03 Offers disclosure: 01-Sep-03 Decision: 12-Sep-03 WINNER: Swecomex $80.5million (Updated 18-Sep-03) 6. Manik-A (Drill) Scope: Engineering/ procurement/ construction/ loading/ transport (CANCELED)/ certification (CANCELED) Term/ field/ location: 420 days from 22-Sep-03/ Abkatum/ Gulf of Mexico Contracts: Unit prices Payments: 20 days after invoicing procedures Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $5m+ Subcontracts allowed: Engineering/ non destructive testing/ weighing/ transport (CANCELED)/ cerfification (CANCELED) Bid follow-up: Ref: 18575087-008-03 Release: 29-May-03 Registered bidders: 1.Swecomex 2.Bosnor 3.Smar Mexico 4.ICA Fluor Daniel 5.Duro Felguera 6.Honeywell 7.Industria del Hierro (ICA) 8.CIGSA Fabricacion 9.Constructora Bay de Mexico 10.Construcciones Mecanicas de Monclova 11.Construcciones y Equipos Latinoamericanos 12.Comercializacion Internacional de Tampico 13.Siemens 14.Izar Construcciones Navales Submission: 06-Aug-03 Decision: 02-Sep-03 WINNER: Swecomex $33.5million (Updated 03-Sep-03) 5. KU-A2 (Link) Scope: Engineering/ procurement/ construction/ loading/ transport/ technical assistance for installation (Rev 12-Jun-03)/ testing/ start-up Project: Ku-Maloob-Zaap Location: Campeche/KUMAZA field/Gulf of Mexico Term: 570 days from 20-Aug-03 (Rev 12-Jun-03) Contract: Unit prices Payments: 20 days after invoicing procedures Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $9.5m+ (Rev 12-Jun-03) Subcontracts allowed: Engineering/ models/ testing/ XRays/ transport/ HAZOP/ IPR Bid follow-up: Ref: 18575087-002-03 Release: 10-Apr-03 Bidders: 1.Bufete Industrial 2.Detroit Diesel Allison de Mexico 3.ICA Fluor Daniel 4.Constructora Bay de Mexico 5.Emerson Process Management 6.Smar Mexico 7.Equipos y Servicios VICA 8.Dragados Offshore 9.Swecomex 10.Bosnor 11.Construcciones Mecanicas de Monclova 12.Odebrecht Oil & Gas Mexico 13.Trade Ingenieria y Proyectos 14.CIGSA Fabricacion 15.Honeywell Mexico 16.Invensys Systems Mexico 17.Construcciones y Equipos Latinoamericanos 18.Siemens Decision: 08-Aug-03 WINNER: Construcciones Mecanicas de Monclova (COMMSA/GIMSA) $48million (Updated 07-Aug-03) 3/4. MAY-A&B (Drill) g. Drilling platforms MAY-A & B Scope: Engineering/ procurement/ construction/ loading/ transport Location: Campeche/Gulf of Mexico Term: 462 days starting 18-Jul-03 Contract: Unit prices Payments: 20 days after invoicing procedures Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $11m+ Subcontracts allowed: Engineering/ models/ testing/ weighing/ transport/ certification Bid information Ref: 18575087-001-03 Release: 12-Mar-03 Register deadline: 04-Jun-03 (Rev 20-May-03) (Done) Site visit: N/A 1st Bidders meeting: 14-Apr-03 (Done) 2nd Bidders meeting: 23-Apr-03 (Done) Submission: 10-Jun-03 (Rev 20-May-03) (Next event) Offers disclosure: 17-Jun-03 (Rev 20-May-03) Bid follow-up: Registered bidders (not comprehensive): 1.Cigsa Fabricacion 2.Duro Felguera 3.ICA Fluor Daniel 4.Bosnor 5.Swecomex 6.Corporacion Janko 7.Edemtec 8.Odebrecht Oil & Gas Mexico 9.Trade Ingenieria y Proyectos 10.Integrated Power Systems 11.Equipos y Servicios Vica 12.Reymon de Mexico 13.Constructora Bay de Mexico 14.Construcciones Mecanicas Monclova 15.Dynamic Industries 16.Comercializadora Internacional de Tampico 17.Construcciones y Equipos Latinoamericanos 18.Talleres Navales del Golfo 19.J Ray McDermott Decision: 01-Jul-03 WINNER: ICA Fluor Daniel $55million (Updated 04-Jul-03) 2. Ixtal-A (8L-Gathering) 18575038-019-02/ Bay de Mexico 1. Lankahuasa-1 (Gathering) d. Offshore well recovery platform Lankahuasa 1 Scope: Engineering-Procurement-Construction Complex: Lankahuasa Location: Offshore Poza Rica Veracruz Term: 244 days Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium Combine equity: US$3.5m+ Bid information Ref: 18575008-062-02 Release: 10-Oct-02 Site visit: 14-Oct-02 1st Bidders meeting: 16-Oct-02 2nd Bidders meeting: 23-Oct-02 Register by 06-Nov-02 Submission due: 12-Nov-02 Offers disclosure: 26-Nov-02 Bid follow-up: Registered bidders (not comprehensive): 1.Bosnor 2.Construcciones Mecanicas Monclova 3.Promotora e Inversora ADISA 4.Comercializacion Internacional de Tampico 5.ICA Fluor Daniel 6.Constructora Bay de mexico 7.Construcciones y Equipos Latinoamericanos 8.Dragados Offshore 9.ABS Group Services Mexico Decision: WINNER: ICA Fluor Daniel (Updated 31-Dec-02) PEMEX EXPLORATION & PRODUCTION (PEP)
PLATFORM RELATED PROJECTS HISTORY Liftboat leasing [AWARDED] Project description Scope: Support for termination, maintenance & data acquisition of marine wells/ Logistics, installation, dismantlement of modules, structures, units and equipment components for well dirilling & maintenance or for production facilities/ Depth of water 180'+/ Independent legs 250'+ no extensions allowed/ DGPS required Location: GOM Term: 548 days from 18.Feb.80 to 18.Aug.09 Contracts: Leasing Down payment: n/a Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Bid follow-up: Ref: 18575088-022-07 Release: 18.Oct.07 Site visit: n/a 1st clarification meeting: 05.Nov.07 2nd clarification meeting: 12.Nov.07 3rd clarification meeting: 16.Nov.07 4th clarification meeting: 21.Nov.07 Closing: 23.Nov.07 Submission & opening: 29.Nov.07 Ruling: 19.Dec.07 Finalizing: 08.Jan.07 Registered bidders (not comprehensive) 1.Third Ocean Vessel and Rig 2.Power Marine 3.Cotemar 4.Servicios Maritimos de Campeche 5.Iner Servicios 6. Nabors 7.Perforaciones Maritimas Mexicanas (Protexa) 8.Geomarex 9.Superior Energy Services 10.Todco Status AWARDED Ruling: 19.Dec.07 Atlantic Marine Services BV: $31million Updated 19.Dec.07 Offshore recondition & maintenance (2) [AWARDED] Project description Scope: Recondition & maintenance of offshore platforms & process centers with a subsea vessel (CA) Locations: Office & yards in Ciudad del Carmen Campeche Platforms: Campeche basin GOM Term: 1826 days from 15.Jan.08 Contracts: Unit prices Down payment: n/a Local content: +10% Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $42m+ Subcontracts allowed: Inspection for non-destructive testing/ diving/ satellite positioning Bid follow-up: Ref: 18575108-052-07 Release: 09.Oct.07 Site visit: n/a 1st clarification meeting: 19.Oct.07 2nd clarification meeting: 09.Nov.07 3rd clarification meeting: 14.Nov.07 Deadline for questioning & 4th clarification meeting: 16.Nov.07 5th clarification meeting: 22.Nov.07 Closing: 22.Nov.07 Submission & opening: 28.Nov.07 Registered bidders (not comprehensive) 1.Servicios Maritimos de Campeche 2.Condux (Protexa) 3.Cotemar 4.Mantenimiento Marino de Mexico (Halliburton) 5.Oceanografia Status AWARDED Ruling: 18.Dec.07 Cotemar: $340million Updated 19.Dec.07 Offshore recondition & maintenance (1) [AWARDED] Project description Scope: Recondition & maintenance of offshore platforms with a subsea vessel (SA) Locations: Office & yards in Ciudad del Carmen Campeche Platforms: Campeche basin GOM Term: 1826 days from 21.Dec.08 Contracts: Unit prices Down payment: n/a Local content: +10% Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $24m+ Subcontracts allowed: Inspection for non-destructive testing/ diving/ satellite positioning Bid follow-up: Ref: 18575108-057-07 Release: 18.Sep.07 Site visit: n/a 1st clarification meeting: 24.Sep.07 9th clarification meeting & closing: 31.Oct.07 Submission & opening: 06.Nov.07 Registered bidders (not comprehensive) 1.Cotemar 2.Mantenimiento Marino de Mexico (Halliburton) 3.Condux (Protexa) 4.Servicios Maritimos de Campeche 5.Subtec 6.Paredon 7.Oceanografia Status AWARDED Ruling: 23.Nov.07 Cotemar: $295million Updated 07.Feb.08 Offshore maintenance works (5) [AWARDED] Project description Scope: Offshore maintenance work with a dynamic positioning vessel Location: Campeche basin GOM Term: 5yrs starting 01.Feb.08 Contracts: Unit prices Down payment: n/a Local content: +10% Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $21m+ Subcontracts allowed: Inspection for non-destructive testing/ diving/ satellite positioning Bid follow-up: Ref: 18575108-045-07 Release: 09.Oct.07 Site visit: n/a 1st clarification meeting: 22.Oct.07 2nd clarification meeting: 05.Nov.07 3rd clarification meeting: 13.Nov.07 4th clarification meeting: 23.Nov.07 5th clarification meeting & closing: 30.Nov.07 Submission & opening: 06.Dec.07 Ruling: 08.Jan.07 Finalizing: 01.Feb.07 Registered bidders (not comprehensive) 1.Condux (Protexa) 2.Servicios Maritimos de Campeche 3.Construcciones Integrales del Carmen 4.Oceanografia 5.Mantenimiento Marino de Mexico (Halliburton) 6.Diavaz 7.Cotemar 8.Subtec Potential participants CTM Campeche Construcciones Status AWARDED Ruling: 08.Jan.07 Oceanografia: $215million Updated 18.Jan.08 Offshore maintenance works (4) [DECISION PENDING] Project description Scope: Offshore maintenance work with a dynamic positioning vessel Location: Campeche basin GOM Term: 5yrs starting 01.March.08 Contracts: Unit prices Down payment: n/a Local content: +10% Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $17m+ Subcontracts allowed: Inspection for non-destructive testing/ diving/ satellite positioning Bid follow-up: Ref: 18575108-044-07 Release: 21.Aug.07 Site visit: n/a 1st clarification meeting: 18.Sep.07 2nd clarification meeting: 26.Sep.07 5th clarification meeting: 16.Oct.07 6th clarification meeting: 25.Oct.07 7th clarification meeting: 07.Nov.07 8th clarification meeting: 16.Nov.07 9th clarification meeting & closing: 23.Nov.07 Submission & opening: 29.Nov.07 Registered bidders (not comprehensive) 1.Cotemar 2.CTM Campeche Construcciones 3.Servicios Maritimos de Campeche 4.Diavaz 5.Subtec 6.Condux (Protexa) 7.Global Offshore 8.Mexicana de Servicios Subacuaticos 9.Oceanografia 10.ARB Arendal 11.Construcciones Integrales del Carmen 12.TMM 13.CCC Status SUBMITED Updated 30.Nov.07/rev 18.Apr.08 Offshore installation works [AWARDED] Project description Scope: Installation & recovery of platforms/ installation of heavy equipment Location: Campeche basin GOM Term: 1826 days from 09.Apr.08 to 08.Apr.13 Contracts: Unit prices Down payment: n/a Local content: 10% Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $55m+ Subcontracts allowed: Inspection for non-destructive testing/ diving/ satellite positioning/ MEBI & METI Bid follow-up: Ref: 18575108-029-07 Release: 31.May.07 Site visit: n/a 1st clarification meeting: 29.Jun.07 5th clarification meeting: 31.Jul.07 (last) Closing: 31.Jul.07 Submission & opening: 06.Aug.07 Registered bidders (not comprehensive) 1.Cotemar 2.Construcciones Integrales del Carmen 3.Global Offshore Mexico 4.Subtec 5.Diavaz 6.Oceanografia 8.Condux (Protexa) Status AWARDED Decision: 24.Jan.08 Oceanografia: $445million Updated 25.Jan.08 PEMEX EXPLORATION & PRODUCTION (PEP)
MSC HISTORY 15. CHICONTEPEC II [AWARDED] Project Scope: Integrated works/services for expoitation of onshore oil fields Location: Veracruz-Puebla Contract Commissioner: Pemex-PEP Unit prices Term: 4yrs Selection basis: Lowest price bid for compliant proposals Bidders profile Company/consortium Combine equity: $43+m Subcontracts allowed: Bid follow-up Ref: 18575051-050-06 Release: 02.Jan.07 Site visit: 16.Jan.07 1st clarification meeting: 23.Jan.07 2nd clarification meeting: 02.Feb.07 3rd clarification meeting: 09.Feb.07 4th clarification meeting: 15.Feb.07 5th clarification meeting: 21.Feb.07 6th clarification meeting: 22.Feb.07 7th clarification meeting: 21.Mar.07 8th clarification meeting: 02.Apr.07 (last) Closing: 02.May.07 Preliminary revision of proposal packages: 03.May.07 Submission & opening: 08.May.07 Registered bidders 1.D&S Petroleum 2.ICA Fluor Daniel 3.Industrial Perforadora de Campeche (IPC) 4.Servicios Integrales GSM (Carso) 5.Tradeco 6.Baker Hughes 7.Turbinas Solar 8.MI Drilling Fluids 9.Dowell Schlumberger 10.Halliburton 11.Oilpatch Enterprises Potential participants Vetco Gray, ABB, Emerson Process Management Status AWARDED Decision: 13.Jun.07 DOWELL SCHLUMBERGER DE MEXICO: $1395million Updated 25.Jun.07 14. BLOCK EURO [VOID] Project Scope: Gas field development/ infrastructure/ maintenance Location: Burgos basin Contract Commissioner: Pemex-PEP Unit prices Term: 15yrs starting 02.May.07 Selection basis: Lowest price bid for compliant proposals Bidders profile Company/consortium Combine equity: $14+m Subcontracts allowed: Any activity but project management Bid follow-up Ref: 18575110-036-06 Release: 10.Aug.06 Site visit: 24.Aug.06 7th clarification meeting: 12.Jan.07 8th clarification meeting: 26.Jan.07 9th clarification meeting: 15.Feb.07 10th clarification meeting: 21.Feb.07 Deadline for registration: 28.Feb.07 Submission & opening: 06.Mar.07 Decision: 06.Mar.07 Registered bidders 1.Repsol 2.Swecomex 3.Tecpetrol (Techint) 4.PTD (Petrobras) 5.Creatica 6.Cobra 7.EnCana 8.Petrodomos 9.GOIMSA Potential participants Global Drilling Fluids Status Tender declared VOID on 06.Mar.07 A new RFPs to be announced shortly Updated 09.Mar.07 13. BLOCK MONCLOVA [AWARDED] Project Scope: Gas field development/ infrastructure/ maintenance Location: Burgos basin Contract Commissioner: Pemex-PEP Unit prices Term: 15yrs starting 02.May.07 Selection basis: Lowest price bid for compliant proposals Bidders profile Company/consortium Combine equity: $14+m Subcontracts allowed: Any activity but project management Bid follow-up Ref: 18575110-035-06 Release: 10.Aug.06 Site visit: 23.Aug.06 7th clarification meeting: 11.Jan.07 8th clarification meeting: 24.Jan.07 9th clarification meeting: 14.Feb.07 10th clarification meeting: 20.Feb.07 Deadline for registration: 07.Mar.07 Submission & opening: 13.Mar.07 Decision: 22.Mar.07 Registered bidders 1.Repsol 2.PTD (Petrobras) 3.Construcciones Mecanicas de Monclova (COMMSA) 4.Creatica 5.Lewis 6.Minera Carbonifera Rio Escondido (GAN) 7.Coahuila Industrial Minera (GAN) 8.Monclova Pirineos Gas 9.EnCana 10.Perforadora Central Status AWARDED Construcciones Mecanicas de Monclova (COMMSA): $440million Updated 23.Mar.07 12 BLOCK NEJO [AWARDED] Project Scope: Gas field development/ infrastructure/ maintenance Location: Burgos basin Contract Commissioner: Pemex-PEP Unit prices Term: 15yrs starting 02.May.07 Selection basis: Lowest price bid for compliant proposals Bidders profile Company/consortium Combine equity: $14+m Subcontracts allowed: Any activity but project management Bid follow-up Ref: 18575110-034-06 Release: 10.Aug.06 Site visit: 22.Aug.06 7th clarification meeting: 10.Jan.07 8th clarification meeting: 22.Jan.07 9th clarification meeting: 13.Feb.07 10th clarification meeting: 19.Feb.07 Deadline for registration: 21.Feb.07 Submission & opening: 27.Feb.07 Decision: 05.Mar.07 Registered bidders (not comprehensive) 1.Repsol 2.Cobra 3.PTD (Petrobras) 4.Tecpetrol (Techint) 5.Swecomex 6.EnCana 7.Perforadora Central Status AWARDED Grupo Cobra (es): $930million Updated 09.Mar.07 11. PANDURA-ANAHUAC Scope: Gas field development/ infrastructure/ maintenance Location: Burgos basin Term: 15yrs from 14.Jan.05 Contract: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium Combine equity: $10+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-060-04 Release: 29.Jul.04 Submission: 26.Oct.04 Registered bidders: 1.Industrial Perforadora de Campeche (IPC) 2.CNPC Services Venezuela Ltd 3.Monterrey Services and Technology 4.Constructora y Perforadora Latina 5.Itera International Energy Corporation 6.Halliburton de Mexico Decision: 26.Oct.04 WINNER: Industrial Perforadora de Campeche (Mx) - Desarrollo y Servicio Petrolero (Mx)/ $900million/ 15yrs (Updated 27.Oct.04) 10. RICOS Scope: Gas field development/ infrastructure/ maintenance Location: Burgos basin Term: 15yrs from 14.Jan.05 Contract: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium Combine equity: $10+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-061-04 Release: 29.Jul.04 1st Bidders meeting: 07.Sep.04 2nd Bidders meeting: 22.Sep.04 3rd Bidders meeting: 05.Oct.04 4th Bidders meeting: 13.Oct.04 5th Bidders meeting: 25.Oct.04 (next event) Registration deadline: 03.Nov.04 Submission: 09.Nov.04 Registered bidders: 1.Constructora y Perforadora Latina 2.Dowell Schlumberger de Mexico 3.Industrial Perforadora de Campeche (IPC) 4.Itera International Energy Corporation 5.Monterrey Services & Technology Offers disclosure: 11.Nov.04 Decision: 08.Feb.05/ VOID (Updated 14.Oct.04) 9. MONCLOVA Scope: Gas field development/ infrastructure/ maintenance Location: Burgos basin Term: 15yrs from 21.Jan.05 Contract: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium Combine equity: $5+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-064-04 Release: 17.Aug.04 1st Bidders meeting: 06.Oct.04 2nd Bidders meeting: 18.Oct.04 (next event) Registration deadline: 01.Dec.04 Submission: 07.Dec.04 Registered bidders: 1.Hullera Mexicana Potential bidders: 1.Hoper's 2.FIEMSA 3.Technopet 4.CORROSA 5.COIMSA 6.GIMSA Montajes 7.Vetra Group 8.Benchmark Pipeline 9.Cody E Oil Offers disclosure: 09.Dec.04 Decision: 15.Feb.06 WINNER: Hullera Mexicana (Mx) - Energy Milenium (Mx) - Andrews Technologies de Mexico (Mx)- Yuma Exploration (US) - Aries Operating (US)/ $456million/ 15yrs (Updated 16.Feb.05) 8. PIRINEO Scope: Gas field development/ infrastructure/ maintenance Location: Burgos basin Term: 15yrs from 21.Jan.05 Contract: Unit prices Down payment: n/a Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium Combine equity: $5+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-065-04 Release: 17.Aug.04 1st Bidders meeting: 07.Oct.04 2nd Bidders meeting: 19.Oct.04 (next event) Registration deadline: 08.Dec.04 Submission: 14.Dec.04 Registered bidders: 1.Hullera Mexicana Potential bidders: 1.Andrews Technologies 2.CNPC Services Venezuela Ltd 3.Technopet 4.Benchmark Pipeline International 5.COIMSA 6.GIMSA Montajes 7.Vetra Group Offers disclosure: 16.Dec.04 Decision: 24.Feb.05 WINNER: Constructora Industrial Monclova (Mx) - Materiales La Gloria (Mx) - Alianz Petroleum (Mx) - Steel Serv (Mx) - Suelopetrol (Ve) - NCT (Ve) - Petrotesting Colombia (Co)/ $645million/ 15 yrs (Updated 25.Feb.05) 7. OLMOS Scope: Gas field development/ infrastructure/ maintenance Location: Burgos basin Term: 15yrs from 20.Feb.04 Contract: Unit prices Down payment: n/a Selection basis: Lowest price bid from qualified proposals Bidders profile: Company/consortium Combine equity: $5+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-138-03 Release: 29.Jul.03 Registered bidders: 1.Lewis Energy Group Submission: 14.Jan.04 Offers disclosure/decision: 15.Jan.04 WINNER: Lewis Energy Group $343.6million for 15yrs (Updated 16.Jan.04) 6. FRONTERIZO Scope: Gas field development/ infrastructure/ maintenance Location: Burgos Basin Term: 15yrs from 09.Jan.04 Contract: Unit prices Down payment: n/a Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium Combine equity: $4+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-137-03 Release: 29.Jul.03 Registered bidders: 1.Skanska Mexico 2.D&S Petroleum (sole qualified bidder) 3.Nexen Petroleum International 4.Amistad Energy Corp (disqualified) Submission: 18.Nov.03 Offers disclosure/decision: 19.Nov.03 WINNER: Petroleo Brasileiro Mexico: Petrobras-Teikoku Oil Co-D&S Petroleum (Diavaz) $265million for 15yrs (Updated 19.Nov.03) 5. RICOS Scope: Gas field development/ infrastructure/ maintenance Location: Burgos Basin Term: 20yrs from 09.Jan.04 Contract: Unit prices Down payment: n/a Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium Combine equity: $32.5+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-128-03 Release: 17.Jul.03 Registered bidders: 1.Exxon Mobil 2.Totalfina Oil & Gas Mexique 3.Obrascon Huarte Lain 4.Repsol Exploracion Submission: 12.Nov.03 VOID: No proposals submitted (Updated 13.Nov.03) 4. CORINDON-PANDURA Scope: Gas field development/ infrastructure/ maintenance Location: Burgos Basin Term: 20yrs from 09.Jan.04 Contract: Unit prices Down payment: n/a Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium Combine equity: $71.5+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-131-03 Release: 17.Jul.03 Registered bidders:1.Totalfina Oil and Gas Mexique 2.Repsol Exploracion/YPS 3.D&S Petroleum 4.Halliburton de Mexico 5.Techint Submission: 05.Nov.03 VOID: No proposals submitted (Updated 05.Nov.03) 3. MISION Scope: Gas field development/ infrastructure/ maintenance Location: Burgos Basin Term: 20yrs from 09.Jan.04 Contract: Unit prices Down payment: n/a Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium Combine equity: $10.5+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-130-03 Release: 17.Jul.03 Registered bidders (not comprehensive): 1.Techint (sole actual bidder) 2.Repsol Exploracion/YPS 3.D&S Petroleum 4.Exxon Mobil Mexico 5.Totalfina Oil and Gas Mexique Submission: 29.Oct.03 Offers disclosure/decision: 30.Oct.03 WINNER: Elina del Bajio: Elina-Techint-Industrial Perforadora de Campeche (IPC) $1,036million for 20yrs (Updated 30.Oct.03) 2. CUERVITO Scope: Gas field development/ infrastructure/ maintenance Location: Burgos Basin Term: 15yrs from 09.Jan.04 Contract: Unit prices Down payment: n/a Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $9+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-136-03 Release: 29.Jul.03 Registered bidders (not comprehensive): 1.Techint 2.D&S Petroleum (sole actual bidder) 3.Nexen Petroleum International Submission: 22.Oct.03 Offers disclosure/decision: 23.Oct.03 WINNER: Petrobras/Teikoku Oil Co/D&S Petroleum (Diavaz) $260million for 15yrs (Updated 23.Oct.03) 1. REYNOSA-MONTERREY Scope: Gas field development/ infrastructure/ maintenance Location: Burgos Basin Term: 20yrs from 09.Jan.04 Contract: Unit prices Down payment: n/a Selection basis: Least offer among technically approved proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: $43+m Subcontracts allowed: Any activity but contract/project management Bid follow-up: Ref: 18575008-129-03 Release: 17.Jul.03 Registered bidders: 1.Repsol Exploracion/YPS (sole actual bidder) 2.Exxon Mobil Mexico 3.Totalfina Oil and Gas Mexique 4.Halliburton Mexico Submission: 15.Oct.03 Offers disclosure: 16.Oct.03 Decision: 16.Oct.03 WINNER: Repsol Exploracion/YPS $2,437million for 20yrs (Updated 16.Oct.03) PEMEX GAS (PGPB)
MODULAR CRYOGENIC PROJECT [AWARDED] Project Description: Modular cryogenic units 5 & 6, LPG/gasoline terminal, auxiliary services and integration to the gas process complex Location: Burgos gas process complex in Reynosa, Tamaulipas Scope: Basic & detailed engineering/ permitting/ procurement/ construction/ installation/ tests/ training/ commissioning/ As-built documentation Contract Commissioner: Pemex Gas PGPB (Govt) Type: Mixed lump sum/unit prices Term: 741 days starting 15.Jan.07 Selection basis: Best qualified amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Comprehensive experience in at least two similar projects ISO 9001 certified Combine equity: $50m+ Bid follow-up Ref: 18572039-001-06 Release: 19.Sep.06 Site visit: 26.Sep.06 8th clarification meeting: 16.Nov.06 (last) Deadline for registration: 24.Nov.06 Submission & opening: 30.Nov.06 Decision: 22.Dec.06 Finalizing: 12.Jan.07 Registered bidders 1.Gutsa 2.ICA Fluor Daniel 3.Dragados 4.Lockwood Greene 5.Techint 6.Tubinas Solar 7.Inelectra 8.Skanska 9.Jantesa 10.Siemens 11.Areva T&D 12.Synercon 13.Invensys 14.Alcatel Potential co-bidders Elliot Co, Grupo R, ABB, Aritas Status AWARDED ICA Fluor Daniel: $275million (Updated 26.Jan.07) FEDERAL COMMISSION OF ELECTRICITY (CFE)
POWER PLANT HISTORY HYDROELECTRIC LA YESCA (2nd round) [AWARDED] Project Capacity: 2x375 MW Location: Jalisco-Nayarit Term: 1720 days starting 17.Sep.07 Scope: Construction & financing (100%) Contract: Mixed lump sum/unit prices Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $275m+ Local content: 5% Subcontracts allowed: Bid follow-up Ref: 18164093-001-07 Release: 27.Feb.07 Site visit: 06.Mar.07 1st Clarification meeting: 29.Mar.07 7th Clarification meeting: 31.Jul.07 Closing: 01.Aug.07 Submission & opening: 07.Aug.07 Registered bidders 1.ICA 2.CARSO-IDEAL 3.Techint 4.Gutsa 5.Grupo Mexico 6.Impregilo 7.Voith Siemens 8.Prolec GE 9.La Peninsular 10.Construcciones y Trituraciones 11.Alstom 12.Va Tech Escher Wyss 13.Power Machines Potential participants GPPP, Cemex, ISA Ingenieria, PCM Concreto, Andrade Gutierrez Actual proposals 1.ICA-Adisa-La Peninsular: $768million 2.CARSO-IDEAL: $808million 3.Impregilo-Techint: $856million Ruling: 06.Sep.07 ICA-Adisa-La Peninsular: $768million Status AWARDED Updated 07.Sep.07 ------------------------ 1st-round RECORD Registered bidders: 1.Mitsubishi 2.ISA 3.Gutsa 4.Power Machines de Mexico 5.Condux (Protexa) 6.ICA 7.GE 8.IDEAL 9.Techint 10.Sinohydro 11.Alstom 12.Mexico Constructora Industrial 13.Construcciones y Trituraciones 14.Obracon Huarte Lain 15.La Peninsular 16.Andrade Gutierrez 17.Tradeco 18.Va Tech Escher Wyss 19.Odebrecht 20.Carso Infraestructura Proposals: 1.Sinohydro-Gutsa: 1053+197=$1250million 2.ICA-Adisa-CPH-Peninsular: 764+145=$909million 3.Impregilo-Techint: 678+127=$805million Ruling: Offers 1 & 2 higher than approved budget: $837million Offer 3 did not comply with technical requirements Tender declared VOID on 01.Nov.06 CC-SOLAR POWER PLANT AGUA PRIETA II [VOID] Project Description: Combined cycle plant formed by 2/3 gas turbogenerators with steam generators and auxiliary systems, one steam turbogenerator with auxiliary systems, one air condensator and complementary equipment. Also a solar camp to generate steam for the combined cycle. And the interconnection with a 230 kV substation. Gas capacity: 535.64 MW +/- 15% (summer conditions) Solar capacity: 24 MW Scope: Design/ engineering/ procurement/ construction/ installation/ tests/ training/ commissioning Location: Sonora Contract Commissioner: CFE (Govt) Type: Lump sum Term: 859 days starting 26.Sep.07 Financing: 100% gas capacity by contractor Donation: $49.35million for 100% solar capacity by GEF-World Bank Payment/milestone: Bid offer/ Provisional acceptance by CFE: 01.Feb.10 Selection basis: Best qualified amongst compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $100m+ Local content: 16% Subcontracts allowed: Design/ engineering/ construction/ commissioning Bid follow-up Ref: 18164093-022-06 Release: 29.Aug.06 Site visit: 06.Sep.06 1st clarification meeting: 04.Oct.06 12th clarification meeting: 05.Jul.07 13th clarification meeting: 19.Jul.07 14th clarification meeting: 31.Jul.07 (last) Closing: 02.Aug.07 Submission & opening: 08.Aug.07 Registered bidders 1.Iberdrola 2.Abener 3.Isolux 4.Dragados 5.Mitsubushi 6.Sener 7.Man Ferrostaal 8.Siemens 9.Socoin 10.Cobra 11.GE 12.El Paso 13.Techint 14.Itochu 15.ICA Fluor Daniel Status Tender declared VOID on 08.Aug.06 A new RFPs to be announced shortly Updated 10.Aug.07 NUCLEAR POWER PLANT LAGUNA VERDE (1st Fase) [AWARDED] Project Description: Renewal of units 1 & 2 (2x810 MW) Scope: Design/ engineering/ procurement/ dismantlement/ construction/ installation/ tests/ training/ commissioning Location: Veracruz Term: 1392 days starting 01.Mar.07 Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: $130m+ Local content: 10% Subcontracting: Allowed Contract Type: Lump sum Financing: 100% by contractor Payments/milestones: Unit 1: Provisional acceptance by CFE scheduled for 05.Jul.10 Unit 1: Full acceptance by CFE Unit 2: Provisional acceptance by CFE scheduled for 20.Dec.10 Unit 2: Full acceptance by CFE Selection basis: Lowest price bid from compliant proposals Bid follow-up Ref: 18164093-013-06 Release: 25.May.06 Deadline for 6th-questioning: 17.Nov.06 6th clarification meeting: 30.Nov.06 (last) Closing: 13.Jan.07 Submission & opening: 19.Jan.07 Decision: 12.Feb.07 Finalizing: 28.Feb.07 Registered bidders 1.Siemens 2.Sener (es) 3.ICA Fluor Daniel 4.Techint 5.Alstom 6.GE 7.Iberdrola 8.Elecnor 9.Mitsubishi Proposals 1.GE-Diamante: $951.5million 2.Siemens-Techint-Sener: $695million 3.Iberdrola-Alstom: $605million Decision: 12.Feb.07 Finalizing: 28.Feb.07 (next) Status AWARDED Iberdrola Ingenieria y Consultoria Mexico - Iberdrola Ingenieria y Construccion - Alstom Mexicana: $605million Updated 12.Feb.07 CC POWER PLANT NORTE [AWARDED] Project Commissioner: CFE (Govt) Location: Durango Capacity: 333-450 Mw Scope: Engineering Construction Operation Financing & Owning Construction program: 739 days starting 24.May.07 Contract: External Power Producer Term: 25 years Local content: 25% Min Selection basis Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: US$92m+ (local currency 1b+) Bid follow-up Ref: 18164093-015-05 Release: 15.Nov.05 Register deadline: 17.Oct.06 Submission: 23.Oct.06 Offers opening: 19.Jan.07 Decision: 05.Mar.07 Registered bidders 1.Hitachi 2.GE 3.Techint 4.Chubu 5.Siemens 6.Transalta 7.Electricite de France 8.Constructora Andrade Gutierrez 9.Itochu 10.Petrobras 11.Mitsubishi 12.Fenosa 13.Valladolid International Investments 14.Energia Azteca (Intergen) 15.Iberdrola 16.Mitsui 17.Prolec GE 18.ICA Fluor Daniel 19.Energia Termodurango 20.ABB Status AWARDED Union Fenosa Internacional: 0.6294 Pesos/kWh (DOF 15.May.07) (Updated 09.Mar.07) HYDROELECTRIC LA YESCA (1st round) [VOID] Project Capacity: 2x375 MW Location: Jalisco-Nayarit Term: 1691 days Project start/finish: 13.Nov.06/30.Jun.11 Scope: Construction & financing (100%) Contract: Mixed lump sum/unit prices Bid follow-up Ref: 18164093-011-06 Release: 18.May.06 12th Clarification meeting: 06.Oct.06 (last) Submission & opening: 13.Oct.06 Registered bidders 1.Mitsubishi 2.ISA 3.Gutsa 4.Power Machines de Mexico 5.Condux (Protexa) 6.ICA 7.GE 8.IDEAL 9.Techint 10.Sinohydro 11.Alstom 12.Mexico Constructora Industrial 13.Construcciones y Trituraciones 14.Obracon Huarte Lain 15.La Peninsular 16.Andrade Gutierrez 17.Tradeco 18.Va Tech Escher Wyss 19.Odebrecht 20.Carso Infraestructura Proposals 1.Sinohydro-Gutsa: 1053+197=$1250million 2.ICA-Adisa-CPH-Peninsular: 764+145=$909million 3.Impregilo-Techint: 678+127=$805million Ruling Offers 1 & 2 higher than approved budget: $837million Offer 3 did not comply with technical requirements Status Tender declared VOID on 01.Nov.06 A new RFPs to be announced shortly (Updated 02.Nov.06) CC POWER PLANT BAJA CALIFORNIA (2nd round) [AWARDED] Project Capacity: 252.3 MW +/-15% Scope: Engineering Procurement Construction & Financing Construction program: 858 days starting 25.Oct.06 Location: Tijuana BC Contract Turn key-Lump sum Commissioner: CFE (Govt) Local content: +18% Selection basis: Lowest price bid from compliant proposals Bidders profile Company/consortium from countries having a free trade agreement with Mexico Combine equity: US$55m+ Bid follow-up Ref: 18164093-017-06 Release: 18.Jul.06 Submission & opening: 29.Aug.06 Decision: 27.Sep.06 Bidders 1.Isolux 2.Abener 3.Dragados 4.Itochu 5.GE 6.Siemens 7.Techint 8.Socoin Winner Isolux-Techint: $174million (Updated 13.Oct.06) COAL POWER PLANT PACIFICO [AWARDED] Location: Lazaro Cardenas (Mexico West coast) Capacity: 648 MW Scope: Engineering Construction & Financing Construction program: 1342 days from 31.May.06 to 01.Feb.10 Contract: Turn key-Lump sum Local content: 15% Min Selection basis: Lowest price bid from compliant proposals Bidders profile: Company/consortium from countries having a free trade agreement with Mexico Combine equity: US$95m+ Bid follow-up: Ref: 18164093-003-03 Release: 22.Jul.03 Registered bidders (not comprehensive): 1.Techint 2.ICA Fluor Daniel 3.Alstom Power Mexico 4.Skanska Mexico 5.Mitsubishi Corporation 6.Mitsui & Co 7.Dragados Proyectos Industriales de Mexico 8.Hitachi 9.Soluziona Tecnologias de Informacion 10.Siemens 11.Itochu Corporation 12.Credit Agricole Indosuez 13.Skoda Export 14.GE International 15.ABB Utilities 16.Construtora Andrade Gutierrez 16.ABB Mexico Decision: 06.Dec.05 Mitsubishi Corporation - Carboelectrica Diamante: $611million (Updated 06.Dec.05) 2. CC Power plant Mexicali II Ref: 18164093-002-02/ Cancelled 3. CC Power plant Tamazunchale 18164093-001-03/ 30.Jun.04/ Iberdrola Mexico/ IPP/ 25yrs/ 839-1135 MW 5. CC Power plant Tuxpan V 18164093-013-02/ 17.Dec.03/ Mitsubishi Corporation-Kyushu Electric Power Co/ IPP/ 25yrs/ 431-527 MW 7. CC Power plant Valladolid III 18164093-032-02/ 14.Oct.03/ Mitsui & Co Ltd/ IPP/ 25yrs/ 430-525 MW 8. CC Power plant Altamira V 18164093-001-02/ 22.Oct.03/ Iberdrola Mexico/ IPP/ 25yrs/ 975 MW 9. Hydroelectric El Cajon 18164093-011-02/ 14.Mar.03/ Constructora Internacional de Infraestructura: ICA-Promotora e Inversora Adisa-La Peninsular Compania Constructora-EnergomachExport Power Machine/ $749.5million/ $0.0685/Kw-h/ 2x375 MW